Loading...
HomeMy WebLinkAbout20240318 Ver 1_High Point Stream Restoration AOI_20240221DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, WILMINGTON DISTRICT WILMINGTON REGULATORY OFFICE 69 DARLINGTON AVENUE WILMINGTON NORTH CAROLINA 28403 May 13, 2024 Regulatory Division SAW-2024-00403 Ms. Melinda King City of High Point 211 South Hamilton Street Suite 206 High Point, North Carolina 27261 Via Email: Melinda. king@highpointnc.gov Dear Ms. King: This letter is in response to the Pre -Construction Notification (PCN) you submitted to the Wilmington District, Raleigh on February 22, 2024, for a Department of the Army Nationwide permit (NWP) verification. This project has been assigned the file number SAW-2024-00403 and is known as Hamilton Avenue Stormwater Utility Upgrades. This file number should be referenced in all correspondence concerning this project. A review of the information provided indicates that the proposed work would include the discharge dredged/fill material in 640 linear feet (0.036 acre) of stream. This verification authorizes the permanent discharge of fill material into 448 linear feet (0.028 acre) stream channel and the temporary discharge of fill material into 192 linear feet (0.008 acre) of stream channel to facilitate the installation of larger stormwater pipes throughout the streets adjoining the stormwater outlet at Oakwood Cemetery and an upgrade of the culverts within the cemetery to facilitate the increase discharge. The project would also involve streambank stabilization on erosive streambanks at areas of critical infrastructure, and realignment of channel flow to reduce erosion potential in other areas of the project reach. The project area for this determination includes 14.32 acres which is illustrated on the enclosed site plans/maps, entitled Stream Restoration 0+00 TO 1+50, G-2 and Impact Sheets 1 through 4, dated November 2020, and Final Design, Sheets G-1, G-2, and C-1 through C-13, dated January 2024. The project/review area is located in the Boulding Branch (Hydrologic Unit Code: 030300030102) watershed, which is within the Cape Fear River basin; at 312 Qubein Avenue, at Latitude 35.966270 and Longitude-80.007760; in High Point, Guilford County, North Carolina. We have determined that the proposed work is authorized by NWP 3 and NWP 13 pursuant to authorities under Section 404 of the Clean Water Act (33 U.S.0 § 1344). The proposed work must be accomplished in strict accordance with the general permit conditions, any regional conditions, the special conditions listed in this letter, the application materials, and the enclosed plans. If the extent of the project area and/or nature of the authorized impacts to waters are modified, a revised PCN must be submitted to this office for written approval before work is initiated. Any violation of permit conditions or deviation from your submitted plans may subject the permittee to enforcement action. This verification is valid until March 14, 2026, unless prior to this date the subject NWP(s) is suspended, revoked, or is modified such that the activity no longer complies with the terms and conditions of this NWP. If you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP. Project Specific Special Conditions: Suitable habitat for tricolored bat (Perimyotis subflavus) may be present at the site. On September 14, 2022, the United States Fish and Wildlife Service (USFWS) published a proposal in the Federal Register to list the tricolored bat as endangered under the Endangered Species Act (ESA). The permittee understands and agrees that all work associated with the clearing and removal of trees and removal or modification of culverts must be completed prior to the effective date of the final listing of this species in the Federal Register. Work associated with the aforementioned activities not completed by the time must cease and the permittee must contact Laura Meyer of the Corps at (919) 634- 1595 or laura.j.meyer usace.army.mil to determine if additional coordination with the USFWS is required under Section 7 of the ESA prior to continuing work. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. This NWP verification does not preclude the necessity to obtain any other Federal, State, or local permits, licenses, and/or certifications, which may be required. If you have any questions related to this verification or have issues accessing documents referenced in this letter, please contact Laura Meyer, Regulatory Specialist of the Raleigh at (919) 634-1595, by mail at the above address, or by email at laura.j.meyer@usace.army. mi1. Sincerely, Z-a-a � ,� Laura J. Meyer Regulatory Specialist Enclosures Cc (w/enclosures) Jason Steele, Freese and Nichols, Inc. (via Jason.Steele@freese.com) Seren Homer, NCDWR (via seren.homer@deq.nc.gov) W J m L.