Loading...
HomeMy WebLinkAbout20160372 Ver 2_StonyFork_97085_MY5_2023_20240226 Monitoring Report MY05   Stony Fork Restoration Site Upper Neuse River Basin - 03020201 Monitoring Year 05 DMS Contract 6830 DMS Project Number 97085 DWR #: 2016-0372 USACE Action ID: 2016-00875 Johnston County, North Carolina Prepared for: NCDMS, 1652 Mail Service Center, Raleigh, NC 27699-1652 Monitoring Data Collected: 2023 Date Submitted: January 2024 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 2023-MY05 Monitoring and Design Firm Prepared by:                   KCI Associates of North Carolina 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 (919) 783-9214 Project Contact: Adam Spiller Email: adam.spiller@kci.com   KCI ASSOCIATES OF N ORTH C AROLINA, P.A. www.kci.com Employee-Owned Since 1988 MEMORANDUM Date: February 26, 2024 To: Danielle Mir, DMS Project Manager From: Adam Spiller, Project Manager KCI Associates of North Carolina, PA Subject: MY-05 Monitoring Report Comments Stony Fork DMS #6830, Contract 006830 Neuse River Basin CU 030202018 Johnston County, North Carolina Please find below our responses in italics to the MY-05 Monitoring Report comments from NCDMS received on February 14, 2024 for the Stony Fork Restoration Site. 1. Table 1 - Please display credits to 3-decimal places. KCI Response: This error has been corrected. 2. CCPV – DMS recommends showing the non-credited streams inside the easement with a symbology of a grey /black line labeled “non-credited stream.” Below is a rough sketch of the estimated locations of these streams. KCI Response: At the start of the project, the features in question were determined to not constitute streams. These ephemeral drains were stabilized as part of the project and have been added to the CCPV and labeled “Stabilized Drainages.” 3. A thick patch of pines is starting to grow downstream of the external crossing (Sherill Farm Dr) on SF2. Please keep an eye on it and thin it if necessary. KCI Response: KCI will monitor the pine and other nuisance vegetation on site and treat as necessary. 4. Mature privet was found sparsely throughout the project. Please continue treatment. KCI Response: KCI will continue to monitor and treat invasives as necessary. Sincerely, Adam Spiller Project Manager E NGINEERS  S CIENTISTS  S URVEYORS  C ONSTRUCTION M ANAGERS 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 (919) 783-9214 (919) 783-9266 Fax Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 2023-MY05 TABLE OF CONTENTS Project Summary ........................................................................................................................................... 1 Monitoring Results ........................................................................................................................................ 2 Figure 1. Project Site Vicinity Map .............................................................................................................. 4 References ..................................................................................................................................................... 5   Appendix A – Background Tables Table 1. Project Components and Mitigation Credits ................................................................................... 7 Table 2. Project Activity and Reporting History .......................................................................................... 8 Table 3. Project Contacts .............................................................................................................................. 9 Table 4. Project Information ....................................................................................................................... 10 Appendix B – Visual Assessment Data CCPV .......................................................................................................................................................... 13 Table 5. Visual Stream Morphology Assessment ....................................................................................... 18 Table 6. Vegetation Condition Assessment ................................................................................................ 24 Photo Reference Points ............................................................................................................................... 25 Permanent Vegetation Monitoring Plot Photos .......................................................................................... 29 Random Vegetation Monitoring Plot Photos .............................................................................................. 32 Easement Encroachment Area Photos ........................................................................................................ 33 Appendix C – Vegetation Plot Data Table 7. Stem Count Total and Planted by Plot and Species ...................................................................... 35 Appendix D – Stream Measurement and Geomorphology Data Table 8. Cross-section Morphology Data Table ......................................................................................... 39 Cross-section Monitoring Plots ................................................................................................................... 42 Appendix E – Hydrologic Data Table 9. Verification of Bankfull Events .................................................................................................... 59 Bankfull Verification and Precipitation Plot ............................................................................................... 60 Table 10. Verification of Stream Flow ....................................................................................................... 61 Table 11. Stream Flow Criteria Attainment ................................................................................................ 61 Stream Flow Verification and Precipitation Plots ....................................................................................... 62 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 1 2023-MY05 PROJECT SUMMARY The Stony Fork Restoration Site (SFRS) was completed in May 2019 and restored a total of 6,810 linear feet of stream and 949,747 square feet of riparian buffer under the Neuse Buffer Rule (NCAC Rule 15A 02B.029). The SFRS is a riparian system in the Upper Neuse River Basin (03020201 8-digit cataloging unit) in Johnston County, North Carolina. The site’s natural hydrologic regime had been substantially modified through the relocation and straightening of the existing stream channels, impacted by land clearing, and cleared of any riparian buffer. This completed project will restore impacted agricultural and timber lands to a stable stream ecosystem with a functional riparian buffer and floodplain access. The SFRS is protected by a 24.4 acre permanent conservation easement, held by the State of North Carolina. The site is located approximately 5.5 miles north of Benson, NC. Specifically, the site is 0.2 mile west on Elevation Road from its intersection with Federal Road (SR-1331). The North Carolina Ecosystem Enhancement Program (NCEEP) published the Neuse River Basin Priorities in 2010. These were updated in for the Neuse 01 cataloging unit (CU) in 2015 due to extensive mitigation needs and changes in watershed conditions since 2010. The project 14 digit CU (03020201150010) was identified as a Targeted Local Watershed (TLW) in the updated priorities. The goals and priorities for the SFRS are based on the information presented in the Neuse River Basin Restoration Priorities: maintaining and enhancing water quality, restoring hydrology, and improving fish and wildlife habitat (NCEEP, 2009). The project will support the following basin priorities: ‐ Managing stormwater runoff ‐ Improving/restoring riparian buffers ‐ Reducing sediment loading ‐ Improving stream stability The goals for the project are to: ‐ Restore channelized and agriculture impacted streams to stable C/Cb channels. ‐ Restore a forested riparian buffer to provide bank stability, filtration, and shading. The project goals will be addressed through the following objectives: ‐ Relocate a channelized stream to its historic landscape position. ‐ Install cross-sections sized to the bankfull discharge. ‐ Create bedform diversity with pools, riffles, and habitat structures ‐ Plant the site with native trees and shrubs and an herbaceous seed mix. Project planting and construction were completed in May 2019. The SFRS involved restoration and establishment of a functioning stream ecosystem with 6,810 linear feet of stream restored by re- meandering the stream and by tying the bankfull elevation to the historic floodplain where feasible. The entire site was planted to establish a forested riparian buffer. The