HomeMy WebLinkAboutNC0088366_Pretreatment_Annual_Report_20240228 r ■ HARNETT
REGIONAL
rWATER www.harnettwater.org
PO Box 1119
700 McKinney Parkway
February 20, 2024 Lillington, NC 27546
Keyes McGee ph: 910-893-7575
NC-DENR, DEQ, PERCS Unit fax: 910-893-6643
1617 Mail Service Center
Raleigh NC 27699-1617
Subject: 2023 PAR
Dear Keyes,
I am sending the enclosed information to you to satisfy the requirements for the 2023 Pretreatment
Annual Report. Harnett County Public Utilities' North Harnett Regional WWTP is considered a full
program. Our permitted flow is now 7.5 MGD. We currently have one categorical user, Bulldog Hose in
Angier. We also have several local municipalities discharging to us.The Town of Fuquay-Varina (Kenneth
Branch area) began discharging to the N. Harnett Regional Plant on July 5, 2007. The Town of Fuquay-
Varina is classified as a Satellite POTW. We are currently sampling weekly for BOD,TSS, NH3,TKN,TP,
and monthly for metals from the meter vault. Other pollutants may be added as deemed necessary to
protect the North Regional Plant. We have an IJA with Fuquay-Varina that was approved by PERCS in
2009.
The Town of Angier also discharges to the North Harnett Plant.This started on May 3'd, 2010.The
second and third wastewater lines from Angier to Lillington are now contributing roughly 146,000 gpd.
We have an IJA with Angier that was approved by PERCS in November 2013.The Town is classified as a
Satellite POTW. Harnett County is currently sampling from the Angier Meter Vault on a monthly basis.
We test for BOD,TSS, NH3, metals,TKN,TP and Oil and Grease. 0&G is required of the Bulldog Hose
facility since they are a categorical discharger(428 and 463)and O&G is required by EPA.The Town is
maintaining control of their collection system as well as their FOG program.
The County is responsible for the Pretreatment Program in Angier, including the Bulldog Hose Plant.
Their limit for O/G is 100 mg/I.Samples are collected at the sampling port past the after-cooler.They
had some issues finding an appropriate method of recording flow, but now have remedied that, as well
as changing out the lubricant for the nipples on the hose to reduce O/G.
The South Harnett Wastewater Plant is a 15MGD plant located on Shady Grove Road in Spring Lake. A
Long Term Monitoring plan was developed and the plant is considered a full program.We have
submitted a HWA in June 2022. The permit for the CHARA group to dispose of coal ash leachate from a
Duke Power site in Moncure, NC was extended (or modified)for another year.Sampling requirements
are currently quarterly. Contributions are lower than last year as CHARA is working on closure of the
site. We have ended our agreement with the Sampson County landfill to pump and haul leachate from
the landfill site.
The enclosed Pretreatment Program Information Database is complete and accurate.
I certify, under penalty of law,that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the information,the
information submitted is,to the best of my knowledge and belief,true, accurate,and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of
fines and imprisonment for knowingly submitting false information
If there is any more information you need, please give me a call.