� LLJ > U) O W LLJ W Q LC) -F- N U �CN 0 N O CN O r- z N cn Q -,, N O N Z .. . N N O > m E O Cn O Q O (n u — O Q I 0 co 0 �m 0 I > �0 cncn W n I U /N U 0_ C/� 0 CN _j Ln cn N ~ �6> E 0 Cn 0 QQ)co U - 0 Q L_ J INSTALL CONSTRUCTION SAFETY FENCE AROUND \d STA 0+07.21 PROJECT LIMITS, TYP BEGIN 3-TIER ROCK WALL SEE NOTE 5 AT END OF CULVERT HEADWALL \ WITH GEOBAG WALL SYSTEM V ABOVE AT 2:1 SLOPE. STABILIZE AND VEGETATE LIMITS OF DISTURBANCE (SEE SHEET C-3 AND C-5) i EXISTING FENCE a B4 PROPOSED STAGE Exempt / AND STOCKPILE AREA Present and Ongoing Activity / 915.51 sq ft LIMITS OF GRAVES PROPOSED hwWM / CONSTRUCTION EXISTING STORM IN ENTRANCE BY TOTHERS BE REM D l I v I �N SILT FENCE, TYP -,w` STA -0+91 N\ SD LINE 2 JUNCTION BOX 1 _ N=807795.74 --- ' E=1701622.26 - BY OTHERS PROPOSED DROP INLET - PROTECTION BY OTHERS EROSION CONTROL NOTES: STA 0+00.00 \ BEGIN CHANNEL REALIGNMENT S CULVERT OUTFALL ELEV. 888.0 -PROPOSED HEADWALL BY OTHERS �So C r Zo 0 ft) STA 0+00.00 PREFOR SC R / � uffer Zone ROTE TION (T P) / \�. Permanent 4\ �R' \ \ �Fill - Bould / �e�� � Basin & \ C\ Channel Realignme 23.5 Lf \ PROP 58.12 sq ft 4. S D LI BY OTHERS 1. CONTACT THE DEMLR WINSTON-SALEM REGIONAL OFFICE 336-776-9800 AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND DISTURBING ACTIVITY. 2. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED IN ACCORDANCE WITH NCDEMLR AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.50 INCHES OF RAIN PER 24-HOUR PERIOD. SELF -INSPECTION FORM CAN BE FOUND AT HTTP://DEQ.NC.GOV/ABOUT/DIVISIONS/ ENERGY-MINERAL-LAND-RESOURCES/EROSION-SEDIMENT-CONTROL/FORMS. 3. DESIGN COMPONENTS SHOWN ON PLANS MAY REQUIRE FIELD ADJUSTMENTS AT DIRECTION OF ENGINEER. 4. ALL DEBRIS REMOVED DURING TRENCH EXCAVATION IS TO BE IMMEDIATELY HAULED TO A PERMITTED OFF -SITE DISPOSAL LOCATION. 5. CITY OF HIGH POINT CONTACT PERSON RESPONSIBLE FOR MAINTENANCE: MELINDA KING 336-883-3217 B2 Exempt Present and Ongoing Activity 67.4 sq ft S2 Permanent Geobag Wall with Rock Toe 11.6 Lf 1 15.7 sq ft 0. SR ro i Dui_ • • N STA 1 +45.65 END 3-TIER ROCK WALL WITH GEOBAG WALL SYSTEM ABOVE PROTECT EXISTING SEWER S3 JTED RIPRAP Permanent 6 Fill - Grouted Riprap 40.1 Lf 175.95 sq ft 6.51 cu yd ING CHANNEL CENTERLINE Ilesod B3 Exempt SED Present and Ongoing Activity E 1 1509.73 sq ft E R S S6 Permanent Geobag Wall with Rock Toe 8.9 Lf 5.26 sq ft .04 cu yd • • • '�� LIMITS OF GRAVES Ad\ Permanent --- NCASE S5 ONCRETE Geobag Wall AT ROCK Permanent SING with Rock SEE NOT Geobag Wall 6.Toe Lf S4 with Rock Toe 52 q 2.52 sq ft STA 0+0 .65 BEGIN 2 TIER RO Permanent 77.1 Lf .97 R ROCK W 0.5 cu ft VE Fill -Bank Grading 110.28 sq ft 3.9 Lf 4.08 cu yd ALL SYSTEM ABOVE B1FALI 3.76 sq ft Exempt L 0.14 cu yd Present and Ongoing Activity E r 1065.0 sq ft 3 AND C - 5) EARTHFILL AS REQUIRED TO - MAINTAIN A MINIMUM 1' COVER \ PROPOSED 91 LF OF 6' X 4' BOX CULVERT @ 1.007 r� w a/ CC) Lj CC) 3 0o 0o 0 884 �U,�(,, o`000� U UOOZ(1JZ� Q M 00 m a/-=UcoWcoWco w w z q /-\ �00ED Z z z + u0 Q X Iw Li •, + 00JLi V� V CDo�_jZ� �o�o> 1 c0aLD�1na_Ma_z Q�c~i��»�>r~ -- zILIzZa-za- X 8 8 0 v) rQ - - ./ - %-/ -1+00 STA 0+00 ELEV= 888.00 BEGIN PROPOSED STREAM ALIGNMENT 0+00 NOTE: CONTRACTORS SHALL STAY WITHIN THE SPECIFIED LATERAL LIMITS AND SHALL NOT DISTURB GRAVES. APPROVED EQUIPMENT MATS SHALL BE USED TO PROTECT ff, ALL GRAVES WITHIN 10 FT OF EQUIPMENT. EXCAVATORS WITH TAIL SWING SHALL NOT BE ALLOWED DURING CONSTRUCTION. NOTES: 1. FINAL LOCATION OF CONSTRUCTED RIFFLES SHALL BE VERIFIED IN FIELD AND APPROVED BY ENGINEER OF RECORD. 2. STONE FOR ROCK TOE SHALL BE APPROVED BY CITY PRIOR TO INSTALLATION. 3. CONTRACTOR SHALL TEMPORARILY STOP WORK DURING BURIALS. CITY WILL PROVIDE 24-HOUR PRIOR NOTICE. 4. IF ANY CEMETERY PROPERTY IS DAMAGED, o CONTRACTOR SHALL REPLACE AT NO COST TO OWNER. + 5. CONTRACTOR SHALL COORDINATE WITH CEMETERY STAFF PRIOR TO INSTALLATION OF CONSTRUCTION SAFETY FENCE TO VERIFY LOCATION AND DEPTH OF N WOODEN STAKES. (OFFICE PHONE NUMBER: 336-883-3408) 6. INSTALL GROUTED RIPRAP TO PROTECT EXISTING SEWER PIPE. GROUTED RIPRAP SHALL EXTEND FROM v EDGE OF PIPE WEST TO PROPOSED ROCK WALL AND A MINIMUM OF 6 INCHES ON ALL SIDES OF PIPE. 7. ENCASE SEWER PIPE IN CONCRETE AT LOCATION WHERE IT RUNS UNDER PROPOSED ROCK WALL. CONCRETE SHALL BE MINIMUM 6 INCHES THICK ON ALL SIDES. EXTEND CONCRETE MINIMUM 1' PAST ROCK WALL BOTH SIDES. 8. REPLACEMENT OF STORMWATER PIPES IS PART OF A SEPARATE PROJECT. WORK WILL BE COORDINATED PRIOR TO CONSTRUCTION. 9. IF UNMARKED HUMAN SKELETAL REMAINS ARE ENCOUNTERED DURING CONSTRUCTION, THE PROVISIONS OF NORTH CAROLINA GENERAL STATUTE CHAPTER 70, ARTICLE 3 APPLY. CONSTRUCTION ACTIVITIES SHOULD IMMEDIATELY CEASE, AND THE COUNTY MEDICAL EXAMINER SHOULD BE CONTACTED. 900 PROPOSED HEADWALL BY OTHERS INV: 888.0 u. Q0 lq�_00 N 00 + Qw Ln W EXISTING GRADE AT \ PROPOSED CENTERLINE PREFORMED SCOUR PROTECTION PROPOSED GRADE EXISTING 48" PIPE PROPOSED 40 LF OF 6' X 4' BOX CULVERT @ 3.73% BY OTHERS INV: 884.48 EXISTING CHANNEL GRADE MATCH EXISTING GRADE WITH SHIFTED CHANNEL ALIGNMENT 1+00 • • • In Permanent Impact - Channel Realignment/Boulder Basin Permanent Impact - Fill and Bank Grading Permanent Impact - Rock Toe and Geobag Wall Permanent Impact - Fill (Grouted Riprap) Zone 1 Exempt Buffer Impact Zone 2 Exempt Buffer Impact UTa) o .