site was constructed as designed with no major modifications from the design plan. The monitoring components were installed in May 2019. Four automatic recording pressure transducer stream gauges that take a reading every 10 minutes were installed in the upper third of T1, T1-A, T2 and T3 to document flow within those reaches. Cameras were installed in the vicinity of each of these gauges and set to record a short video once a day to provide additional verification of flow. An additional automatic recording pressure transducer stream gauge was installed near the bottom of the main stem (SF3) to record the occurrence of bankfull events. To determine the success of the planted mitigation areas, seven 10 m x 10 m permanent vegetation monitoring plots were established. An additional five 10 m x 10 m random vegetation monitoring plots were sampled as well. The locations of the planted stems relative to the origin were recorded within the permanent plots and the species and height of each planted stem were recorded for all plots. Any volunteers found within the plots were also grouped into size categories by species but separate from the planted stems. Twelve permanent photo reference points were established and will be taken annually. Sixteen permanent cross-sections Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 2 2023-MY05 (eight riffle cross-sections and eight pool cross-sections) were also established and a detailed longitudinal profile of the stream was taken. Wolman pebble counts were performed at all of the riffle cross-sections in MY00-03 and were discontinued starting in MY05. The cross-section measurements will be repeated in future monitoring years, but the longitudinal profile will only be repeated if there are concerns about bed elevation adjustments. Reports will be submitted to DMS each year. Vegetative success criteria for the stream mitigation is 260 woody stems/acre after five years, and 210 woody stems/acre after seven years. Trees in each plot must average seven feet in height at Year 5 and ten feet in height at Year 7. Volunteer species must be present for a minimum of two growing seasons and must be a species from the approved planting list to count toward vegetative success. A single species may not account for more than 50% of the required number of stems within any plot. A minimum of four bankfull events must also be recorded during the monitoring period. All project streams must show a minimum of 30 continuous days of flow within a calendar year for three out of the first four years of monitoring. Bank height ratios (BHR) should not exceed 1.2 and the entrenchment ratios (ER) should be 2.2 or greater. BHR and ER at any measured riffle cross-section should not change more than 10% from the baseline condition during any given monitoring interval (e.g. no more than 10% between years 1 and 2, 2 and 3, 3 and 5, or 5 and 7). Visual assessments will also be used to identify problem areas. Vegetative success criteria for the areas proposed for riparian buffer credit is 260 woody stems/acre at the end of five years of monitoring. Trees in each plot must average seven feet in height at Year 5. There should be a minimum of four native hardwood tree species, with no species accounting for greater than 50% of the stems. Volunteer species must be from the approved planting list to count toward vegetative success. MONITORING RESULTS The fifth-year vegetation monitoring was conducted between August 16 and 17, 2023. The site averaged 482 planted stems/acre across all 12 plots. All twelve of the plots had greater than 260 planted stems/acre. Including volunteers, the site averaged 1,143 total stems/acre. All the plots met the success criteria. In general, the site is well vegetated, with widespread herbaceous coverage and many healthy planted stems. Ongoing treatment of Chinese privet and kudzu continued in MY05. These treatments have been repeated several times during the growing season in each year since the site was constructed and will be continued throughout the monitoring period. The stream gauge near the bottom of SF3 recorded three bankfull events in 2023. All four stream flow gauges recorded at least 30 consecutive days of flow. The gauge on T1 recorded flow for a maximum of 140 days. The gauge on T1A recorded flow for a maximum of 174 days and the gauges on T2 and T3 recorded flow for a maximum of 85 days and 157 consecutive days, respectively. The data from the flow gauges was further backed up by the cameras on site. The cameras on T1 and T1A showed flow for a maximum of 40 and 167 days, respectively. The cameras on T2 and T3 showed flow for a maximum of 74 days and 104 days respectively. Differences in the number of days recorded by the cameras and the gauges are largely due to periods of time when the cameras become obscured by vegetation during the growing season or low flow that was not picked up by the gauges. The fifth-year cross-section survey was completed between July 19 and 24, 2023 and found that for the majority of the site, the dimensions of the stream are as designed, with some small variation as is typical for stream restoration projects. Both of the cross-sections on T3 (XS9 and 10) show significant levels of aggradation. Since only the bottom 129 feet of this stream are located within the bounds of the project, there is a large sediment source in the form of heavily eroding banks and headcuts just upstream from the project reach. This issue is further compounded by the small size of this reach compared to SF1, which it flows into. When SF1 experiences an overbank event, sediment that is deposited on the floodplain is also deposited in T3. This combined with the upstream sediment source has led to large amounts of sediment Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 3 2023-MY05 being processed through this small reach and has caused the channel alignment to shift slightly. Despite this shift, the stream is still functioning as a stream with a defined bed and bank and has been processing the accumulated sediment. Please see Appendix B – Visual Assessment Data for photos of this reach and Appendix E – Hydrologic Data for a detailed record of the flow in this reach in 2023. At a site visit on November 18, 2021, it was noted that an outlet from a sediment retention pond had been dug through the site easement and to the project stream. This encroachment occurred on the right bank, approximately 150 feet upstream of the crossing on Reach SF2. Upon noticing this encroachment, KCI immediately notified the developer responsible as well as the responsible agencies. The outlet and sediment pond were filled in and on May 5, 2022 the area inside the easement that had been impacted was planted with 29 one-gallon containerized trees. Please see Appendix C – Vegetation Data for a list of the species and quantity planted in this area. In addition to the above violation, several property owners in the Sherrill Farms Phase 1 subdivision have stored vehicles and a trampoline within the easement. Sherrill Farms LLC was contacted about these encroachments in 2018, 2019, and 2021. In early 2022, a fence was installed along the easement boundary where these encroachments were occurring. KCI has been monitoring the encroachment area since it was first noted in MY03. This area was replanted in 2022 with gallon size containerized trees and has been revegetating well since then. No further signs of encroachment have been noted in this area. This area, as well as the rest of the boundary will continue to be monitored for any signs of encroachment. The site boundaries were inspected on December 7, 2023. During this inspection, several signs that had come off their posts were noted. Two areas of scalloping were also noted. The first of these is located just downstream of the confluence of T1 and the main stem and was 0.006 acres in size. The second is located at the very end of the project and was 0.059 acres in size. KCI is in contact with the landowners about these encroachments and will be installing additional easement markings in these areas, as well as repairing the other damaged signs.  o o o ooo o o oo o o o o oooo o o o o o o o o ooo o o o oo o o o o o ooo o o o oooo o o o oo o ooo o ooo o o o o o o o o o o oooo o o oo o oo o o o o o o o o oo o o o o o o o o oooooooo ooo oooooo oooooo oooooooooooooooooooooooooooooooooooooo oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo o oo o o o oo o o o oo o o o o o ooo o oo o oo o o oo o o o o o o oo o o ooo o oooo o o o o oo ooo o o o o o o o o o o ooo o o oo o o o o o o o o o o oo o o o o o o oo o o o o oo o o o o oo o o o o o o o o o o o o o ÊÚ §¨¦40 §¨¦95 50 27 242 242 £¤301 BENSON B l a c k Creek ÊÚ WAKE JOHNSTON WAYNE NASH SAMPSON HARNETT WILSON ÊÚ Project Site Location County Boundary Major Roads Minor Roads o Airports (none within a 5-mi radius) Major Rivers and Streams Cities and Towns Eleva t i o n R d F e d e r a l R d Ü 0 10.5 Miles FIGURE 1. VICINITY MAP, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 5 2023-MY05 REFERENCES NCDEQ, Division of Mitigation Services. March 2015. 