Sincerely,
l
Vicky tPayvs
NHRWWTP Pretreatment Coordinator
Enclosures: PT Program Info Database, SNCR Form, PPS, IDSF forms: Chara and Bulldog Hose
Chapter 9, PAR Guidance
Pretreatment Performance Summary (PPS)
1. Pretreatment Town Name: Harnett Regional Water
2. "Primary" N PD ES Number N C00 21636
or N on_D i scharge Permit#if applicable=>
3. PA R begi n Date, pl ease enter 01/01/yy 3. => 1/1/2023
4. PAR end D ate, pl ease enter 12/31/yy 4. => 12/31/2023
5. Total number of SI Us, i ncl udes Cl Us 5. => 1
6. Number of Cl Us 6. _> 1
7. Number of SI Uswith no IUP, or with an expired IUP 7. _> 0
8. Number of SI Us not inspected by POTW 8. => 0
9. Number of SI Us not sampled by POTW 9. => 0
10. Number of SI Us in SNC dueto I UP Limit violations 10. => 0
11. N umber of SI U s i n SN C due to Reporti ng vi of ati ons 11. => 0
12. Numberof SlUsin SNC duetoviolation of a compliance schedule, CO,AOorsimilar 12. => 0
13. Number ofClUsinSNC 13. => 0
14. Number of SI Us included i n publ i c notice 14. => 0
15 Total number of SI Us on a compliance schedule, CO, AO or si mi I ar 15. => 0
16. Number of NOVs, NNCs or similar assesed to SI Us 16. => 0
17. Number of Civil Penal ti es assessed to SIUs 17. => 0
18. N umber of Cri mi nal Penal ti es assessed to SI U s 18. => 0
19. Total A mount of Ci A I Penal ti es Col I ected 19. => $ 0
20. N u mber of I U s f rom whi ch penal ti es col I ected 20. => 0
Foot Notes: AO Administrative Order IUP Industrial User Pretreatment Permit POTW Publicly Owned Treatment Works
CIU Categorical Industrial User NNC Noticeof Non-Compliance SIU Significant Industrial User
CO Consent Order NOV Noticeof Violation SNC Significant Non-Compliance
IU Industrial User PAR Pretreatment Annual Report
revised 1/2018: PAR PPS 2018
Pretreatment Annual Report (PAR) Control Authority, Town Name => Harnett Co. Public Utilities
Significant Non-Compliance Report(SNCR) WWTP Name => S.Harnett Regional
SNC LIMITS Violations Only
Use separate sheet for each WWTP NPDES# _> NC0088366
Cover year of report and previous year PAR begin date=> 1 1 2023 PAR end date=> 12 31 2023
Discuss actions taken in response to SNC in narrative Check here if no SI U's i n SNC for peri ods 1, 2, 3, 4 => X
Note• The information on this form does not confirm or deny that an industry contributed to NPDES violations
SNC STATUS check if
I UP Pipe I ndustry Name Parameter Y/N (NC,RP,or R) NPDEWiolation
# # 1 2 3 4 1 2 3 4 1 2 3 4
NONE
Dates:
1 - Previous Pretreatment Annual Report Year-1st 6 months: from to NC-Non compliant(SNC and no schedule issued)
2- Previous Pretreatment Annual Report Year-2nd 6 months: from to RP-Resolved pending(SNC and schedule i ssued)
3-Current Pretreatment Annual Report Year-1 st 6 months: from to R-Resolved(no SNC and schedule completed;
4-Current Pretreatment Annual Report Year-2nd 6 months: from to or permit modified,no SNC,and no overallocation)
Chapter name: PAR Guidance File name. PAR_SNCR.xls Revision date: August 1 Ct9@orehensiveGuide, Chapter 9, Section B, page Blank SNCR Form,Copy and use in your PAR PAR-SNCR Page of
Pretreatment Annual Report (PAR) Control Authority, Town Name => Harnett Regional Water
Significant Non-Compliance Report(SNCR) WWTP Name => N.Harnett Regional