� �0, U C Zw -0-0 0 0 4) .N (n& 2af 0 c 0 0 U 0 z CN N z N 0 \ �Z N O w �� o wo -� Oz z ~ `i�az0vi N o - w z Nwo 00 o U wOfMNo:5 �mz'Ln�,a Nw}o�� 0 =MOM c L_ w-wZ - o z 0 CJ w � � � 0 O 0C,�000 Z �of 0U no �aazt=m W% J� �O N 0 W= o4- V C° E o O U NW o0)� Cnz r N U U 3 D \-- - J I 1 3 ' c Zocu � N C� 0 w U O Ln + � r-I Uj z O 00 � z � Q O + Z O O. O O z U) J O = W Uj _U H Q LL O pC �z o UO Q 2i w LLJ I 0� DC z � c O ~ Q LLJ G Q � o co J co N m N O z a-Q o a0 = W 0 OW 0) o z z W y w U - U z co Q > W LL U U) w W 7 Q J 1 0 } m �o 0 c O - U 0 OC � 00-0 M o O 0 10' 20' 40' L (n co�- °0 Q SCALE IN FEET HORIZONTAL 0 0 2' 4' W c SCALE IN FEET w VERTICAL a o IMPACT SHEET 1 FINAL DESIGN SEQ. Plot Dote: 1 /31 /2024 4:14 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV-STREST-DT.dwg m 3 a U) > Z O Cr) J 0- �1>t �a_ I 0 U N � ~ C V 3 O i>t N _j0\ cn 3�: N �\ . N N > E U 0 cn QQ)(n U - O Q L_ J � STA 1 +89.73 OAKWOOD STA 6+61.18 BEGIN LAY BACK BANKS MEMORIAL STA 3+43.82 STA 5+30.98 END LAY BACK BANKS PROPOSED °°°° AT 2:1 SLOPE. INSTALL PARK END 1-TIER ROCK WALL BEGIN LAY BACK BANKS B11 SLOPE. INSTALL COIR MATTING AND PLANT AT 2:1 SLOPE. INSTALL _ SD LINE 1 BLEND TO EXISTING WITH GEOBAG WALL SYSTEM ,oh Exempt TTING AND PLANT BY OTHERS S10 O ABOVE AT 2:1 SLOPE COIR MATTING AND PLANT Q ' STA 5+40.06 Present and TO EXISTING (SEE SHEET B8 Permanent BLEND TO EXISTING Ongoing Activity O Exempt Fill -Riffle TRANSITION TO GRADING 55.35 sq ft EET - -5) p (SEE SHEET C-4 AND C-5) Q S17 STA 2 Present and 21.1 Lf BANKS AT 2:1 SLOPE p0 Permanent CTED S19 Buffer Zone Ongoing Activity S AT 142.77 sq ft 0� (SEE SHEET C-4 AND C-5) p v Temporary S9 66.18 s ft 7.93 cu d Fill -Riffle ss Grading - Coir B5 Permanent 1EM q 0 1 y S11 v v 20.5 Lf E 1 Matting Exempt Fill - Riffle K BAG WALL Permanent B10 132.97 sq ft ss 123 Lf Present and 20.4 Lf ABO EAT 2:1 SLOPE. Geobag Wall with GRADE BANKS AT Exempt 7.39 cu yd STA 6+23.45 152.23 sq Present and �BEG 2n� Ongoing Activity 78.79 sq ft ILIZE A VEGETATE Rock Toe ILIZE WITH C Ongoing Activity b1b2.60 sq ft 4.38 cu yd SHEETIC-4 AND C-5 165 q gg 63.55 sq ft �0 Temporary •�S • N TRUCTEDf ) 12.65 sq ftdi PLANT VEGE y S ss ss -ass 0.23 cu yd Exempt Grading - Coir RIFFL .` _ Present and SHEET C - 4 S Matting "�• k- C Ongoing Activity 29.7 Lf TE 1 } - 169.07 sq ft 32.61 sa ft k �k / Permanent Fill - Boulder Basin 14.0 Lf 70.6 sq ft ST 3.92 cu yd �•� P OUR PROTECTION (TYP) Buffer Zone 2 (20 ft) INSTALL CONSTRUCTION SAFETY FENCE AROUND PROJECT LIMITS, TYP SEE NOTE 5 O We 0 NOTE: CONTRACTORS SHALL STAY U WITHIN THE SPECIFIED LATERAL LIMITS AND SHALL NOT DISTURB GRAVES. APPROVED MATS OR PLYWOOD SHALL BE USED TO PROTECT ALL GRAVES WITHIN 10 FT 0 OF EQUIPMENT. EXCAVATORS WITH zw TAIL SWING SHALL NOT BE ALLOWED DURING CONSTRUCTION. 7 0 � O U s5 5 - SS S9-)IO3S 55 - 55' 000, o i� z f•••••.H••••••••••••• ••••••••••••••• \ X B6 Exempt Present and Ongoing Activity 3.60 sq ft s5 �� / , �9 �' SCALE IN FEET '.. �, CHANNEL ALIGNMEN -- HORIZONTAL - WITH FLOODPLAIN ENCH � _ �_-� -- � 0 2' 4' --BLEN s13 ING �-__- - - _ ,- �' / - '-'-` (SEE Permanent A D C-5) �- -� r i SCALE IN FEET - gg9 Excavation - / / -= / � ao a 2 Permanent VERTICAL 32 Lf --__ - - 30.2 sq ft i � S16 S18 Temporary S20 Permanent Geobag E _ Temporary p rY rading - Coir Fill - Riffle all with Rock Toe ---_ Grading - Coir ._,,_,_, Matting g 20.9 Lf FINAL 11.4 Lf OF CONSTRUCTED RIFFLES SHALL BE �' ��' /' /' ` ' •�• Matting 9.7 Lf 14.96 sq ft 107.34 s ft 5.96 cu yd VERIFIE q AND APPROVED BY ENGINEER OF / / "� •�' 28.5 Lf 825s ft STA 6+42 52 0.96 cu d RECOR y .39.92%'�� q BEGIN 1 -TIER ROCK WALL EM BEGIN PROPOSED CHANNEL ALIGNMENT WITH FLOODPLAIN BENCH STA 3+40.13 BEGIN 1 -TIER ROCK WALL WITH GEOBAG WALL SYSTEM ABOVE AT 2:1 SLOPE STABILIZE AND VEGETATE (SEE SHEET C-4 AND C-5) Nr B7 Exempt EXI Present and Ongoing Activity C E 222.02 sq ft LIMITS OF DISTURBANCE ET E 7A ' B12 Exempt S12 Present and Permanent Ongoing Activity MINIMUM Grading and 5.76 sq ft OF BANK Geobag Wall with PAVEMENT Rock Toe 76 Lf 198.72 sq ft 20.24 cu yd STA 5+ I J.55 s14 BEGIN LAY BACK BANKS STA 6+57.48 Permanent AT 2:1 SLOPE. INSTALL END 1-TIER ROCK WALL and Geobag Wall \ Fill -Rock Toe COIR MATTING AND PLANT WITH BANKS LAID BACK •�• 43.2 Lf BLEND TO EXISTING ABOVE AT 2:1 SLOPE 56.45 sq ft (SEE SHEET C-4 AND C-5) BLEND TO EXISTING 5.74 cu yd (SEE SHEET C-4 AND C-5) STA 4+77.06 END 1-TIER ROCK WALL WITH GEOBAG WALL SYSTEM ABOVE AT 2:1 SLOPE STABILIZE AND VEGETATE (SEE SHEET C-4 AND C-5) Permanent Impact - Channel Realignment Temporary Impact - Grading Permanent Impact - Fill and Bank Grading Permanent Impact - Rock Toe and Geobag Wall Permanent Impact - Fill (Grouted Riprap) Zone 1 Exempt Buffer Impact Zone 2 Exempt Buffer Impact XISTINO 48" PIPE Excavation 888 PROPOSED 40 LF OF 6' X 4' BOX CULVERT @ 3,73% BY OTHERS EXISTING GRADE AT CONSTRUCTED RIFFLE 884 PROPOSED CENTERLINE 884 \ CONSTRUCTED RIFFLE I N V: 883.00 880 880 \ CONSTRUCTED RIFFLE CONSTRUCTED RIFFLE PREFORMED SCOUR w - PROTECTION PROPOSED Z w -- 876 GRADE �_ EXISTING CHANNEL GRADE. Z _ 876 J MATCH EXISTING GRADE WITH - o SHIFTED CHANNEL ALIGNMENT a w CIO r- \\ LriLn LnO O�V0 LQ'L LL + ' ` w Z QWZ Cnww �Jw Ln Lj_j M1 872 872 (V CD (V 0 w N O D w Q� CD L � __ 0 VI " - C) Z ' 0 0 o ww �� U J Of If Cn 'COD o Izmomw LL.Z-�Z M�oao Do Z�� U w � O O O N f o o 0 ch Z N0- OU _o F-0-<M WU 4 �O N O W= -` o� W o� V Url- (° E ID° y' NW o0)� Cz r N O 3 D � 3 - z 0 C 0 W U Q o z ^J^ L.