2015 Neuse 03020201 Priorities. Last accessed at: http://portal.ncdenr.org/c/document_library/get_file?uuid=340a3f58‐336b‐42bf‐bab2‐fb6 63cbfd78d&groupId=60329 NCDENR, Ecosystem Enhancement Program. 2014. NCDENR, Ecosystem Enhancement Program. 2014. Stream and Wetland Mitigation Monitoring Guidelines. Last accessed1/2016 at: http://portal.ncdenr.org/c/document_library/get_file?p_l_id=60409&folderId=18877169 &name=DLFE-86604.pdf NCDENR, Ecosystem Enhancement Program. 2014. Stream and Wetland Mitigation Monitoring Guidelines. Last accessed 6/2015 at: http://portal.ncdenr.org/c/document_library/get_file?p_l_id=60409&folderId=18877169 &name=DLFE-86606.pdf NC Wetland Functional Assessment Team. 2010. NC Wetland Assessment Method (NC WAM) User Manual, version 4.1. Last accessed 11/2012 at: http://portal.ncdenr.org/c/document_library/get_file?uuid=76f3c58b-dab8-4960-ba43- 45b7faf06f4c&groupId=38364 Schafale, M.P. and A.S. Weakley. 2012. Guide to the Natural Communities of North Carolina: Fourth Approximation. Natural Heritage Program, Division of Parks and Recreation, N.C. Department of Environment and Natural Resources. Raleigh, NC. Soil Survey Staff, Natural Resources Conservation Service, United States Department of Agriculture. Soil Survey of Johnston County, North Carolina. 1994 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 6 2023-MY05     APPENDIX A Background Tables Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 7 2023-MY05 *Mitigation Plan footage used for credit calculations. **Crossings have been removed from creditable linear footage for all project streams   Table 1. Project Components and Mitigation Credits Stony Fork Restoration Site, DMS Project #97085 Mitigation Credits Stream Riparian Wetland Non-riparian Wetland Buffer Nitrogen Nutrient Offset Phosphorous Nutrient Offset Type R RE R RE R RE R RE Linear Feet/Acres 6,405 405 450,285 sf 499,462 sf Credits 6,405 181 425,434 59,904 TOTAL CREDITS 6,585.933 480,337.942 Project Components Project Component -or- Reach ID Stationing/ Location Existing Footage/ Square Footage Approach (PI, PII etc.) Restoration -or- Restoration Equivalent MP Restoration Footage* As-built Restoration Footage Mitigation Ratio SF1 10+00 – 21+55 1,235 PI/PII R 1,155 1,155 1:1 SF2 21+55 – 49+54 2,453 PI R 2,707** 2,714** 1:1 SF3 49+54 – 56+08 618 PI R 624** 624** 1:1 T1 100+00 – 105+10 365 PI/PII R 510 510 1:1 T1A 150+00 – 151+59 47 PI/PII R 159 159 1:1 T2-1 200+00 – 203+34 327 N/A EII 334 334 2.5:1 T2-2 203+34 – 206+71 326 PI/PII R 337 337 1:1 T2-3 206+71 – 215+26 780 PI/PII R 855 855 1:1 T3-1 300+00 – 300+71 72 PI/PII EI 71 71 1.5:1 T3-2 300+71 – 301+29 82 PI/PII R 58 58 1:1 Buffer Restoration TOB to 100’ N/A 413,194 N/A R 413,194 413,194 100% Buffer Restoration 101-200’ N/A 37,091 N/A R 37,091 37,091 33% Buffer Enhancement TOB to 100’ N/A 74,802 N/A E 74,802 74,802 50% Buffer Preservation TOB to 100’ N/A 424,660 N/A P 424,660 424,660 10% Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 8 2023-MY05 Activity or Report Data Collection Complete Actual Completion or Delivery Mitigation Plan September 5, 2018 Final Design - Construction Plans Oct. 15, 2018 Construction Grading Completed May 3, 2019 Planting Completed May 6 2019 Baseline Monitoring/Report May 2019 July 2018 Vegetation Monitoring May 9, 2019 Stream Survey May 15, 2019 Invasive Treatment Summer 2019 Year 1 Monitoring November 2019 January 2020 Vegetation Monitoring November 5, 2019 Stream Survey November 11, 2019 Invasive Treatment Summer 2020 Year 2 Monitoring November 2020 January 2021 Vegetation Monitoring September 4, 2020 Stream Survey June 29, 2020 Invasive Treatment Summer 2021 Year 3 Monitoring November 2021 December 2021 Vegetation Monitoring August 30, 2021 Stream Survey August 30, 2021 Year 4 Monitoring December 2022 January 2023 Year 5 Monitoring December 2023 January 2024 Vegetation Monitoring August 17, 2023 Stream Survey July 24, 2021 Table 2. Project Activity & Reporting History Stony Fork Restoration Sites, DMS Project #97085   Component Summation Restoration Level Stream (linear feet) Riparian Wetlands (Acres) Non-Riparian Wetlands (Acres) Buffer (square feet) Riverine Non-Riverine Restoration 6,405 450,285 Enhancement 74,802 Enhancement I 71 Enhancement II 334 Creation Preservation 424,660 (175,029 allowable for credit) High Quality Preservation TOTAL CREDITS 6,585.933 480,337.942 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 9 2023-MY05   Table 3. Project Contacts Stony Fork Restoration Site, DMS Project #97085 Design Firm KCI Associates of North Carolina 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 Contact: Mr. Adam Spiller Phone: (919) 278-2514 Fax: (919) 783-9266 Construction Contractor Fluvial Solutions, Inc. Stony Fork and T3 PO Box 28749 Raleigh, NC 27611 Contact: Mr. Peter Jelenevsky Phone: (919) 605-6134 Construction Contractor KCI Environmental Technologies and Construction T1, T1A, and T2 4505 Falls of Neuse Road, Suite 400 Raleigh, NC 27609 Contact: Mr. Kevin O’Briant Phone: (919) 278-2516 Planting Contractor Bruton Natural Systems, Inc. PO Box 1197 Fremont, NC 27830 Contact: Mr. Charlie Bruton Phone: (919)783-9214 Monitoring Performers KCI Associates of North Carolina 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 Contact: Mr. Adam Spiller Phone: (919) 278-2514 Fax: (919) 783-9266 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 10 2023-MY05 Table 4. Project Information Stony Fork Restoration Site, DMS Project #97085 Project Name Stony Fork Restoration Site County Johnston County Project Area (acres) 24.4 acres Project Coordinates (lat. and long.) 35°26'55.0"N, 78°31'18.5"W Project Watershed Summary Information Physiographic Province Coastal Plain River Basin Neuse USGS Hydrologic Unit 8-digit 03020201 USGS Hydrologic Unit 14-digit 03020201150010 DWQ Sub-basin 03-04-04 Project Drainage Area (acres) 497 acres Project Drainage Area Percentage of Impervious Area 5% CGIA Land Use Classification Managed Herbaceous Cover 53% (262 ac), Mixed Hardwoods/Conifers 31% (150 ac), Low Density Developed 9% (42 ac), Medium Density Residential 5% (24 ac), Transportation/Impervious 3% (13 ac) Existing Reach Summary Information Parameters Stony Fork T1 and T1A T2 T3 Length of reach (linear feet) 3,141 412 1,433 154 Drainage area (acres) 497 12 150 29 Perennial, Intermittent, Ephemeral Perennial Intermittent Perennial Intermittent NCDWQ Water Quality Classification C; NSW C; NSW C; NSW C; NSW Stream Classification (exisiting) G4c G4 G4 G4 Stream Classifcation (proposed) C4 C4 C4 C4 Evolutionary trend (Simon) Channelized, Stage III Channelized, Stage III Channelized, Stage III Modified with pond, Stage III FEMA classification None None None None Existing Wetland Summary Information Parameters Size of Wetland (acres) 0.33 (WA and WE) 0.06 (WB) 0.14 (WC and WF) Wetland Type Headwater Forest Bottomland Hardwood Forest Non-Tidal Freshwater Marsh Mapped Soil Series Gilead sandy loam Bibb sandy loam Bibb sandy loam Drainage class Moderately Well Drained Poorly Drained Poorly Drained Soil Hydric Status Non-hydric Hydric Hydric Source of Hydrology Surface Water Stream Floodplain Stream Floodplain Restoration or Enhancement Method N/A N/A N/A Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 11 2023-MY05 Regulatory Considerations Regulation Applicable? Resolved? Supporting Documentation Waters of the United States – Section 404 Yes Yes 404 permit Waters of the United States – Section 401 Yes Yes 401 permit Endangered Species Act No N/A N/A Historic Preservation Act No N/A N/A Coastal Zone Management Act (CZMA)/ Coastal Area Management Act (CAMA) No N/A N/A FEMA Floodplain Compliance No Yes Essential Fisheries Habitat No N/A N/A   Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 12 2023-MY05     APPENDIX B Visual Assessment Data   ^_ ^_ ^_ ^_ ^_ ^_ Start SF1 T2-1 SF2 T2-2 T1 T1A T3-1 T3-2 T2-3 SF3 Sheet 1 Sheet 4 Sheet 3 Sheet 2 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Source: Google Earth, 2018 CURRENT CONDITIONS PLANVIEW STONY FORK RESTORATION SITEJOHNSTON COUNTY, NC ±0 300150 Feet Project Easement Stream Mitigation R (6,405 lf / 6,405 SMCs) EI (71 lf / 47 SMCs) EII (334 lf / 134 SMCs) Buffer Mitigation R 0-100'(413,194 sf / 413,194 credits) R 101-200'(37,091 sf / 12,240 credits) E (74,802 sf / 37,401 credits) P (424,660 sf / 17,503 credits) Stabilized Drainages Easement Encroachment Cross-Sections ^_Photo Points Flow Gauge Camera Bankfull Gauge Vegetation Monitoring Plots Success Criteria Met Success Criteria Not Met Overview ^_ ^_ Start SF1 SF2 T1 T1A T3-1 T3-2 27+0 0 2 6 + 0 0 25 + 0 0 24+00 2 3 + 0 0 22 + 0 0 21+ 0 0 2 0 + 0 0 19+00 1 8 + 0 0 1 7 + 0 0 16+00 1 5 + 0 0 14+ 0 0 13+ 0 0 12 + 0 0 11 + 0 0 10 + 0 0 301+00 300+00 151 + 0 0 1 5 0 + 0 0 10 4 + 0 0 103 + 0 0 102+00 101+00 100+ 0 0 29 + 0 0 28+ 0 0 2 1 1 2 3 4 9 12 11 10 4 1 R1 R5 R2 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Source: Google Earth, 2018 CURRENT CONDITIONS PLANVIEW STONY FORK RESTORATION SITEJOHNSTON COUNTY, NC ±0 10050 Feet Project Easement Stream Mitigation R (6,405 lf / 6,405 SMCs) EI (71 lf / 47 SMCs) EII (334 lf / 134 SMCs) Buffer Mitigation R 0-100'(413,194 sf / 413,194 credits) R 101-200'(37,091 sf / 12,240 credits) E (74,802 sf / 37,401 credits) P (424,660 sf / 17,503 credits) Stabilized Drainages Easement Encroachment Cross-Sections ^_Photo Points Flow Gauge Camera Bankfull Gauge Vegetation Monitoring Plots Success Criteria Met Success Criteria Not Met SHEET 1 of 4 ^_ 27+0 0 4 2 + 0 0 4 1 + 0 0 40+00 3 9 + 0 0 3 8 + 0 0 37+00 36+0 0 35 + 0 0 34+00 33 + 0 0 32 + 0 0 31 + 0 0 3 0 + 0 0 29 + 0 0 28+ 0 0 44 + 0 0 43+00 3 5 6 3 4 2 3 R3 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Source: Google Earth, 2018 CURRENT CONDITIONS PLANVIEW STONY FORK RESTORATION SITEJOHNSTON COUNTY, NC ±0 10050 Feet Project Easement Stream Mitigation R (6,405 lf / 6,405 SMCs) EI (71 lf / 47 SMCs) EII (334 lf / 134 SMCs) Buffer Mitigation R 0-100'(413,194 sf / 413,194 credits) R 101-200'(37,091 sf / 12,240 credits) E (74,802 sf / 37,401 credits) P (424,660 sf / 17,503 credits) Stabilized Drainages Easement Encroachment Cross-Sections ^_Photo Points Flow Gauge Camera Bankfull Gauge Vegetation Monitoring Plots Success Criteria Met Success Criteria Not Met SHEET 2 of 4 ^_ ^_ T2-3 SF3 4 2 + 0 0 4 1 + 0 0 5 6 + 0 0 55 + 0 0 54+00 53 + 0 0 52+00 51+ 0 0 50+ 0 0 48+00 47 + 0 0 46 + 0 0 45+00 44 + 0 0 43+00 21 4 + 0 0 213+00 212+00211+ 0 0 210 + 0 0 20 9 + 0 0 4 9 + 0 0 21 5 + 0 0 20 8 + 0 0 20 7 + 0 0 206+00 6 5 7 5 6 8 16 15 7 6 3 R4 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Source: Google Earth, 2018 CURRENT CONDITIONS PLANVIEW STONY FORK RESTORATION SITEJOHNSTON COUNTY, NC ±0 10050 Feet Project Easement Stream Mitigation R (6,405 lf / 6,405 SMCs) EI (71 lf / 47 SMCs) EII (334 lf / 134 SMCs) Buffer Mitigation R 0-100'(413,194 sf / 413,194 credits) R 101-200'(37,091 sf / 12,240 credits) E (74,802 sf / 37,401 credits) P (424,660 sf / 17,503 credits) Stabilized Drainages Easement Encroachment Cross-Sections ^_Photo Points Flow Gauge Camera Bankfull Gauge Vegetation Monitoring Plots Success Criteria Met Success Criteria Not Met SHEET 3 of 4 ^_ ^_ T2-1 T2-2 T2-3 SF3 51+ 0 0 50+ 0 0 48+00 21 4 + 0 0 213+00 212+00211+ 0 0 210 + 0 0 20 9 + 0 0 4 9 + 0 0 21 5 + 0 0 20 8 + 0 0 20 7 + 0 0 206+00 205+00 204+00 203 + 0 0 202+00 201+0 0 20 0 + 0 0 4 5 7 16 15 1413 5 6 7 R4 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Source: Google Earth, 2018 CURRENT CONDITIONS PLANVIEW STONY FORK RESTORATION SITEJOHNSTON COUNTY, NC ±0 10050 Feet Project Easement Stream Mitigation R (6,405 lf / 6,405 SMCs) EI (71 lf / 47 SMCs) EII (334 lf / 134 SMCs) Buffer Mitigation R 0-100'(413,194 sf / 413,194 credits) R 101-200'(37,091 sf / 12,240 credits) E (74,802 sf / 37,401 credits) P (424,660 sf / 17,503 credits) Stabilized Drainages Easement Encroachment Cross-Sections ^_Photo Points Flow Gauge Camera Bankfull Gauge Vegetation Monitoring Plots Success Criteria Met Success Criteria Not Met SHEET 4 of 4 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 18 2023-MY05 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site, DMS Project#97085 Reach ID SF1 Assessed Length 1,155 1. Bed 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 18 18 100% 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)17 17 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)17 17 100% 1. Thalweg centering at upstream of meander bend (Run) 17 17 100% 2. Thalweg centering at downstream of meander (Glide) 17 17 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 5 5 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 5 5 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 5 5 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 5 5 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.5 5 100% Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments 1. Vertical Stability (Riffle and Run units) Totals 3. Meander Pool Condition 4.Thalweg Position Amount of Unstable Footage % Stable, Performing as Intended Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 19 2023-MY05 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site, DMS Project#97085 Reach ID SF2 Assessed Length 2,802 1. Bed 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 36 36 100% 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)35 35 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)35 35 100% 1. Thalweg centering at upstream of meander bend (Run)35 35 100% 2. Thalweg centering at downstream of meander (Glide)35 35 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 8 8 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 8 8 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 8 8 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 8 8 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.8 8 100% Amount of Unstable Footage % Stable, Performing as Intended 1. Vertical Stability (Riffle and Run units) Totals 3. Meander Pool Condition 4.Thalweg Position Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 20 2023-MY05 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site, DMS Project#97085 Reach ID SF3 Assessed Length 618 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 9 9 100% 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)8 8 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)8 8 100% 1. Thalweg centering at upstream of meander bend (Run)8 8 100% 2. Thalweg centering at downstream of meander (Glide)8 8 100% 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 1 1 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 1 1 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 1 1 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 1 1 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.1 1 100% 2. Bank 3. Engineered Structures Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments 1. Vertical Stability (Riffle and Run units) Totals 3. Meander Pool Condition 4.Thalweg Position 1. Bed Amount of Unstable Footage % Stable, Performing as Intended Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 21 2023-MY05 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site, DMS Project#97085 Reach ID T1 Assessed Length 365 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 13 13 100% 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)12 12 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)12 12 100% 1. Thalweg centering at upstream of meander bend (Run)12 12 100% 2. Thalweg centering at downstream of meander (Glide)12 12 100% 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 4 4 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 4 4 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 4 4 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 4 4 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.4 4 100% Amount of Unstable Footage % Stable, Performing as Intended 1. Bed 2. Bank 1. Vertical Stability (Riffle and Run units) Totals 3. Meander Pool Condition 4.Thalweg Position 3. Engineered Structures Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 22 2023-MY05 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site, DMS Project#97085 Reach ID T2 Assessed Length 1,433 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 27 27 100% 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)26 26 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)26 26 100% 1. Thalweg centering at upstream of meander bend (Run)26 26 100% 2. Thalweg centering at downstream of meander (Glide)26 26 100% 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 7 7 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 7 7 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 7 7 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 7 7 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.7 7 100% 2. Bank 3. Engineered Structures Amount of Unstable Footage % Stable, Performing as Intended 1. Vertical Stability (Riffle and Run units) Totals 3. Meander Pool Condition 4.Thalweg Position 1. Bed Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 23 2023-MY05 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site, DMS Project#97085 Reach ID T3 Assessed Length 154 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)1 93 40% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 3 3 100% 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)0 2 0% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)2 2 100% 1. Thalweg centering at upstream of meander bend (Run)2 2 100% 2. Thalweg centering at downstream of meander (Glide)2 2 100% 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. N/A N/A N/A 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. N/A N/A N/A 2a. Piping Structures lacking any substantial flow underneath sills or arms. N/A N/A N/A 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) N/A N/A N/A 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.N/A N/A N/A Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments 1. Vertical Stability (Riffle and Run units) Totals 3. Meander Pool Condition 4.Thalweg Position 1. Bed 2. Bank 3. Engineered Structures Amount of Unstable Footage % Stable, Performing as Intended Major Channel Category Channel Sub-Category Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 24 2023-MY05 Table 6 Vegetation Condition Assessment Stony Fork Stream Restoration Site, DMS Project# 97085 Planted Acreage 24.4 Vegetation Category Definitions Mapping Threshold CCPV Depiction Number of Polygons Combined Acreage % of Planted Acreage 1. Bare Areas Very limited cover of both woody and herbaceous material.0.1 acres Pattern and Color 0 0.00 0.0% 2. Low Stem Density Areas Woody stem densities clearly below target levels based on MY3, 4, or 5 stem count criteria.0.1 acres Pattern and Color 0 0.00 0.0% 0 0.00 0.0% 3. Areas of Poor Growth Rates or Vigor Areas with woody stems of a size class that are obviously small given the monitoring year.0.25 acres Pattern and Color 0 0.00 0.0% 0 0.00 0.0% Easement Acreage 9.5 Vegetation Category Definitions Mapping Threshold CCPV Depiction Number of Polygons Combined Acreage % of Easement Acreage 4. Invasive Areas of Concern Areas or points (if too small to render as polygons at map scale).1000 SF Pattern and Color 0 0.00 0.0% 5. Easement Encroachment Areas Areas or points (if too small to render as polygons at map scale).none Pattern and Color 2 0.07 0.7% Total Cumulative Total Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 25 2023-MY05   Photo Reference Photos PP1U – MY-00 – 5/15/19 PP1U – MY-05 – 12/7/23 PP1D – MY-00 – 5/15/19 PP1D – MY-05 – 12/7/23 PP2U – MY-00 – 5/15/19 PP2U – MY-05 – 12/7/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 26 2023-MY05   PP2D – MY-00 – 5/15/19 PP2D – MY-05 – 12/7/23 PP3U – MY-00 – 5/15/19 PP3U – MY-05 – 12/7/23 PP3D – MY-00 – 5/15/19 PP3D – MY-05 – 12/7/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 27 2023-MY05   PP4U – MY-00 – 5/15/19 PP4U – MY-05 – 12/7/23 PP4D – MY-00 – 5/15/19 PP4D – MY-05 – 12/7/23 PP5U – MY-00 – 5/15/19 PP5U – MY-05 – 12/7/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 28 2023-MY05   PP5D – MY-00 – 5/15/19 PP5D – MY-05 – 12/7/23 PP6U – MY-00 – 5/15/19 PP6U – MY-05 – 12/7/23 PP6D – MY-00 – 5/15/19 PP6D – MY-05 – 12/7/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 29 2023-MY05   Permanent Vegetation Monitoring Plot Photos Vegetation Plot 1 – MY-00 – 5/15/19 Vegetation Plot 1 – MY-05 – 8/16/23 Vegetation Plot 2 – MY-00 – 5/15/19 Vegetation Plot 2 – MY-05 – 8/16/23 Vegetation Plot 3 – MY-00 – 5/15/19 Vegetation Plot 3 – MY-05 – 8/17/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 30 2023-MY05   Vegetation Plot 4 – MY-00 – 5/15/19 Vegetation Plot 4 – MY-05 – 8/16/23 Vegetation Plot 5 – MY-00 – 5/15/19 Vegetation Plot 5 – MY-05 – 8/17/23 Vegetation Plot 6 – MY-00 – 5/15/19 Vegetation Plot 6 – MY-05 – 8/17/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 31 2023-MY05   Vegetation Plot 7 – MY-00 – 5/15/19 Vegetation Plot 7 – MY-05 – 8/17/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 32 2023-MY05   Random Vegetation Monitoring Plot Photos Vegetation Plot R1 – MY-05 – 8/16/23 Vegetation Plot R2 – MY-05 – 8/16/23 Vegetation Plot R3 – MY-05 – 8/17/23 Vegetation Plot R4 – MY-05 – 8/17/23 Vegetation Plot R5 – MY-05 – 8/16/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 33 2023-MY05   Easement Encroachment Area Photos Scalloping near the bottom of the site, with approximate easement line – 12/7/23 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 34 2023-MY05       APPENDIX C Vegetation Plot Data   Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 35 2023-MY05   Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total 2 4 4 44 11 22 1 1 33 1 1 11 5 5 43311 1 44 2 2 44 44 40 7 1 11 4 3 3 22 11 11 112 2111111112211 55 1 1 1 1 22 11 11 1 84132 6 10 1 1 1 1 1 11 11 33 11 7 1 3 11 33 66 11 1 1 12 80 12 32 11 25 16 33 10 13 12 12 12 22 512510686115 777810 486 3,237 486 1,295 445 1,012 647 1,335 405 526 486 486 486 890 Table 7. Stem Count by Plot and Species Stony Fork Restoration Site, DMS Project #97085 Current Plot Data (MY05 2023) Plot 06 Plot 7 11 0.02 0.02 Plot 05 Species Oak (Quercus sp.) Pawpaw (Asimina triloba ) Plot 02 Plot 03 Plot 04 Eastern Baccharis (Baccharis halimifolia ) Plot 01 Species count Stems per ACRE White Oak (Quercus alba ) Willow Oak (Quercus phellos ) American Elm (Ulmus americana ) American Holly (Illex opaca ) American Persimmon (Diospyros virginiana ) American Sycamore (Platanus occidentalis ) Bald Cypress (Taxodium distichum ) Black Willow (Salix nigra ) Elderberry (Sambucus canadensis ) Green Ash (Fraxinus pennsylvanica ) Loblolly Pine (Pinus taeda ) Pin Oak (Quercus palustris ) Red Maple (Acer rubrum ) Red Oak (Quercus rubra ) River Birch (Betula nigra ) Silky Dogwood (Cornus amomum ) Spicebush (Lindera benzoin ) Sugar Berry (Celtis laevigata ) Swamp Chestnut Oak (Quercus michauxii ) Sweet Bay (Magnolia virginiana ) Sweetgum (Liquidambar styraciflua ) Tulip Poplar (Liriodendron tulipifera ) Water Oak (Quercus nigra ) Wax Myrtle (Myrica cerifera ) 11 Unknown Stem count 1 Winged Sumac (Rhus copallinum ) 11size (ares) 0.02 0.02 0.02 0.02size (ACRES)0.02 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 36 2023-MY05   Planted Total Planted Total Planted Total Planted Total Planted Total 22 1 33 4 4 33 66 55 11 33 33 11 11 2 2 2 2 55 55 44 18 1 3 11 11 11 22 1 1 55 11 99 11 11 11 11211 3 11 11 1 1 9 10 17471620212410 21 56575868712 364 405 688 1,902 647 809 850 971 405 850 Winged Sumac (Rhus copallinum ) 11size (ares) 0.02 0.02 0.02 0.02size (ACRES)0.02 11 Unknown Stem count 1 Sweet Bay (Magnolia virginiana ) Sweetgum (Liquidambar styraciflua ) Tulip Poplar (Liriodendron tulipifera ) Water Oak (Quercus nigra ) Wax Myrtle (Myrica cerifera ) River Birch (Betula nigra ) Silky Dogwood (Cornus amomum ) Spicebush (Lindera benzoin ) Sugar Berry (Celtis laevigata ) Swamp Chestnut Oak (Quercus michauxii ) Species count Stems per ACRE White Oak (Quercus alba ) Willow Oak (Quercus phellos ) American Elm (Ulmus americana ) American Holly (Illex opaca ) American Persimmon (Diospyros virginiana ) American Sycamore (Platanus occidentalis ) Bald Cypress (Taxodium distichum ) Black Willow (Salix nigra ) Elderberry (Sambucus canadensis ) Green Ash (Fraxinus pennsylvanica ) Loblolly Pine (Pinus taeda ) Pin Oak (Quercus palustris ) R ed Maple (Acer rubrum ) Red Oak (Quercus rubra ) Oak (Quercus sp.) Pawpaw (Asimina triloba ) Plot R2 Plot R3 Plot R4 Eastern Baccharis (Baccharis halimifolia ) Plot R1 Plot R5 Species Table 7. Stem Count by Plot and Species Stony Fork Restoration Site, DMS Project #97085 Current Plot Data (MY05 2023) Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 37 2023-MY05   Planted Total Planted Total Planted Total Planted Total Planted Total 63 11 33 2244 34 34 37 37 43 44 40 40 9 9 77 55 557711 11 15 1 7 2 6 2 1 77 4 31122 26 26 37 37 31 31 25 25 29 29 85 13 30 2 2 1 1 18 18 2 10 10 9 9 11 11 7 7 3 3 8654112 22 23 25 13 14 27 27 17 17 2 2 8 8 7 7 10 10 8 8 10 10 1 22 66 66 557777 11111 51 20 11 2 8 213 1112 6814201414 11 11 221 5 5 4 5 5 6 12 15 1 4 7 15 17 19 19 23 23 30 30 3 3 4 4 199 199 158 339 149 208 170 232 187 212 301 307 14 23 11 20 12 19 18 20 15 17 533 1,143 502 701 573 782 631 715 1,015 1,035 12 12 size (ares) 0.30 0.30 0.30 0.30 size (ACRES)0.30 Tulip Poplar (Liriodendron tulipifera ) Water Oak (Quercus nigra ) Wax Myrtle (Myrica cerifera ) 12 12 Unknown Stem count 12 Winged Sumac (Rhus copallinum ) Spicebush (Lindera benzoin ) Sugar Berry (Celtis laevigata ) Swamp Chestnut Oak (Quercus michauxii ) Sweet Bay (Magnolia virginiana ) Sweetgum (Liquidambar styraciflua ) Pin Oak (Quercus palustris ) Red Maple (Acer rubrum ) Red Oak (Quercus rubra ) River Birch (Betula nigra ) Silky Dogwood (Cornus amomum ) Annual Means Species count Stems per ACRE Table 7. Stem Count by Plot and Species Stony Fork Restoration Site, DMS Project #97085 White Oak (Quercus alba ) Willow Oak (Quercus phellos ) American Elm (Ulmus americana ) American Holly (Illex opaca ) American Persimmon (Diospyros virginiana ) American Sycamore (Platanus occidentalis ) Bald Cypress (Taxodium distichum ) Black Willow (Salix nigra ) Elderberry (Sambucus canadensis ) Green Ash (Fraxinus pennsylvanica ) Loblolly Pine (Pinus taeda ) MY00 (2019) Species Oak (Quercus sp.) Pawpaw (Asimina triloba ) MY03 (2021) MY02 (2020) MY01 (2019) Eastern Baccharis (Baccharis halimifolia ) MY05 (2023) Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 38 2023-MY05      APPENDIX D Stream Measurement and Geomorphology Data    Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 39 2023-MY05  Dimension and Substrate Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) based on AB BKF area 206.8 206.7 206.7 206.6 206.8 206.6 206.6 206.6 206.6 206.6 192.5 192.5 192.4 192.6 192.5 Bankfull Width (ft) 12.6 11.7 11.6 8.0 10.8 9.3 11.0 10.2 11.3 10.2 12.6 11.9 12.5 12.5 13.0 Floodprone Width (ft) - - - - ->80 >80 >80 >80 >80 53.3 53.2 50.1 52.7 55.4 Bankfull Mean Depth (ft) 0.9 1.0 1.0 1.4 1.1 0.8 0.6 0.7 0.6 0.7 1.0 1.0 1.0 1.0 1.0 Bankfull Max Depth (ft) 1.9 2.0 2.1 2.3 2.2 1.2 1.1 1.3 1.3 1.3 1.6 1.7 1.5 1.5 1.6 Cross-Sectional Area (ft2) based on AB BKF area 11.5 11.5 11.5 11.5 11.5 7.0 7.0 7.0 7.0 7.0 12.5 12.5 12.5 12.5 12.5 Cross-Sectional Area (ft2) based on AB BKF elevation 11.5 11.9 12.1 12.9 11.1 7.0 7.1 6.8 6.4 6.5 12.5 13.2 13.8 11.6 12.9 Bankfull Width/Depth Ratio - - - - -12.2 17.3 14.8 18.3 14.9 12.8 11.4 12.6 12.5 13.5 Bankfull Entrenchment Ratio - - - - -8.7 7.2 8.0 7.2 7.9 4.2 4.5 4.0 4.2 4.3 Bankfull Bank Height Ratio - - - - -1.0 0.9 1.0 0.8 0.8 1.0 1.0 1.0 0.9 1.0 d50 (mm) - - - - -22 32 24 48 -38 46 20 69 - Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) based on AB BKF area 192.0 191.9 191.9 191.9 192.0 182.1 182.2 182.2 182.3 182.2 181.7 181.8 181.7 181.7 181.6 Bankfull Width (ft) 12.5 13.0 12.4 12.7 14.2 12.2 13.6 13.2 14.2 13.2 12.0 13.1 11.5 11.2 10.3 Floodprone Width (ft) - - - - ->80 >80 >80 >80 >80 - - - - - Bankfull Mean Depth (ft) 1.1 1.1 1.1 1.1 1.0 0.9 0.8 0.8 0.7 0.8 1.2 1.1 1.3 1.3 1.4 Bankfull Max Depth (ft) 1.9 2.1 2.1 2.2 2.0 1.4 1.3 1.3 1.4 1.4 2.4 2.4 2.5 2.4 2.4 Cross-Sectional Area (ft2) based on AB BKF area 13.6 13.6 13.6 13.6 13.6 10.6 10.6 10.6 10.6 10.6 14.5 14.5 14.5 14.5 14.5 Cross-Sectional Area (ft2) based on AB BKF elevation 13.6 14.5 15.2 14.6 13.8 10.6 10.1 9.3 8.2 9.8 14.5 14.3 15.2 15.0 16.2 Bankfull Width/Depth Ratio - -- - -14.1 17.4 16.4 19.1 16.5 - - - - - Bankfull Entrenchment Ratio - - - - -6.6 5.9 6.1 5.7 6.1 - - - - - Bankfull Bank Height Ratio - - - - -1.0 1.0 1.0 0.9 1.0 - - - - - d50 (mm) - - - - -52 44 25 36 -- - - - - Table 8. Cross Section Dimensional Morphology Summary Stony Fork Stream Restoration Site, DMS Project #97085 Cross-Section 1 (Pool) Station 13+58, SF Cross-Section 2 (Riffle) Station 13+85, SF Cross-Section 3 (Riffle) Station 22+44, SF Cross-Section 4 (Pool) Station 26+17, SF Cross-Section 5 (Riffle) Station 35+12, SF Cross-Section 6 (Pool) Station 41+94, SF   Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 40 2023-MY05  Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) based on AB BKF area 176.0 176.0 176.0 176.0 176.0 175.3 175.2 175.2 175.3 175.1 207.0 206.9 207.3 207.8 207.8 Bankfull Width (ft) 11.6 13.4 14.2 13.9 15.3 13.5 14.5 15.7 11.4 13.6 5.5 5.9 8.2 5.5 8.5 Floodprone Width (ft) >90 >90 >90 >90 >90 - - - - -- - - - - Bankfull Mean Depth (ft) 1.1 1.0 0.9 0.9 0.8 1.5 1.4 1.3 1.8 1.5 0.7 0.6 0.4 0.7 0.4 Bankfull Max Depth (ft) 1.7 1.6 1.8 1.6 1.6 2.7 2.7 2.5 2.8 2.6 1.1 1.1 0.8 0.8 0.7 Cross-Sectional Area (ft2) based on AB BKF area 12.8 12.8 12.8 12.8 12.8 20.7 20.7 20.7 20.7 20.7 3.7 3.7 3.7 3.7 3..7 Cross-Sectional Area (ft2) based on AB BKF elevation 12.8 13.2 13.3 13.0 12.7 20.7 21.4 21.5 20.0 22.9 3.7 4.0 2.0 0.0 0.0 Bankfull Width/Depth Ratio 10.4 14.0 15.7 15.0 18.3 - - - - - - - - - - Bankfull Entrenchment Ratio 8.0 6.8 6.5 6.6 5.9 - - - - - - - - - - Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 0.9 - - - - - - - - - - d50 (mm) 16 29 41 65 - - - - - - - - - - Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) based on AB BKF area 207.1 207.1 207.2 207.3 207.4 198.4 198.3 198.3 198.3 198.3 198.4 198.3 198.3 198.4 198.5 Bankfull Width (ft) 6.2 5.5 5.4 6.8 7.1 6.0 5.8 5.7 6.1 5.9 7.5 7.3 7.4 7.3 7.4 Floodprone Width (ft) 38.0 39.4 41.5 34.1 41.5 >60 >60 >60 >60 >60 - - - - - Bankfull Mean Depth (ft) 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.4 0.3 0.3 0.6 0.7 0.7 0.7 0.7 Bankfull Max Depth (ft) 0.7 0.7 0.7 0.4 0.5 0.7 0.7 0.6 0.7 0.6 1.2 1.2 1.1 1.2 1.1 Cross-Sectional Area (ft2) based on AB BKF area 2.2 2.2 2.2 2.2 2.2 2.0 2.0 2.0 2.0 2.0 4.8 4.8 4.8 4.8 4.8 Cross-Sectional Area (ft2) based on AB BKF elevation 2.2 2.1 1.8 1.1 0.5 2.0 2.6 2.6 2.2 2.3 4.8 5.5 5.3 5.0 4.3 Bankfull Width/Depth Ratio 17.7 13.7 13.4 20.9 22.9 18.3 17.1 16.0 18.5 17.6 - - - - - Bankfull Entrenchment Ratio 6.1 7.2 7.7 5.0 5.9 10.9 10.9 11.2 10.7 10.8 - - - - - Bankfull Bank Height Ratio 1.0 0.9 0.8 1.2 1.0 1.0 1.1 1.2 1.1 1.0 - - - - - d50 (mm) 18 20 2.5 0.062 - 78 75 57 66 - - - - - - Table 8. Cross Section Dimensional Morphology Summary Stony Fork Stream Restoration Site, DMS Project #97085 Cross-Section 7 (Riffle) Station 42+58, SF Cross-Section 8 (Pool) Station 57+19, SF Cross-Section 9 (Pool) Station 57+44, T3 Cross-Section 12 (Pool) Station 99+25, T1 Cross-Section 10 (Riffle) Station 96+69, T3 Cross-Section 11 (Riffle) Station 99+07, T1   Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 41 2023-MY05  Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) based on AB BKF area 188.4 188.4 188.2 188.4 188.4 187.9 187.9 188.0 188.0 188.0 180.9 180.8 180.7 180.6 180.9 Bankfull Width (ft) 11.3 12.7 9.5 8.1 11.5 9.7 11.8 11.1 11.5 12.7 11.8 11.7 10.9 10.4 11.8 Floodprone Width (ft) - - - - - 43.4 46.8 47.2 48.9 50.7 - - - - - Bankfull Mean Depth (ft) 0.8 0.7 1.0 1.2 0.8 0.6 0.5 0.5 0.5 0.5 1.0 1.0 1.0 1.1 1.0 Bankfull Max Depth (ft) 1.5 1.4 1.7 2.1 1.9 1.0 1.1 1.1 1.2 1.2 1.8 1.9 1.8 1.9 1.9 Cross-Sectional Area (ft2) based on AB BKF area 9.3 9.3 9.3 9.3 9.3 5.8 5.8 5.8 5.8 5.8 11.2 11.2 11.2 11.2 11.2 Cross-Sectional Area (ft2) based on AB BKF elevation 9.3 8.7 11.0 9.0 9.6 5.8 5.3 4.4 4.6 4.8 11.2 11.8 12.8 14.0 11.3 Bankfull Width/Depth Ratio - -- - -16.4 24.0 21.4 22.9 28.0 - - - - - Bankfull Entrenchment Ratio - - - - -4.5 4.0 4.2 4.3 4.0 - - - - - Bankfull Bank Height Ratio - - - - -1.0 0.8 0.9 0.8 0.8 - - - - - d50 (mm) - - - - -42 16 1.4 2 -- - - - - Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) based on AB BKF area 180.7 180.7 180.8 180.8 180.8 Bankfull Width (ft) 8.6 9.9 10.0 9.9 9.2 Floodprone Width (ft) >80 >80 >80 >80 >80 Bankfull Mean Depth (ft) 0.7 0.6 0.6 0.6 0.7 Bankfull Max Depth (ft) 1.2 1.1 1.0 1.0 1.1 Cross-Sectional Area (ft2) based on AB BKF area 6.0 6.0 6.0 6.0 6.0 Cross-Sectional Area (ft2) based on AB BKF elevation 6.0 5.8 5.2 5.1 5.6 Bankfull Width/Depth Ratio 12.3 16.3 16.6 16.4 14.1 Bankfull Entrenchment Ratio 9.4 8.3 7.6 8.1 8.8 Bankfull Bank Height Ratio 1.0 1.0 0.9 0.9 0.9 d50 (mm) 45 44 37 11 - Table 8. Cross Section Dimensional Morphology Summary Stony Fork Stream Restoration Site, DMS Project #97085 Cross-Section 13 (Pool) Station 252+25, T2 Cross-Section 14 (Riffle) Station 225+97, T2 Cross-Section 15 (Pool) Station 226+04, T2 Cross-Section 16 (Riffle) Station 252+25, T2     Cross-Section Plots Station Elevation 0.0 208.52 85.6 206.70 206.79 5.1 207.98 88.1 206.72 11.5 8.8 207.61 88.2 206.88 11.1 12.3 207.33 10.8 14.7 207.23 --- 18.2 207.19 --- 22.1 207.24 2.2 27.3 207.11 1.1 33.4 207.13 --- 38.4 207.12 --- 45.9 206.95 --- 47.1 206.96 204.6 49.2 206.76 51.0 206.37 51.6 206.36 51.9 205.98 52.2 205.82 52.9 205.46 53.8 205.31 54.1 205.14 54.5 204.65 55.3 204.59 55.9 204.80 56.5 204.91 56.7 204.93 57.7 205.58 58.1 205.60 58.3 206.28 58.9 206.51 59.9 206.85 62.0 206.85 63.5 207.06 64.3 207.44 66.2 207.71 73.2 207.49 80.2 206.99 River Basin:Neuse River Site:Stony Fork XS ID XS1 Drainage Area (sq mi):0.28 Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven W / D Ratio: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: Total Cross-Sectional Area: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 204 205 206 207 208 209 0 1020304050607080 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS1, Pool, SF Bankfull MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0000 208.2690 206.62 0.0677 208.0340 7.0 4.8614 207.8300 6.5 8.3538 207.6810 10.2 14.4387 207.2670 207.9 21.2078 206.8330 80.8 27.2292 206.5630 1.3 31.9171 206.7470 0.7 35.3864 206.4910 14.9 38.8833 206.8720 7.9 42.0408 206.7890 0.8 42.9235 206.7160 205.3 44.1759 206.5350 45.2628 206.4030 45.9116 206.2250 46.2732 205.9740 46.7009 205.7230 47.7917 205.4950 48.0540 205.4280 48.6447 205.3440 49.0837 205.3250 50.4301 205.5520 51.0532 205.4660 51.8120 206.0080 52.6052 206.3830 53.8286 206.6120 56.5000 206.6030 59.0637 206.5730 61.6345 206.4990 65.2497 206.5870 70.4505 206.8980 74.1058 207.0060 77.8656 206.8680 83.6099 206.7000 