SNC LIMITS Violations Only
Use separate sheet for each WWTP NPDES# _> NC0021636
Cover year of report and previous year PAR begin date=> 1 1 2023 PAR end date=> 12 31 2023
Discuss actions taken in response to SNC in narrative Check here if no SI U's i n SNC for peri ods 1, 2, 3, 4 => X
Note• The information on this form does not confirm or deny that an industry contributed to NPDES violations
SNC STATUS check if
I UP Pipe I ndustry Name Parameter Y/N (NC,RP,or R) NPDEWiolation
# # 1 2 3 4 1 2 3 4 1 2 3 4
NONE
Dates:
1 - Previous Pretreatment Annual Report Year-1st 6 months: from to NC-Non compliant(SNC and no schedule issued)
2- Previous Pretreatment Annual Report Year-2nd 6 months: from to RP-Resolved pending(SNC and schedule i ssued)
3-Current Pretreatment Annual Report Year-1 st 6 months: from to R-Resolved(no SNC and schedule completed;
4-Current Pretreatment Annual Report Year-2nd 6 months: from to or permit modified,no SNC,and no overallocation)
Chapter name: PAR Guidance File name. PAR_SNCR.xls Revision date: August 1 Ct9@orehensiveGuide, Chapter 9, Section B, page Blank SNCR Form,Copy and use in your PAR PAR-SNCR Page of
Pretreatment Annual Report (PAR) Control Authority, Industry
Industrial Data Summary Form (IDSF) Town Name=> Harnett Regional Water Name CHARA Brickhaven
Use separate forms for each industry/pipe WWTP Name=> SHRWWTP IUP# 6
Enter BDL values as<(value) N PD ES#_> 88366 Pipe# 1
1st 6 months, dates=> 1/1/2023 to 6/30/2023
2nd 6 months, dates=> 7/1/2023 to 12/31/23
mon s n mon s mon s n months mon s n months mon s n months
Total #of samples=> 181 184
M axi mum (mg/1) _>
or Maximum (I b/d) _>
or 6 mo., mo.Average(mg/1) _> 0.018418 0.014892 2.42 2 5.64 3 0.100 0.100
or Average Loading(I b/d) _>
%violations,(chronic SNC is>=66%) _> 21
%TRC violations, (SNC is>= 33%) _> o
%violations,(chronic SNC is>=66%) _> s
%TRC violations, (SNC is>= 33%) _>
rsenic
7ontMls2nd
72nd
712nd
Total #of samples=> st mont n months months months months
Maximum (mg/1) _>
or Maximum (I b/d) _>
or 6 mo.Average(mg/1) _> 0.013 0.0127 0.001 0.001 0.019 0.001 0.006 0.00625
or Average Loading(I b/d) _>
%violations, (chronic SNC is>=66%) _>
%TRC violations, (SNC is>= 33%) _> o
%violations,(chronic SNC is>=66%) _>
%TRC violations, (SNC is>= 33%) _>
Cyanide L eaa M ercury NICKel
st months n ont s months st m 2nd 6 months st mont s 2nd 6 months st mont s 2nd 6 months
Total #of samples=>
M axi mum (mg/1) _>
or Maximum (lb/d) _>
or 6 mo.Average(mg/1) _> 0 0 0.002 0.0065 0 0 0.009 0.001
or Average Loading(I b/d) _>
%violations, (chronic SNC is>=66%) _>
%TRC violations, (SNC is>= 33%) _> o
%violations,(chronic SNC is>=66%) _>
%TRC violations, (SNC is>= 33%) _>
BDL=>Below Detection Limit mg/I =>milligrams per liter
POTW must enter at least one of these IUP=>Industrial User Permit Ib/d=>pounds per day
four rows, Rease indicate how averages were calculated SNC=>Significant Non-Compliance mgd=>million gallonsper day
Avg period could be month,Qtr,or 6-month& if BDL, 1/2BDL,or zero values used. TRC=>Technical Review Criteria WWTP=>wastewater treatment plant
Chapter: PAR Guidance File name: PPlEbiii� isldea(iuJa�tefc1IB,pages 12,13,14 Blank IDSF Form,Copy and use in your PAR Number each set for each IUP pipe-Page of