� W W Op z 0 0� - O z I- Q Ln + p z N 0./ 02 p z ���J O = W w� U LL J O � �z O Q W W O Q I- J W 2 ~ N -'t 2 0 op > O J M N m N Z Q zz = w O LLJ O z z o Y on ul (D 3 LO U z H Cn Q > LLJ LL U Z Q J W a_ W Q LU LL 0 } m - c MO i C M m oo(/) U O_0 _C:M O 0)O •§ T) L (n . ryM W J Q U w Cl) Cn LPL O z W > o 1+50 2+00 3+00 4+00 5+00 6+00 6+80 IMPACT SHEET 2 FINAL DESIGN SEQ. Plot Dote: 1 /31 /2024 4:1 7 PM Plot By: 03807 Filencme: N:\SW\Drowings\OHWM PLANS.dwg Al 01 3 �m cn X I > 0 cncf) W cn n I > U p /N a (71- C/� 20 . p N J D Ln cn N ~ E U cn 0 QQ)co U — O Q L_ J [ = EXCAVATION BELOW OHWM [ = FILL BELOW OHWM GRADED SLOPE ABOVE CULVERT HEADWALL BY OTHERS 912 PROP GROUND - 908 904____ 900 896 EX CULVERT TO 892 BE REMOVED BY OTHERS 888 EX SEWER TO - REMAIN IN SERVICE 884 -40 -20 912 908 904 900 896 892 888 884 880 d ►. I IA AIT /lr 3-TIER STACKED ROCK WALL GROUTED RIPRAP AROUND SEWER PIPE SEE NOTE 5 EX GROUND 912 LIMIT OF 908 DISTURBANCE 0 STA 0+00 904 900 - 896 PROP 6'(H) x 41(V) CULVERT BY OTHERS 392 EE1tEOHWM - 888 BOULDER BASIN 40 884 AT CULVERT OUTFALL GRADE BACK BOTH BANKS AT MAX 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE ABOVE -40 -20 0 20 40 STA 0 + 1 2 PROP GROUND 908 - - 904 — 900 896 892 888 LIMIT OF GRAVESTONES / LIMIT OF - DISTURBANCE GROUTED RIPRAP 884 AROUND SEWER PIPE SEE NOTE 5 880 -40 -20 912 908 904 900 LIMIT OF GRAVESTONES / 896 LIMIT OF DISTURBANCE 892 888 GROUTED RIPRAP 884 AROUND SEWER PIPE SEE NOTE 5 880 GRADE BACK BOTH BANKS AT MAX 2:1 SLOPE AND PLACE 4 LIFTS 912 908 904 900 896 892 888 884 880 CONSTRUCTED GEOBAG WALL SYSTEM 912 ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE ABOVE 908 GEOBAG WALL (TYP) EX GROUND 904 /7777:: 3-TIER STACKED — ROCK WALL 900 — T — ----- — 896 LIMIT OF 892 25-YR ELEV. DISTURBANCE OHWM rp$W 9 _11 i 888 2-TIER STACKED 884 ROCK WALL 0 20 40 880 STA 0+25 GRADE BACK BOTH BANKS AT MAX 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE ABOVE GEOBAG WALL (TYP) 3-TIER STACKED EX GROUND )ff I ROCK WALL PROP GROUND _ -40 -20 0 STA 0+38 Plot Dote: 1 /25/2024 1 :37 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV-STREST-XS.dwg 25-YR ELEV. OHWM 2-TIER STACKED ROCK WALL 20 912 908 904 900 896 LIMIT OF 892 DISTURBANCE 888 884 40 880 908 904 900 896 892 888 884 880 GRADE BACK BOTH BANKS AT 2:1 NOTE: CONTRACTORS SHALL STAY SLOPE AND PLACE 4 LIFTS WITHIN THE SPECIFIED LATERAL CONSTRUCTED GEOBAG WALL SYSTEM LIMITS AND SHALL NOT DISTURB ABOVE STACKED ROCK WALL. PLACE GRAVES. APPROVED MATS OR -40 SEE NOTE 6 0 STA 0+50 LIMIT OF GRAVESTONES / GRADE BACK BOTH BANKS AT 2:1 LIMIT OF SLOPE AND PLACE 4 LIFTS DISTURBANCE CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE 90810' MIN COIR MAT AND VEGETATE SLOPE ABOVE GEOBAG WALL (TYP) 904 900 EX GROUND 896 — PROP GROUND 892 888 3-TIER STACKED ROCK WALL 884 880 -40 -20 LIMIT OF DISTURBANCE 908 904 900 — EX GROUND 896 PROP GROUND 892 888 3-TIER STACKED 884 I ROCK WALL 880 -40 -20 901 89_ 892 888 884 880 -40 -20 0 STA 0+75 SLOPE 908 PLYWOOD SHALL BE USED TO �P) 904 PROTECT ALL GRAVES WITHIN 10 FT EX GROUND OF EQUIPMENT. EXCAVATORS WITH - _ 900 TAIL SWING SHALL NOT BE ALLOWED DURING CONSTRUCTION. 896 LIMIT OF 25-YR ELEV. - DISTURBANCE 892 OHWM 888 2-TIER STACKED ROCK WALL 884 I 880 NOTES: 20 40 908 904 LIMIT OF 900 DISTURBANCE 896 892 � 25-YR ELEV. OHWM - - 888 2-TIER STACKED ROCK WALL 884 20 40 880 GRADE BACK BOTH BANKS AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED 908 ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE ABOVE GEOBAG WALL (TYP) 904 0 STA 1 +00 EX GROUND 900 LIMIT OF DISTURBANCE 896 892 25-YR ELEV. � OHWM 888 2-TIER STACKED ROCK WALL 884 20 40 880 GRADE BACK BOTH BANKS AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE I I Let 1111 `'L.. M 0 STA 1 +25 20 '1 011111111111111111 89_ 892 - 888 884 880 -40 -20 0 STA 1 + 44 20 40 896 892 888 884 880 LIMIT OF 900 DISTURBANCE 896 EX GROUND 1892 'LEV. OHWM 888 TACKED 884 _L 40 880 1. ALL GRADED SLOPES SHALL BE LINED WITH COIR MATTING PER THE DETAIL. 2. ALL STACKED ROCK WALL WILL BE BLENDED TO EXISTING GROUND AT TOP OF ROCK TO LIMIT EROSION AT TOP OF WALL. 3. PLACE SINGLE COIR WRAPPED LIFT ABOVE STACKED ROCK WALL AS REQUIRED 4. GEOBAGS WILL BE BUILT IN A MANNER THAT BLENDS WITH EXISTING BACKSLOPE. A MINIMUM OF 4 LIFTS (-2 FT ABOVE STONE) AT -2:1 (H:V) SLOPE SHALL BE USED UNLESS OTHERWISE SPECIFIED ON PLANS. LIFTS CAN BE PLACED AS STEEP AS 1.5:1 (H:V). MORE BAG LAYERS MAY BE USED AT DIRECTION OF ENGINEER. 5. GROUT RIPRAP BETWEEN STACKED ROCK WALL AND EXISTING SEWER PIPE TO PROTECT PIPE. EXTEND GROUTED RIPRAP ABOVE AND ON SOUTH SIDE OF PIPE FOR MINIMUM OF 6 INCHES. 