83.7147 206.9980 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.28 River Basin:Neuse River Site:Stony Fork XS ID XS2 205 206 206 207 207 208 208 209 209 0 1020304050607080 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS2, Riffle, SF Bankfull Flood Prone Area MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 195.60 192.48 0.1 195.34 12.5 4.1 195.37 12.9 8.7 195.05 13.0 13.5 194.71 194.1 15.9 194.00 55.4 20.2 193.35 1.6 24.4 193.08 1.0 28.8 192.71 13.5 32.7 192.69 4.3 36.0 192.66 1.0 37.3 192.58 190.9 38.8 192.17 40.7 191.59 41.6 191.22 42.2 190.88 43.7 190.89 45.2 190.93 46.9 191.11 48.3 191.71 49.2 192.22 50.0 192.46 54.0 192.60 58.8 192.70 62.8 193.16 66.4 193.72 71.0 194.06 71.0 194.51 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.46 River Basin:Neuse River Site:Stony Fork XS ID XS3 190 191 192 193 194 195 196 0 10203040506070 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS3, Riffle, SF Bankfull Flood Prone Area MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 195.23 191.98 0.1 194.87 13.6 4.2 194.46 13.8 8.5 194.20 14.2 12.7 193.88 --- 15.2 193.48 --- 17.6 192.94 2.0 19.6 192.81 1.0 22.6 192.25 --- 24.5 192.32 --- 25.3 192.08 --- 26.5 191.23 190.0 27.7 190.55 29.4 190.01 31.7 190.00 32.3 190.47 33.7 191.28 35.8 191.54 37.8 191.85 41.4 192.10 46.1 192.14 50.6 192.15 52.9 192.47 57.6 192.84 61.6 192.94 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.46 River Basin:Neuse River Site:Stony Fork XS ID XS4 189 190 191 192 193 194 195 196 0 102030405060 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS4, Pool, SF Bankfull MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 183.06 182.20 0.0 182.49 10.6 4.2 182.26 9.8 10.3 182.55 13.2 15.8 182.41 183.6 21.0 182.57 80.7 26.9 182.52 1.4 30.1 182.22 0.8 31.0 182.28 16.5 33.2 181.75 6.1 34.2 181.50 1.0 35.2 181.11 180.8 35.8 180.92 37.0 180.92 37.7 180.80 39.4 180.78 40.2 180.95 40.7 181.32 42.6 181.82 43.9 182.11 44.7 182.21 47.8 182.41 51.8 182.44 56.6 182.68 61.2 182.46 66.1 182.53 71.6 182.60 75.9 182.55 80.4 182.64 80.7 183.27 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.46 River Basin:Neuse River Site:Stony Fork XS ID XS5 180 181 182 183 184 0 1020304050607080 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS5, Riffle, SF Bankfull Flood Prone Area MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 183.31 79.7 182.72 181.59 0.0 183.26 81.0 182.64 14.5 1.0 183.01 81.1 183.12 16.2 2.3 182.79 10.3 5.2 182.62 --- 7.3 182.60 --- 8.5 182.43 2.4 11.0 182.15 1.4 13.8 182.09 --- 15.8 181.99 --- 18.2 181.78 --- 20.6 181.79 179.2 21.4 181.77 22.5 181.49 23.1 181.24 23.3 180.69 24.0 179.71 25.3 179.21 26.4 179.19 27.8 179.43 29.1 179.79 29.5 180.20 30.0 180.70 31.4 181.43 33.1 181.69 34.3 181.90 38.0 181.91 42.1 181.75 45.2 181.75 49.2 181.70 53.5 182.01 56.4 182.20 60.6 182.46 68.5 182.41 72.8 182.55 76.9 182.67 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.46 River Basin:Neuse River Site:Stony Fork XS ID XS6 178 179 180 181 182 183 184 0 1020304050607080 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS6, Pool, SF Bankfull MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 177.93 176.03 5.7 176.63 12.8 10.7 176.42 12.7 15.4 176.21 15.3 20.5 176.10 177.7 26.2 176.02 91.2 31.5 176.04 1.6 36.8 176.30 0.8 38.2 176.20 18.3 39.7 175.89 5.9 40.8 175.54 0.9 41.9 175.25 174.4 42.3 175.10 42.6 174.80 43.3 174.43 44.1 174.40 45.8 174.47 47.0 174.46 48.0 174.72 48.4 175.12 49.4 175.19 50.3 175.49 52.2 175.89 54.5 176.04 59.9 175.93 63.9 175.80 68.8 175.93 72.1 176.07 75.9 176.20 79.1 176.18 83.6 176.49 87.5 176.57 90.3 176.81 92.4 176.86 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.83 River Basin:Neuse River Site:Stony Fork XS ID XS7 174 175 176 177 178 179 0 102030405060708090 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS7, Riffle, SF Bankfull Flood Prone Area MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 176.49 175.10 0.1 175.95 20.7 4.8 175.58 22.9 9.6 175.60 13.6 14.9 175.67 --- 20.6 175.61 --- 25.7 175.53 2.6 33.7 175.48 1.5 40.4 175.20 --- 44.1 174.96 --- 44.8 174.64 --- 46.3 174.40 172.5 47.0 174.12 47.8 173.39 49.3 172.84 50.5 172.50 52.2 172.58 53.1 172.78 54.3 172.92 55.1 173.53 55.7 174.21 56.3 174.75 57.7 175.12 58.4 175.29 61.7 175.38 66.4 175.39 71.9 175.78 76.1 176.13 78.6 176.43 80.9 176.66 80.9 177.61 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.83 River Basin:Neuse River Site:Stony Fork XS ID XS8 172 173 174 175 176 177 178 179 0 1020304050607080 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS8, Pool, SF Bankfull MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 210.82 60.5 209.3750 207.79 -0.1 210.30 3.7 3.2 210.23 0.0 7.3 209.95 8.5 9.4 209.82 --- 11.4 209.23 --- 13.2 208.72 0.7 16.9 207.92 0.4 19.3 207.53 --- 21.1 207.49 --- 23.6 207.57 --- 24.5 207.51 207.1 25.3 207.42 25.8 207.24 26.3 207.23 26.6 207.11 27.2 207.22 27.8 207.21 28.7 207.37 29.6 207.21 30.4 207.39 30.9 207.49 32.1 207.59 33.3 207.57 34.9 207.54 36.2 207.35 37.5 207.32 40.9 207.36 43.4 207.42 46.6 207.66 48.3 207.77 51.9 208.11 54.4 208.39 57.0 208.60 59.4 208.88 60.5 208.89 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.04 River Basin:Neuse River Site:Stony Fork XS ID XS9 205 206 207 208 209 210 211 212 0 102030405060 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS9, Pool, T3 Bankfull MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 209.74 207.37 3.8 208.99 2.2 8.6 208.58 0.5 16.1 208.14 7.1 24.5 207.69 207.9 33.8 207.62 41.5 38.1 207.62 0.5 40.3 207.51 0.3 41.3 207.35 22.9 42.5 207.08 5.9 43.2 207.06 1.0 43.8 207.04 206.9 44.6 207.02 45.7 206.87 46.4 206.95 47.1 206.93 47.6 207.21 48.2 207.36 49.5 207.36 52.4 207.37 56.8 207.21 59.0 207.63 63.7 207.96 67.3 208.27 70.1 208.43 71.9 208.43 71.9 209.11 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.04 River Basin:Neuse River Site:Stony Fork XS ID XS10 206 207 208 209 210 211 0 10203040506070 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS10, Riffle, T3 Bankfull Flood Prone Area MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 199.12 198.32 0.1 198.81 2.0 4.6 198.70 2.3 9.3 198.88 5.9 14.1 198.71 199.0 17.2 198.66 63.8 22.4 198.60 0.6 28.0 198.47 0.3 31.6 198.63 17.6 33.7 198.50 10.8 35.2 198.43 1.0 36.1 198.34 197.7 37.3 198.19 38.2 197.89 38.6 197.69 39.2 197.68 40.2 197.85 41.1 197.97 41.5 198.17 42.3 198.35 44.6 198.54 46.7 198.52 50.5 198.64 54.8 198.70 59.4 198.76 63.8 198.94 67.3 199.35 72.4 199.47 72.5 199.79 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.02 River Basin:Neuse River Site:Stony Fork XS ID XS11 197 198 198 199 199 200 200 201 201 0 10203040506070 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS11, Riffle, T1 Bankfull Flood Prone Area MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 199.24 198.47 0.0 198.96 4.8 6.9 198.95 4.3 12.9 198.82 7.4 19.0 198.69 --- 25.6 198.53 --- 31.5 198.58 1.1 37.2 198.60 0.7 37.5 198.56 --- 41.6 198.51 --- 42.5 198.19 --- 43.5 197.99 197.4 44.1 197.76 44.7 197.58 45.2 197.43 45.7 197.42 46.3 197.39 46.7 197.39 47.4 197.59 48.1 197.96 48.3 198.15 49.4 198.62 50.3 198.51 52.5 198.67 54.0 198.70 55.5 199.01 58.0 199.51 61.5 199.72 64.1 199.77 67.5 199.81 71.0 199.81 75.2 200.03 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.02 River Basin:Neuse River Site:Stony Fork XS ID XS12 196 197 198 199 200 201 0 10203040506070 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS12, Pool, T1 Bankfull MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 190.20 188.35 2.9 189.40 9.3 7.1 189.06 9.6 13.5 188.48 11.5 17.4 188.46 --- 22.2 188.38 --- 27.1 188.37 1.9 31.7 188.75 0.8 35.3 188.18 --- 37.1 188.07 --- 38.6 187.96 --- 39.2 187.69 186.4 40.1 187.05 40.6 186.65 41.8 186.43 43.0 186.48 43.9 187.49 44.9 188.14 46.1 188.48 49.9 188.69 53.2 189.14 59.2 189.56 62.5 189.95 62.6 190.51 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.14 River Basin:Neuse River Site:Stony Fork XS ID XS13 186 187 188 189 190 191 0 102030405060 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS13, Pool, T2 Bankfull MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 190.40 187.99 0.1 189.65 5.8 5.2 189.14 4.8 10.9 188.59 12.7 16.9 188.26 189.2 23.1 188.17 50.7 28.9 188.01 1.2 31.3 187.97 0.5 35.1 187.76 28.0 36.0 187.56 4.0 36.8 186.92 0.8 38.1 186.83 186.8 39.6 186.99 39.9 187.21 41.6 187.73 42.9 188.08 46.9 188.27 51.7 188.50 56.5 189.31 62.3 189.72 62.3 190.54 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.14 River Basin:Neuse River Site:Stony Fork XS ID XS14 186 187 188 189 190 191 192 0 102030405060 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS14, Riffle, T2 Bankfull Flood Prone Area MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 183.66 180.86 4.2 182.41 11.2 8.2 182.22 11.3 15.5 181.59 11.8 21.0 181.83 --- 26.3 181.51 --- 28.0 181.28 1.9 32.7 181.04 1.0 35.6 