Chapter: PAR Guidance File name: pages 12,13,14 Blank IDSF Form,Copy and use in your PAR Number each set for each IUP pipe-Page of
Pretreatment Annual Report (PAR)
Industry Name CHARA Brickhaven
Industrial Data Summary Form (IDSF) I U# 6
Use separate forms for each industry/pipe Pipe# 1
max
months n mon s 77 b months n mon s 77 b months n mon s I st 6 months 2nd 6 months
Total #of samples=>
M axi mum (mg/1) =>
or Maximum (lb/d) =>
or 6 mo. Average(mg/1) => 0.002 0.0013 0.001 0.001 0.013 0.0189 7.60 7.41
or Average Loading(I b/d) =>
%violations, (chronic SNC is>=66%) => 21
%TRC violations, (SNC is>= 33%) => o
%violations, (chronic SNC is>=66%) => s
%TRC violations, (SNC is>= 33%) =>
Antimony . ay Sulfide Molybdenum. 5lb/day
1st 6 months 2nd 6 months st Monts 2nd 6 months st Monts 2nd 6 months st Monts 2nd 6 months
Total #of samples=>
Maximum =>
or Minimum=>
or 6 mo.Average(mg/l)=> 0.055 0.0060 0.05 0.05 0.0915 0.2060 BQL BQL
%violations, (chronic SNC is>=66%) =>
%TRC violations, (SNC is>= 33%) => o N/A
%violations, (chronic SNC is>=66%) => N/A
%TRC violations, (SNC is>= 33%) => N/A
Chapter: PAR Guidance File name: PPlEbiii� isldea(iuJa�tefc1IB,pages 12,13,14 Blank IDSF Form,Copy and use in your PAR Number each set for each IUP pipe-Page of
Chapter: PAR Guidance File name: pages 12,13,14 Blank IDSF Form,Copy and use in your PAR Number each set for each IUP pipe-Page of
Pretreatment Annual Report(PAR) Control Authority, Harnett County Industry
Industrial Data Summary Form(IDSF) Town Name=> Public Utilities Name Bulldog Hose
Use separate forms for each industry/pipe WWTP Name=>N.Harnett Regional IUP# 3
Enter BDL values as<(value) NPDES#=> NCO021636 Pipe# 1
1st 6 months,dates=> 1-Jan-23 30-Jun-23
2nd 6 months,dates=> 1-Jul-23 to 31-Dec-23
Flow, mgd .0025MGD Aluminum Copper Zinc Lead
Ist
mon s n mon s mon s 2ncl 6 months I st 6 months 2ncl 6 months Istbmonths 2nclbmonths I st b months 2no b months
Total#of samples=> 6 6 1 1 1 1 1 1 1 1
(flows1n mgd) 0.000163 0.000062
* or Maximum (lb/d)=>
* 6 mo Average(mg/1)=> ND ND ND 0.014 3.17 0.442 ND ND
* or Average Loadi ng(I b/d)=>
%violations,(chronicSNCis>=66%)=> 0 10 N/A I N/A N/A N/A N/A N/A N/A N/A
%TRC violations,(SNC is>=33%)=> 01 0 N/A I N/A N/A N/A N/A N/A N/A N/A
s i rease
st 6 months n mont s st mont s n months
Total#of samples=> 1 1 6 7
* Maximum (mg/1)=>
* or Maximum (lb/d)=>
* 6 mo.Average(mg/1)=> 9.76 1.25
* or Average Loading(1 b/d)=>
%violations,(chronic SNC is>=66%)=> N/A N/A 0 0
%TRC violations,(SNC is>=33%)=> N/A N/A 0 0
BDL=>Below Detection Limit mgil=>milligrams per liter
POTW must enter at least one of these IUP=>Industrial User Permit Ib/d=>pounds per day
fourrows, Please indicate how averages were calculated SNC=>Significant Non-Compliance mgd=>million gallonsperday
Avg period could be month,Otr,or 6-month& if BDL,1/2BDL,or zero values used. TRC=>Technical Review Criteria WWTP=>wastewater treatment plant
Chapter: PAR Guidance File name: PAR_I DSF.xls Revision date:AuguEE6n Mensive Guide, Chapter 9,section B,pages 12,13,14 Blank I DSF Form,Copy and use in your PAR Number each set for each I UP pipe-Page of