6. ENCASE SEWER PIPE IN CONCRETE AT LOCATION WHERE IT RUNS UNDER ROCK WALL. CONCRETE SHALL BE MINIMUM 6 INCHES THICK ON BOTH SIDES AND ABOVE PIPE. EXTEND CONCRETE MINIMUM 1' PAST ROCK WALL BOTH SIDES. U c zw -0-0 c T O �af 0 c 0 0 U O Z N Z o N 0 \ CD Z w N O 1121 -�azo N o Y O" w Z N ! p -0 NO 0 a > L� a wwcy U J K M N ,:::) c=�ziNa In ~ cn c 0 �Zmo ;� L'_ w-�Z �L�0< DO Z U W _ = 5 O 0 o Lu Z Lf)0-= 0 �a-< Fn WU J �O N 0 W= ��t W o� V U� 1E y O U ors MEW aW cn Z r N 3 -1 J I 3 ' c0 Z U N c:� 0 - a In � � uj U Q J O Lr) w z + 00 Z Q 0 z� 0 + a2 � D Cn J O Vi Lij =wwu � z o� O 00 Q W w 0.N/ z (/') 0 O J U Q co CDc J coN co N o z a Q o m = W uW 0) o z z W y w U 3: c U z coQ > w c/) o6 o H w W Lu 7 ~ a o z (n J > � U } m _F0o �U 6 o-� oou, U O1 c: c: O Ln L (n M 0 10 20' °0 w_ Q SCALE IN FEET U W Cn 0 z w > o IMPACT SHEET 3 FINAL DESIGN SEQ. �m X I > O cncn W m U)� In U N min U �t a� C/� o _�� �iLn cn N ~ N Z 6 Q) > m�cn 0 QQ)co U — O Q L_ J = EXCAVATION BELOW OHWM = FILL BELOW OHWM 900 896 892 888 884 880 876 More —40 —20 0 20 40 STA 2+00 896 EDGE OF PROP 892 PAVEMENT GROUND 896 892 EDGE OF PAVEMENT 888 884 EX GROUND 880 — 876 —40 1 -TIER STACKED ROCK WALL -20 896 GRADE BANK AT 2:1 SLOPE. PLACE 892 COIR FIBER MAT AND VEGETATE 888 (TYP) 884 880 EDGE OF EX GROUND - PAVEMENT 876 PROP GROUND 872'-40 —20 EDGE OF GRADE BANK AT 2:1 PAVEMENT SLOPE. PLACE COIR FIBER MAT AND 892 - VEGETATE. BLEND TO EXISTING 888 884 — — — -- --- --- EX GROUND 880— 876 GRADE FLOODPLAIN BENCH AT 15:1 SLOPE. 872 PLACE COIR FIBER MAT AND VEGETATE 868'-40 —20 GRADE BANK AT 2:1 SLOPE. PLACE COIR FIBER MAT AND VEGETATE (TYP) ------ 25-YR ELEV. OHWM EDGE OF PAVEMENT 17 - 0 20 40 STA 2+50 GRADE BACK BANK AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK 0 STA 3+00 0 STA 3+50 PROP GROUND 0 STA 4+00 20 40 GRADE BACK BANK AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE ABOVE GEOBAG WALL (TYP) t��__EDGE OF 25-YR ELEV. PAVEMENT � OHWM -1 -TIER STACKED -ROCK WALL 20 40 GRADE BACK BANK AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE ABOVE GEOBAG WALL (TYP) —� EDGE OF PAVEMENT 25-YR ELEV. OHWM 1 -TIER STACKED ROCK WALL 20 40 900 896 892 888 884 880 876 900 896 892 888 884 880 876 896 892 888 884 880 876 896 892 888 884 880 876 872 892 888 884 880 876 872 868 EDGE OF PAVEMENT GRADE BANK AT 2:1 SLOPE. PLACE COIR FIBER MAT AND 892 VEGETATE. BLEND TO EXISTING 888 884- 880 EX GROUND 876 GRADE FLOODPLAIN BENCH AT 15:1 SLOPE. 872 PLACE COIR FIBER MAT AND VEGETATE 868'-40 —20 GRADE BANK AT 2:1 SLOPE. PLACE COIR 892 FIBER MAT AND VEGETATE. BLEND 888 EDGE TO EXISTING PAVEMENT 884 ---- 25-YR ELEV. 880 876 GRADE FLOODPLAIN r7 BENCH AT 15:1 SLOPE. 872 PLACE COIR FIBER MAT AND VEGETATE 888 884 880 EDGE OF EX GROUND 876 PAVEMENT PROP GROUND 872 —40 —20 EDGE OF PAVEMENT 888If 884 880 25-YR ELEV. � 876 872 —40 EDGE OF PAVEMENT 888 E 884 *ROU 88o 25-YR ELEV------- 876 GRADE BANK AT PLACE COIR FIBE 872 VEGE 868 —40 EX GROUP PROF GROUNC —20 GRADE BACK BANK AT 2:1 SLOPE AND PLACE CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. EXTEND GEOBAG LIFTS TO DAYLIGHT SLOPE. EDGE OF PAVEMENT 25-YR ELEV. , PROP 1 -TIER STA GROUND ROCK WALL 0 20 40 STA 4+50 PROP - GROUND 0 STA 5+00 GRADE BACK BANK AT 2:1 SLOPE AND PLACE CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. EXTEND GEOBAG LIFTS TO DAYLIGHT SLOPE. - - OHWM 1 -TIER STACKED ROCK WALL 20 GRADE BANK AT 2:1 SLOPE. PLACE COIR FIBER MAT AND VEGETATE (TYP) NOTE: CONTRACTORS SHALL STAY WITHIN THE SPECIFIED LATERAL LIMITS AND SHALL NOT DISTURB GRAVES. APPROVED MATS OR PLYWOOD SHALL BE USED TO PROTECT ALL GRAVES WITHIN 10 FT OF EQUIPMENT. EXCAVATORS WITH TAIL SWING SHALL NOT BE 892 ALLOWED DURING CONSTRUCTION. 888 884 880 NOTES: 876 1. ALL GRADED SLOPES SHALL 872 BE LINED WITH COIR MATTING PER THE DETAIL. 868 2. ALL STACKED ROCK WALL :•, - � 880 EX GROUND 876 40 872 888 EDGE OF PAVEMENT 884 25-YR ELEV. OHWM 880 INSTALL 876 CONSTRUCTED RIFFLE 0 20 40 872 STA 5+50 GRADE BANK AT 2:1 SLOPE. PLACE COIR FIBER KAAT Alvin \/F(;FTATF (TYP) JD EDGE OF PAVEMENT OHWM - 0 20 STA 6+00 F1 -TIER STACKED ROCK WALL AND GRADE BANK AT 2:1 40 M ■ ��� —20 0 STA 6+50 20 40 888 884 880 876 872 888 884 880 876 872 868 WILL BE BLENDED TO EXISTING GROUND AT TOP OF ROCK TO LIMIT EROSION AT TOP OF WALL. 3. PLACE SINGLE COIR WRAPPED LIFT ABOVE STACKED ROCK WALL AS REQUIRED 4. GEOBAGS WILL BE BUILT IN A MANNER THAT BLENDS WITH EXISTING BACKSLOPE. A MINIMUM OF 6 LIFTS (-3 FT ABOVE STONE) AT -2:1 (H:V) SLOPE UNLESS OTHERWISE SPECIFIED ON PLANS. LIFTS CAN BE PLACED AS STEEP AS 1.5:1 (H:V). MORE BAG LAYERS MAY BE USED AT DIRECTION OF ENGINEER. U c zw -0-0 c T 0 a) .N N 0 0 0 U t 0 z N z N O w N O _� M R w � �o-iA oz z ZON N o Yo w U z Nwo 00 O nL U w i �a N�}oz� O Z m m L_ z0oo amo Q OLj,- O cn �00 ��ZILI coow�0 �aaz�m W� J �O N 0 W= 0� W_ o� V U� C° y 0 c)U o�� aW MEW cn Z r N -c J I 13 ■ 00 Z U N c:� 0 W U Q 0— 0 W OD z W O z z� Q O p + J �N/j V / =wwu z of 0 k- z 00 Q W W z� p 0 J U Q co o J co N m N o z a- Q o m= w o U z z w y w U U- U x U) w w Lu ~ a o z cn U } m _F0o 0_0 O 0 o}' U) U O-0 c: c: a) O cm 0) L (n 0 10 2 0' °0 w� Q SCALE IN FEET U w cn c 0 z w > o IMPACT SHEET 4 FINAL DESIGN SEQ. Plot Dote: 1 /25/2024 4:33 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV—STREST—XS.dwg STANDARDS AND SPECIFICATIONS 11 1. BASEMAP INFORMATION IS FROM A TOPOGRAPHIC SURVEY PERFORMED BY STEWART, DATED NOVEMVER 11, 2018. ALL COORDINATES ARE BASED ON NAD83 AND REALIZATION (2011) AND ALL ELEVATIONS ARE BASED ON NAVD 88. 