180.90 --- 36.4 180.90 --- 38.6 180.55 --- 40.1 180.34 178.9 41.0 179.82 42.1 179.87 43.2 179.85 44.2 179.65 44.9 179.33 46.2 178.93 47.2 179.38 47.5 179.55 48.1 179.68 48.5 180.90 50.1 181.21 54.4 181.60 61.5 181.95 70.5 181.99 76.6 181.83 76.6 182.53 Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven Drainage Area (sq mi):0.22 River Basin:Neuse River Site:Stony Fork XS ID XS15 178 179 180 181 182 183 184 185 0 10203040506070 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS15, Pool, T2 Bankfull MY00 MY01 MY02 MY03 MY05 Cross-Section Plots Station Elevation 0.0 183.72 180.77 3.4 182.56 6.0 8.6 181.95 5.6 14.2 181.40 9.2 21.1 181.19 181.9 27.2 181.00 81.1 34.0 180.90 1.1 35.0 180.78 0.7 37.0 180.29 14.1 37.8 180.05 8.8 39.2 179.99 0.9 40.8 179.75 179.7 41.8 179.68 42.7 179.71 43.1 180.48 44.2 180.68 50.0 180.69 56.0 181.16 63.2 181.42 68.4 181.57 73.5 181.51 79.7 181.77 85.7 181.65 90.4 181.48 90.5 182.33 River Basin:Neuse River Site:Stony Fork XS ID XS16 Drainage Area (sq mi):0.22 Date:7/24/2023 Field Crew:T. Seelinger/E. Teague/ C. Kleven SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Thalweg Elevation: Total Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: 179 180 181 182 183 184 185 0 102030405060708090 El e v a t i o n ( f e e t ) Station (feet) Stony Fork, XS16, Riffle, T2 Bankfull Flood Prone Area MY00 MY01 MY02 MY03 MY05 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 58 2023-MY05      APPENDIX E Hydrologic Data    Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 59 2023-MY05  Table 9. Verification of Bankfull Events Stony Fork Restoration Site, DMS Project #97085 Monitoring Year Date of Occurrence Method MY01 July 12, 2019 Onsite stream gauge July 23, 2019 Onsite stream gauge August 14, 2019 Onsite stream gauge September 5, 2019 Onsite stream gauge October 13, 2019 Onsite stream gauge October 20, 2019 Onsite stream gauge MY02 February 6, 2020 Onsite stream gauge February 22, 2020 Onsite stream gauge July 23, 2020 Onsite stream gauge August 4, 2020 Onsite stream gauge August 15, 2020 Onsite stream gauge August 31, 2020 Onsite stream gauge September 25, 2020 Onsite stream gauge September 29, 2020 Onsite stream gauge MY03 February 16, 2021 Onsite stream gauge June 9, 2021 Onsite stream gauge July 8, 2021 Onsite stream gauge July 19, 2021 Onsite stream gauge July 27, 2021 Onsite stream gauge MY04 January 23, 2022 Onsite stream gauge January 30, 2022 Onsite stream gauge September 10, 2022 Onsite stream gauge MY05 April 30, 2023 Onsite stream gauge July 7, 2023 Onsite stream gauge July 14, 2023 Onsite stream gauge        0.0 1.0 2.0 3.0 4.0 178 179 180 181 182 1- J a n - 2 3 10 - J a n - 2 3 19 - J a n - 2 3 28 - J a n - 2 3 6- F e b - 2 3 15 - F e b - 2 3 24 - F e b - 2 3 5- M a r - 2 3 14 - M a r - 2 3 23 - M a r - 2 3 1- A p r - 2 3 10 - A p r - 2 3 19 - A p r - 2 3 28 - A p r - 2 3 7- M a y - 2 3 16 - M a y - 2 3 25 - M a y - 2 3 3- J u n - 2 3 12 - J u n - 2 3 21 - J u n - 2 3 30 - J u n - 2 3 9- J u l - 2 3 18 - J u l - 2 3 27 - J u l - 2 3 5- A u g - 2 3 14 - A u g - 2 3 23 - A u g - 2 3 1- S e p - 2 3 10 - S e p - 2 3 19 - S e p - 2 3 28 - S e p - 2 3 7- O c t - 2 3 16 - O c t - 2 3 25 - O c t - 2 3 3- N o v - 2 3 12 - N o v - 2 3 21 - N o v - 2 3 30 - N o v - 2 3 9- D e c - 2 3 18 - D e c - 2 3 27 - D e c - 2 3 Ra i n f a l l ( i n ) St r e a m S t a g e E l e v a t i o n ( f t ) Date Stony Fork Restoration Site Hydrograph Stream Gauge SF Main Rainfall Sensor Depth Stream Bed Elevation Stream Stage Elevation Bankfull Elevation Gauge malfunction Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 61 2023-MY05  Table 10. Verification of Stream Flow Stony Fork Restoration Site, DMS Project #97085 Gauge Camera Reach Dates Achieving Maximum Consecutive Days Dates Achieving Maximum Consecutive Days T1 January 1 – June 10; June 20 – August 13; August 28 – November 5 161 February 22 – April 2 40 T1A January 1 – June 17; June 20 – November 5 139 January 1 – June 16; June 20 – August 12; August 30 – November 2 167 T2 January 29 – March 15; March 21 – June 13; June 21 – August 1; August 14 – November 5 85 February 22 – May 6 74 T3 January 1 – June 7 157 February 22 – June 5; October 3 – December 7 104 Table 11. Stream Flow Criteria Attainment Stony Fork Restoration Site, DMS Project #97085 Greater than 30 Days of Flow/Max Consecutive Days Reach MY-01 2019 MY-02 2020 MY-03 2021 MY-04 2022 MY-05 2023 MY-06 2024 MY-07 2025 T1 (Gauge) Yes/60 Yes/152 Yes/147 Yes/158 Yes/161 T1 (Camera) * * Yes/76 Yes/56 Yes/40 T1A (Gauge) Yes/182 Yes/152 Yes/259 Yes/174 Yes/139 T1A (Camera) Yes/46 Yes/183 Yes/41 Yes/149 Yes/167 T2 (Gauge) Yes/85 Yes/152 Yes/115 Yes/155 Yes/85 T2 (Camera) Yes/84 Yes/53 Yes/75 Yes/118 Yes/74 T3 (Gauge) Yes/55 Yes/152 Yes/256 Yes/46 Yes/157 T3 (Camera) Yes/55 * Yes/106 Yes/154 Yes/104 *Camera obscured or malfunctioned for most of the year           0.0 1.0 2.0 3.0 4.0 203 204 205 1- J a n - 2 3 10 - J a n - 2 3 19 - J a n - 2 3 28 - J a n - 2 3 6- F e b - 2 3 15 - F e b - 2 3 24 - F e b - 2 3 5- M a r - 2 3 14 - M a r - 2 3 23 - M a r - 2 3 1- A p r - 2 3 10 - A p r - 2 3 19 - A p r - 2 3 28 - A p r - 2 3 7- M a y - 2 3 16 - M a y - 2 3 25 - M a y - 2 3 3- J u n - 2 3 12 - J u n - 2 3 21 - J u n - 2 3 30 - J u n - 2 3 9- J u l - 2 3 18 - J u l - 2 3 27 - J u l - 2 3 5- A u g - 2 3 14 - A u g - 2 3 23 - A u g - 2 3 1- S e p - 2 3 10 - S e p - 2 3 19 - S e p - 2 3 28 - S e p - 2 3 7- O c t - 2 3 16 - O c t - 2 3 25 - O c t - 2 3 3- N o v - 2 3 12 - N o v - 2 3 21 - N o v - 2 3 30 - N o v - 2 3 9- D e c - 2 3 18 - D e c - 2 3 27 - D e c - 2 3 Ra i n f a l l ( i n ) St r e a m S t a g e E l e v a t i o n ( f t ) Date Stony Fork Restoration Site Hydrograph T1 Stream Flow Gauge Rainfall Stream Stage Elevation Stream Bed Elevation Sensor Elevation Flow Elevation Stream Flow (Camera) 161 Days 70 Days Camera obscured 55 Days 0.0 1.0 2.0 3.0 4.0 201 202 203 204 205 1- J a n - 2 3 10 - J a n - 2 3 19 - J a n - 2 3 28 - J a n - 2 3 6- F e b - 2 3 15 - F e b - 2 3 24 - F e b - 2 3 5- M a r - 2 3 14 - M a r - 2 3 23 - M a r - 2 3 1- A p r - 2 3 10 - A p r - 2 3 19 - A p r - 2 3 28 - A p r - 2 3 7- M a y - 2 3 16 - M a y - 2 3 25 - M a y - 2 3 3- J u n - 2 3 12 - J u n - 2 3 21 - J u n - 2 3 30 - J u n - 2 3 9- J u l - 2 3 18 - J u l - 2 3 27 - J u l - 2 3 5- A u g - 2 3 14 - A u g - 2 3 23 - A u g - 2 3 1- S e p - 2 3 10 - S e p - 2 3 19 - S e p - 2 3 28 - S e p - 2 3 7- O c t - 2 3 16 - O c t - 2 3 25 - O c t - 2 3 3- N o v - 2 3 12 - N o v - 2 3 21 - N o v - 2 3 30 - N o v - 2 3 9- D e c - 2 3 18 - D e c - 2 3 27 - D e c - 2 3 Ra i n f a l l St r e a m S t a g e E l e v a t i o n ( f t ) Date Stony Fork Restoration Site Hydrograph T1-A Stream Flow Gauge Rainfall Stream Stage Elevation Stream Bed Elevation Sensor Depth Flow Elevation Stream Flow (Camera) 116 Days Camera obscured 139 Days 0.0 1.0 2.0 3.0 4.0 186 187 188 189 190 1- J a n - 2 3 10 - J a n - 2 3 19 - J a n - 2 3 28 - J a n - 2 3 6- F e b - 2 3 15 - F e b - 2 3 24 - F e b - 2 3 5- M a r - 2 3 14 - M a r - 2 3 23 - M a r - 2 3 1- A p r - 2 3 10 - A p r - 2 3 19 - A p r - 2 3 28 - A p r - 2 3 7- M a y - 2 3 16 - M a y - 2 3 25 - M a y - 2 3 3- J u n - 2 3 12 - J u n - 2 3 21 - J u n - 2 3 30 - J u n - 2 3 9- J u l - 2 3 18 - J u l - 2 3 27 - J u l - 2 3 5- A u g - 2 3 14 - A u g - 2 3 23 - A u g - 2 3 1- S e p - 2 3 10 - S e p - 2 3 19 - S e p - 2 3 28 - S e p - 2 3 7- O c t - 2 3 16 - O c t - 2 3 25 - O c t - 2 3 3- N o v - 2 3 12 - N o v - 2 3 21 - N o v - 2 3 30 - N o v - 2 3 9- D e c - 2 3 18 - D e c - 2 3 27 - D e c - 2 3 Ra i n f a l l ( i n ) St r e a m S t a g e E l e v a t i o n ( f t ) Date Stony Fork Restoration Site Hydrograph T2 Stream Flow Gauge Rainfall Stream Stage Elevation Stream Bed Elevation Flow Elevation Stream Flow (Camera)Sensor Depth 46 Days 70 Days Camera malfunction 85 Days 42 Days 0.0 1.0 2.0 3.0 4.0 204 205 206 207 208 209 210 1- J a n - 2 3 10 - J a n - 2 3 19 - J a n - 2 3 28 - J a n - 2 3 6- F e b - 2 3 15 - F e b - 2 3 24 - F e b - 2 3 5- M a r - 2 3 14 - M a r - 2 3 23 - M a r - 2 3 1- A p r - 2 3 10 - A p r - 2 3 19 - A p r - 2 3 28 - A p r - 2 3 7- M a y - 2 3 16 - M a y - 2 3 25 - M a y - 2 3 3- J u n - 2 3 12 - J u n - 2 3 21 - J u n - 2 3 30 - J u n - 2 3 9- J u l - 2 3 18 - J u l - 2 3 27 - J u l - 2 3 5- A u g - 2 3 14 - A u g - 2 3 23 - A u g - 2 3 1- S e p - 2 3 10 - S e p - 2 3 19 - S e p - 2 3 28 - S e p - 2 3 7- O c t - 2 3 16 - O c t - 2 3 25 - O c t - 2 3 3- N o v - 2 3 12 - N o v - 2 3 21 - N o v - 2 3 30 - N o v - 2 3 9- D e c - 2 3 18 - D e c - 2 3 27 - D e c - 2 3 Ra i n f a l l St r e a m S t a g e E l e v a t i o n ( f t ) Date Stony Fork Restoration Site Hydrograph T3 Stream Flow Gauge Rainfall Stream Stage Elevation Stream Bed Elevation Sensor Depth Flow Elevation Stream Flow (Camera) 157 Days Gauge malfunction Camera malfunction