Loading...
HomeMy WebLinkAboutNC0006033_Wasteload Allocation_19800114DIVISION OF ENVIRONMENTAL MANAGEMENT TECHNICAL SERVICES BRANCH January 14, 1980 M E M O R A N D U M TO: Bill Mills THRU: Forrest Westall *0 FROM: Mark Lewis )ro( r SUBJECT: Wasteload Allocation for Burlington Ind.-Lourd Plant As requested, the wasteload limits for phenols for the Burlington Industries-Lourd Plant (CTB36) has been calculated for several design flows. They are as follows: 7/10 = 120 cfs t^- flow of plant (MGD) lbs/day phe 0 0.647, 1 0.655 2 0.663 3 0.672 Is We recommend that a limit of 0.65 lbs/day phenol be written into the permits. If you have any questions, please contact us. ,� 1bs CewX "< J-'3s—_ 1 6I A-X