2. LOCATIONS, ELEVATIONS, DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE DRAWINGS, HOWEVER ARE NOT PURPORTED TO BE ABSOLUTELY CORRECT. THE CONTRACTOR SHALL VERIFY LOCATIONS, ELEVATIONS, DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES AFFECTING THE WORK PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO UTILITIES. 3. IN THE ABSENCE OF DETAILS OR SPECIFICATIONS IN THESE CONTRACT DOCUMENTS APPLICABLE DESIGN AND DETAILS SHALL CONFORM TO GENERAL CONTRACT DOCUMENTS AND SPECIFICATIONS FOR THE CITY OF HIGH POINT. 4. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). 5. BRACE UTILITY POLES AS REQUIRED TO MAINTAIN STABILITY OF THE POLES DURING CONSTRUCTION SUBSIDIARY TO WORK. 6. THE WORK SHALL MEET NCDEQ'S MINIMUM REQUIREMENTS PRESCRIBED IN TITLE 15A, SUB -CHAPTER 18C-WATER, TITLE 15A, SUB -CHAPTER 02T-WASTE NOT DISCHARGED TO SURFACE WATER, AND STORMWATER SUPPLIES. 7. CONTACT THE NORTH CAROLINA ONE -CALL CENTER AT 1-800-632-4949 A MINIMUM OF THREE DAYS AND A MAXIMUM OF 10 DAYS BEFORE ANY EXCAVATION WORK IS CONDUCTED ASSOCIATED WITH THIS PROJECT SO AS TO AVOID UTILITY DAMAGE. 8. EXISTING IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO FENCES, DRIVEWAYS, SIDEWALKS, TRAFFIC SIGNS, MAIL BOXES PAVEMENT, CURBS, UTILITY PIPELINES, AND DRAINAGE STRUCTURES WHICH ARE DAMAGED, REMOVED OR ALTERED TO PERMIT INSTALLATION OF THE WORK SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR, AT THE CONTRACTOR'S EXPENSE, IN THE SAME LOCATION AND IN CONDITION AS GOOD OR BETTER THAN THEY WERE FOUND. EROSION CONTROL NOTES: 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE (NCDEQ) AND LOCAL REQUIREMENTS. 2. CONTACT THE DEMLR WINSTON-SALEM REGIONAL OFFICE, 336-776-9800, AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND DISTURBING ACTIVITY. 3. THE INSPECTION AND MAINTENANCE OF THE EROSION PREVENTION MEASURES SHALL BE THE CONTRACTOR'S RESPONSIBILITY THROUGHOUT ALL PHASES OF CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH THE NCDEQ REGULATIONS CONCERNING EROSION AND SEDIMENT CONTROL. 4. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED IN ACCORDANCE WITH NCDEMLR AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.50 INCHES OF RAIN PER 24-HOUR PERIOD. SELF -INSPECTION FORM CAN BE FOUND AT HTTP:/DEO.NC.GOV/ABOUT/DIVISIONS/ENERGY- MINERAL- LAND- RESOURCES/EROSION -SEDIMENT-CONTROL/FORMS. REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. 5. DESIGN COMPONENTS SHOWN ON PLANS MAY REQUIRE FIELD ADJUSTMENTS AT DIRECTION OF ENGINEER. 6. ERODED DITCHES/BANKS SHALL BE REPAIRED WITH A SUITABLE MATTING PER DETAIL. 7. CONTRACTOR TO USE A LAYDOWN/STAGING AREA AS SHOWN ON THE PLANS. IF ADDITIONAL AREAS ARE REQUIRED, CONTRACTOR IS RESPONSIBLE FOR ACQUIRING THIS AREA AND PROVIDING THE REQUIRED EROSION CONTROL MEASURES. 8. TOTAL ACREAGE DISTURBED EQUALS APPROXIMATELY 1.3 ACRES. 9. CONTRACTOR SHALL INSTALL AND UTILIZE TEMPORARY CONSTRUCTION ENTRANCES PER DETAIL FOR ALL OFF -PAVEMENT ACCESS. 0 U N Z N 0 N O v =~ w .Q� -owo� oZ Z (A o�Yo U Z O wa> �a w c-) w�� N o �Zmomw LL_ Z-�z 0- 0 U W Z U 0 0 cf.) ��Z �ca�cno �aaz�m WIIA J mO N O W = o� W or- V Ur- CO 0 ID zC_ O 0)N (3NV C/) Z r N -tf -3 J I Cc: Z O N 0 0 cn a 10. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES AND DEVICES BEFORE LAND DISTURBING ACTIVITIES COMMENCE. 9. THE CONTRACTOR SHALL REMOVE FROM THE PROJECT AREA ALL SURPLUS MATERIAL. THIS SHALL BE INCIDENTAL AND NOT A SEPARATE PAY ITEM. SURPLUS MATERIALS FROM EXCAVATION INCLUDING DIRT, TRASH, ETC. SHALL BE PROPERLY 11. STANDARD SEDIMENT CONTROL DEVICES ARE TO BE FURNISHED, INSTALLED, AND MAINTAINED IN GOOD WORKING ORDER AT STORM LiJ DISPOSED OF AT AN ACCEPTABLE SITE. IF THE CONTRACTOR PLACES EXCESS MATERIAL IN THE AREAS WITHOUT INLETS AS SHOWN ON THE PLANS AND AT THE DISCRETION OF THE ENGINEER TO ENSURE PROJECT SEDIMENT IS PROPERLY U PERMISSION, CONTRACTOR WILL BE RESPONSIBLE FOR ALL DAMAGE RESULTING FROM SUCH FILL AND CONTRACTOR SHALL CONTROLLED WITHIN THE PROJECT LIMITS. REMOVE MATERIAL AT ITS OWN COST. J 12. CITY OF HIGH POINT CONTACT PERSON RESPONSIBLE FOR MAINTENANCE: MELINDA KING, 336-883-3215. 10. THE DESIGN, INSPECTION AND MAINTENANCE OF THE EROSION PREVENTION MEASURES SHALL BE THE CONTRACTOR'S RESPONSIBILITY THROUGHOUT ALL PHASES OF CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO w Z COMPLY WITH THE NCDEQ REGULATIONS CONCERNING EROSION AND SEDIMENT CONTROL. 