Loading...
HomeMy WebLinkAboutNC0006033_Report_19970224/Vc000(a.33 JPS AutoProducts Cramenon Automotive P, dud, P.O. Box 279 651 Eagle Road Cramenon. NC 28032 (704) 825-9841 February 24, 1997 FAX (704) 825-7555 ry Mr. David A. Goodrich DEHNR Division of Water Quality P.O. Box 29535 Raleigh, N.C. 27626 Dear Mr. Goodrich: Reference our telephone conversation week ending 2/21/97. Per our discussion, please find the nitrogen/phosphorus sampling results for last year. Also, we have contracted Parson's Engineering as a consulting firm to advise us on retrofitting the Waste Treatment Plant to meet state requirements of a monthly average TP limit of 1.0 mg/l, and a summertime TN limit of 6 mg/l. We realize that the nutrient study should be completed by November 1, 1999. A task/time schedule is attached. Feel free to call me with any questions, Sincerely, p'�f Robert G. Kaufinan Plant Engineering Manager RGK/ltd cc: Mr. Jay Stewart - Collins & Aikman 'UNIT 30 28 26 24 22 20 18 2E 16 a 14 12 10 8 6 4 2 0 -- CRAMERTON WASTE TREATMENT PLANT EFFLUENT NITROGEN/PHOSP TO RIVER 1/17 1/24 1/31 2/7 2/14 2/21 3/6 4/10 5/7 6/4 7/17 8/9 9/27 12/5 1996 0 TOTAL NITROGEN 0 TOTAL PHOSPH 30 28 26 24 22 20 18 2i 16 IL 14 12 10 8 6 4 2 0 CRAMERTON AUTOMOTIVE PLANT INFLUENT NITROGEN/PHOSP 01/17 01/24 01/31 02/07 02/14 02/21 03/06 03/13 03/20 03/27 04/03 04/10 04/17 05/01 05/08 05/15 05/29 1996 ■ TOTAL NITROGEN 0 TOTAL PHOSPH m CRAMERTON AUTOMOTIVE PLANT INFLUENT NITROGEN/PHOSP 30 28 26 24 22 20 - - 18 216 a14 12 10 8 6 4 2 t lh b 0 6/5 6/12 6/19 6/26 7/10 7/17 7125 819 8/16 8/23 8/30 9/13 9/20 9/27 10/3 1011010/1710/24 1996 ■ TOTAL NITROGEN ■ TOTAL PHOSPH 30 28 26 24 CRAMERTON AUTOMOTIVE PLANT INFLUENT NITROGEN/PHOSP - - - _- - - -- 22 - 20 18 2 16 a14 12 10 8 6 4 2 0 10/31 11 /7 11/14 11/21 11/29 12/05 12/12 12/19 1996 ■ TOTAL NITROGEN 0 TOTAL PHOSPH 30 28 26 24 22 20 18 2 16 d14 12 10 8 6 4 2 0 LAKEWOOD PLANT INFLUENT NITROGEN/PHOSP 01/17 01/24 01/31 02/07 02/14 02/21 03/06 03/13 03/20 03/27 04/03 04/10 04/17 05/01 05/08 05/15 05/29 1996 ■ TOTAL NITROGEN ■ TOTAL PHOSPH 30 28 26 24 22 20 18 216 8-14 12 10 8 6 4 2 0 LAKEWOOD PLANT INFLUENT NITROGEN/PHOSP 6/5 6/12 6/19 6/26 7/10 7/17 7/25 8/9 8/16 8/23 8/30 9/13 9/20 9/27 10/3 10/10 10/17 10/24 1996 0 TOTAL NITROGEN 0 TOTAL PHOSPH 30 28 26 24 22 20 18 2i 16 CL14 12 10 8 6 4 2 0 LAKEWOOD PLANT INFLUENT NITROGEN/PHOSP 10/31 11 /7 11 /14 11 /21 11 /29 12/05 12/12 12/19 1996 0 TOTAL NITROGEN M TOTAL PHOSPH 40 38 36 34 32 30 28 26 24 22 a. 20 18 16 14 12 10 6 4 0 TOWN INFLUENT NITROGEN/PHOSP Ell IEEEIIIEEllEM El MMlMMlMlll ■--■ -■--■!■- -■--■■- IIMEME■EME■MEN IMEME■■■IIIIIIEN■ MIMME IN IN El 0 ■ ■ ■ ■ ■ - ■ ■ ■ME ■ ■ i■■■■■■M■■■i■MM■■■ �7■■m7■ ■7■ ■ ■777 ■77■■7■■■■■7■■■■ ■ TOTAL NITROGEN 0 TOTAL PHOSPH 80 75 70 65 60 55 50 45 o- 40 C' 35 30 25 20 15 10 5 0 TOWN INFLUENT NITROGEN/PHOSP 6/5 6/12 6/19 6/26 7/10 7/17 7/25 8/9 8/16 8/23 8/30 9/13 9/20 9/27 10/3 10/10 10/17 10/24 1996 ■ TOTAL NITROGEN ■ TOTAL PHOSPH 80 75 70 65 60 55 50 45 o-40 35 30 25 20 15 10 5 0 TOWN INFLUENT NITROGEN/PHOSP 10/31 11 /07 11 /14 11 /21 11 /29 12/05 12/12 12/19 1996 0 TOTAL NITROGEN 0 TOTAL PHOSPH FIGURE 4.1 TASK/TIME SCHEDULE 1996 1997 1998 TASK 1 2 3 4 1 2 3 4 1 2 3 4 Project Initiation Modifications to Sampling Plan Simulation Models ■ Technical Memorandum _ Design of Treatment Upgrade Implementation of Design Update Sampling Plan Fine Tune Operating Strategy - Evaluate Compliance Renort to DEM L:\IWUPS\2030\T-4- I .XIS C.I.P. Nutient Study for Parsons Engineering Science,Inc. Date 1/20/97 1/21/ 97 1/22/97 1/23/97 1/24/97 1/27/97 1/28/ 97 1/29/97 1/30/97 1/31/97 1/23/97 Influent a. E G ~ a Cam.) 0 20 7.8 250 18 10.7 350 28° ' 9.7 325 20° 9.4 350 26° 10.3 410 0 27 9.4 380 22 ° 9.5 280 32 ° 9.5 280 32 9.7 380 29 9.6 325 Digester -Grab 11 7.1 >1500 53 53 29 26 24 25 24 24 25 23 11,873 c N F-- ra I.1 4 4 4 4 4 4 4 4 4 Effluent RN N �L 7.3 7.4 7.4 7.4 7.3 7.4 7.4 7.4 7.4 7.6 19 14 23 17 9 15 22 12 9 17 O O V 1 70 72 75 62 60 62 68 60 62 66