0 O 11. CONTRACTOR SHALL MAINTAIN SUITABLE CONSTRUCTION ACCESS FOR THE ENGINEER AND CITY OF HIGH POINT STAFF AT Z Z ALL TIMES DURING CONSTRUCTION. O Q LLJ z � � 12. CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ALL EXISTING UTILITIES IN SERVICE DURING CONSTRUCTION, O 0 Z 13. CONTRACTOR SHALL PROVIDE CLOSURE PIECES FOR PIPELINE AS REQUIRED TO CONSTRUCT THE PROJECT, INCLUDING = THOSE REQUIRED FOR SPECIAL CONSTRUCTION PROCEDURES REQUIRED TO COORDINATE OWNER'S CHANGES TO THE LD w CI) J > J SEQUENCE OF CONSTRUCTION. ALL CLOSURE PIECES SHALL BE CONSIDERED A SUBSIDIARY COST TO THE PROJECT AND u w u < WILL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. J 0 _ LLJ 14. THE CONTRACTOR SHALL VIDEO ALL IMPACTED PROPERTY WITHIN THE CONSTRUCTION LIMITS PRIOR TO WORK. VIDEOS �-- Z Z SHALL INCLUDE DATE NOTATION AND AUDIO IDENTIFICATION OF PROPERTY ADDRESS AND MAIN/LATERAL NAME. THIS PRE 00 Q Lv CONSTRUCTION VIDEO TAPING OF IMPACTED PROPERTIES SHALL BE CONSIDERED SUBSIDIARY WORK. LLI 0 i 15. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS AND SIDEWALKS ADJACENT TO PROJECT FREE OF MUD AND Z DEBRIS FROM THE CONSTRUCTION. O co I- J Q TRAFFIC CONTROL NOTES: _ 1. THE CONTRACTOR SHALL PROVIDE ADEQUATE WARNING SIGNS, LIGHTS, BARRIERS, RAILING, FLAGGERS, ETC., AND SHALL CONDUCT ALL WORK IN ACCORDANCE WITH THE LATEST VERSION OF THE NCDOT "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES," NCDOT "ROADWAY STANDARD DRAWINGS MANUAL," MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND THE NCDOT SUPPLEMENT TO THE MUTCD (NCSMUTCD). THE CONTRACTOR SHALL POSSESS ONE COPY OF EACH OF THE ABOVE REFERENCED PUBLICATIONS. ANY m m CONFLICTS FOUND BETWEEN THE NCSMUTCD AND THE MUTCD SHALL BE RESOLVED IN FAVOR OF THE MUTCD. � N o z d Q °ui ° 2. THE CONTRACTOR SHALL CONDUCT OPERATIONS SO AS TO MAINTAIN AND PROTECT ACCESS FOR VEHICULAR AND PEDESTRIAN TRAFFIC, o TO AND FROM ALL PROPERTIES AFFECTED BY OPERATIONS. o6 W Q w of w H W 3. UNLESS OTHERWISE REQUIRED, MATERIALS USED IN THE FABRICATION AND INSTALLATION OF CONSTRUCTION TRAFFIC CONTROL DEVICES b z W SHALL BE IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF THE MUTCD. WHEN TRAFFIC CONTROL DEVICES ARE NO LONGER o J z Q REQUIRED FOR TRAFFIC HANDLING IN THE INITIAL PHASE OF CONSTRUCTION REQUIRING THEIR USE, THEY MAY BE REUSED AT VARIOUS LOCATIONS THROUGHOUT THE PROJECT PROVIDED THE DEVICE IS NOT DEFACED, IS STRUCTURALLY SOUND, CLEAN, AND OTHERWISE m o J CONFORMS TO THE ABOVE REQUIREMENTS. J Q z 4. ALL WORK ASSOCIATED WITH THE FURNISHING, INSTALLING, AND REMOVING OF PAVEMENT MARKINGS AND PAVEMENT MARKERS SHALL o BE PERFORMED IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS AND THE LATEST PUBLICATION OF THE NORTH CAROLINA w DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES." AND "ROADWAY STANDARD DRAWINGS." ° m PERMANENT PAVEMENT MARKING SHALL BE ALKYD/MALEIC THERMOPLASTIC. °'L O ­ U O cn > 5. CONTRACTOR SHALL INSTALL AND MAINTAIN TRAFFIC CONTROL PLAN. CONTRACTOR SHALL MAINTAIN ONE (1) LANE OF TRAFFIC AT ° w ALL TIMES DURING CONSTRUCTION, UNLESS AUTHORIZED BY THE CITY OF HIGH POINT WITH PROPER ADVANCED NOTICE. FOR ° w TEMPORARY ROAD CLOSURE, ALL TRAFFIC CONTROL MEASURES AND PROCEDURES SHALL IMPLEMENT PROPER SAFEGUARDS. ALL C -a `n BARRICADES, WARNING SIGNS, LIGHT DEVICES, ETC., FOR THE GUIDANCE AND PROTECTION OF TRAFFIC AND PEDESTRIANS, MUST °.� Q CONFORM TO THE NCDOT MANTENANCE/UTILITY TRAFFIC CONTROL GUIDELINES. W cn 6. CONTRACTOR TO ENSURE THAT ACCESS IS MAINTAINED TO ALL ACTIVE BUSINESSES DURING BUSINESS HOURS WHILE CONSTRUCTION IS w r N UNDERWAY. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH AFFECTED BUSINESS OWNERS. W W ZZ \ Ln ccnn >_ (V Q \ cn W p >o (mil Z .. 0 SHEET E N 0 ��cn G-1 0 Q FINAL DESIGN SEQ. Plot Date: 1 /25/2024 1 :34 PM Plot By: 03807 Filename: N:\STANDARD\STREAM SHEET SET FILES\GN-ALL- NOTE- 1 .dwg 0) a I 0 Z CD J I J J Q I � Z O CD 00 / rq U) O W J m W � U) > O W LLJ Cf) 75 n Q W U � N cf) 0 (f) ry O � O\ Z Ln cn Q N N �\ N Z .. . N cn N O > O O Q O (n u — O Q L� J rl- 00 0 �m p > cf)� W U� m U /N U'v C v) 0 O � p N �Ln N ~ CN N Z .. a� a� > E U 0 cn QQ)cn u — O Q L7 J INSTALL CONSTRUCTION SAFETY FENCE AROUND \d STA 0+07.21 PROJECT LIMITS, TYP BEGIN 3-TIER ROCK WALL SEE NOTE 5 AT END OF CULVERT HEADWALL \ WITH GEOBAG WALL SYSTEM V ABOVE AT 2:1 SLOPE. STABILIZE AND VEGETATE LIMITS OF DISTURBANCE (SEE SHEET C-3 AND C-5) , EXISTING FENCE PROPOSED STAGE AND STOCKPILE AREA PROPOSED / CONSTRUCTION / ENTRANCE EXISTING STORM DRAIN / OUTFALL TO BE REMOVED BY OTHERS SILT FENCE, TYP C�f wv \\ / [2-7, -� —5 STA-0+91��, SD LINE 2 JUNCTION BOX 1 ---- N=807795.74 E=1701622.26 BY OTHERS �1000p j9 \P / V J PROPOSED DROP INLET PROTECTION BY OTHERS EROSION CONTROL NOTES: i STA 0+00.00 BEGIN CHANNEL REALIGNMENT 5 CULVERT OUTFALL ELEV. 888.0 PROPOSED HEADWALL BY OTHERS �STA 0+00.00 PREFORMED SCOUR t '\, PROTECTION (TYP) LIMITS OF GRAVES 0+ PROPOSED SD LINE 2 BY OTHERS 900 1. CONTACT THE DEMLR WINSTON-SALEM REGIONAL OFFICE 336-776-9800 AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND DISTURBING ACTIVITY. 2. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED IN ACCORDANCE WITH NCDEMLR AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.50 INCHES OF RAIN PER 24-HOUR PERIOD. SELF -INSPECTION FORM CAN BE FOUND AT HTTP://DEQ.NC.GOV/ABOUT/DIVISIONS/ ENERGY-MINERAL-LAND-RESOURCES/EROSION-SEDIMENT-CONTROL/FORMS. 3. DESIGN COMPONENTS SHOWN ON PLANS MAY REQUIRE FIELD ADJUSTMENTS AT DIRECTION OF ENGINEER. 4. ALL DEBRIS REMOVED DURING TRENCH EXCAVATION IS TO BE IMMEDIATELY HAULED TO A PERMITTED OFF -SITE DISPOSAL LOCATION. 5. CITY OF HIGH POINT CONTACT PERSON RESPONSIBLE FOR MAINTENANCE: MELINDA KING 336-883-3217 STA 1 +45.65 END 3-TIER ROCK WALL WITH GEOBAG WALL SYSTEM ABOVE PROTECT EXISTING SEWER WITH GROUTED RIPRAP SEE NOTE 6 EXISTING CHANNEL CENTERLINE ♦ _ -- ice. PROPOSED SD LINE 1 BY OTHERS �- •-'��� LIMITS OF \ GRAVES ENCASE SEWER IN CONCRETE AT ROCK WALL CROSSING SEE NOTE 7 STA 0+04.65 STA 1 +45.97 BEGIN 2-TIER ROCK WALL END 2-TIER ROCK WALL WITH AT END OF CULVERT HEADWALL GEOBAG WALL SYSTEM ABOVE WITH GEOBAG WALL SYSTEM ABOVE AT 2:1 SLOPE STABILIZE AND VEGETATE (SEE SHEET C-3 AND C-5) NOTE: CONTRACTORS SHALL STAY WITHIN THE SPECIFIED LATERAL � LIMITS AND SHALL NOT DISTURB GRAVES. APPROVED EQUIPMENT MATS SHALL BE USED TO PROTECT j ff, ALL GRAVES WITHIN 10 FT OF � EQUIPMENT. EXCAVATORS WITH TAIL SWING SHALL NOT BE ALLOWED DURING CONSTRUCTION. NOTES: 1. FINAL LOCATION OF CONSTRUCTED RIFFLES SHALL BE VERIFIED IN FIELD AND APPROVED BY ENGINEER OF RECORD. 2. STONE FOR ROCK TOE SHALL BE APPROVED BY CITY PRIOR TO INSTALLATION. 3. CONTRACTOR SHALL TEMPORARILY STOP WORK DURING BURIALS. CITY WILL PROVIDE 24-HOUR PRIOR NOTICE. 4. IF ANY CEMETERY PROPERTY IS DAMAGED, o CONTRACTOR SHALL REPLACE AT NO COST TO OWNER. + 5. CONTRACTOR SHALL COORDINATE WITH CEMETERY STAFF PRIOR TO INSTALLATION OF CONSTRUCTION 115 SAFETY FENCE TO VERIFY LOCATION AND DEPTH OF N WOODEN STAKES. (OFFICE PHONE NUMBER: 336-883-3408) 6. INSTALL GROUTED RIPRAP TO PROTECT EXISTING = SEWER PIPE. GROUTED RIPRAP SHALL EXTEND FROM EDGE OF PIPE WEST TO PROPOSED ROCK WALL AND A MINIMUM OF 6 INCHES ON ALL SIDES OF PIPE. 7. ENCASE SEWER PIPE IN CONCRETE AT LOCATION WHERE IT RUNS UNDER PROPOSED ROCK WALL. CONCRETE SHALL BE MINIMUM 6 INCHES THICK ON ALL SIDES. EXTEND CONCRETE MINIMUM 1' PAST ROCK WALL BOTH SIDES. 8. REPLACEMENT OF STORMWATER PIPES IS PART OF A SEPARATE PROJECT. WORK WILL BE COORDINATED PRIOR TO CONSTRUCTION. 9. IF UNMARKED HUMAN SKELETAL REMAINS ARE ENCOUNTERED DURING CONSTRUCTION, THE PROVISIONS OF NORTH CAROLINA GENERAL STATUTE CHAPTER 70, ARTICLE 3 APPLY. CONSTRUCTION ACTIVITIES SHOULD IMMEDIATELY CEASE, AND THE COUNTY MEDICAL EXAMINER SHOULD BE CONTACTED. —1+00 0+00 1+00 1+ 50 Role] 0 10' 20' 40' SCALE IN FEET HORIZONTAL 0 2' 4' SCALE IN FEET VERTICAL FINAL DESIGN 0 0 0 z N z N 0 \ CZ N O w U =~ �U �owo� oz z ~ �vi N o v 0 w z Nwo 00 o <> �a ww U - c' cz, �wroF- p m� w-wZ o Z 0 0 O 00of z ��0<cno �am Wu J 00 N 0 W Vo� (1 y 0 ID NW o0)� cZ r N 0 U 3 D Z o N C� 0 w U O Q L.f i 0- r-I uJ z O 00 Z z 1­O Q + z0 0� O °2 O z �� � J O = Lu Lu u H Q LL O Or_ �z 7 O U0 Q w Lu z � c O ~ Q J Lu re 7 Q op o J M N m N O z a-Q o m= w oLLJ U Z Z W y ul U 3: cf) U Z H W < > W Q LL Q Q (If U cn w Lu Lu 7 < < o z J > 1 U } m Lu cn 0 z SHEET SEQ. C-1 Plot Dote: 1 /25/2024 1 :35 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV—STREST—DT.dwg rl- 0 00 0 �m p I > � O cf)� W V) I a- U /N U v) 0 O p N Ln cn N ~ CN a� a� > cn 0 QQ)cn u - O Q L7 J STA 1 +90.42 PREFORMED SCOUR PROTECTION (TYP) � STA 1 +89.73 OAKWOOD BEGIN LAY BACK BANKS MEMORIAL STA 3+43.82 STA 5+30.98 PROPOSED 000 0AT 2:1 SLOPE. INSTALL PARK END 1—TIER ROCK WALL BEGIN LAY BACK BANKS SD LINE 1 COIR MATTING AND PLANT WITH GEOBAG WALL SYSTEM AT 2:1 SLOPE. INSTALL BLEND TO EXISTING COIR MATTING AND PLANT BY OTHERS (SEE SHEET C-4 AND C-5) O ABOVE AT 2:1 SLOPE BLEND TO EXISTING O TRANSITION TO GRADING BANKS AT 2:1 SLOPE O (SEE SHEET C-4 AND C-5) STA 2+93.92 O p0 END LAY BACK BANKS AT 2:1 QC (SEE SHEET C-4 AND C-5) SLOPE TRANSITION TO 1 —TIER 0s ROCK WALL WITH GEOBAG WALL O O Q O SSSYSTEM ABOVEAT 2:1 SLOPE. A GRADE BANKS AT 2:1 SLOPE STABILIZE AND VEGETATE STABILIZE WITH COIR MATTING O O (SEE SHEETS C-4 AND C-5) O AND PLANT VEGETATION ss —ss (SEE SHEET C-4 AND C-5) s � _s5 } � `•�'�• �S STA 4+77.92 /•/'� '�. wadi, :77�•�• S ss END PROPOSED �•�• LOODPLAIN BENCH LEN TO EXISTING L Ll NUY'.� ; * - EE SHEET C-4 AND C-5) O❑ e`5 z 1___' STA 5+40.06 BEGIN 20' CONSTRUCTED RIFFLE SEE NOTE 1 ss Ssy ss ss CO' NOTE: CONTRACTORS SHALL STAY -) / WITHIN THE SPECIFIED LATERAL E STA 6+61.18 END LAY BACK BANKS LIMITS AND SHALL NOT DISTURB AT 2:1 SLOPE. INSTALL GRAVES. APPROVED MATS OR c COIR MATTING AND PLANT PLYWOOD SHALL BE USED TO � a) BLEND TO EXISTING PROTECT ALL GRAVES WITHIN 10 FT 0 c (SEE SHEET C-4 AND C-5) OF EQUIPMENT. EXCAVATORS WITH ZU w ass TAIL SWING SHALL NOT BE oT , —�5 ALLOWED DURING CONSTRUCTION. 7"—s—s—s— 0 STA 6+23.45 BEGIN 20' uCONSTRUCTED _Ss—sSs _ --ISS - y L SEE NOTE 1 z .� - -RIFFLE HORIZONTAL — �— \ STA 1 +99.88 8so �� ��� �� �/ '�� �� �� /� ,� STA 6+42.52 �. BEGIN 20' STA 3+39.92 BEGIN 1 —TIER ROCK WALL ' CONSTRUCTED BEGIN PROPOSED - STA 5+ 15.55 RIFFLE CHANNEL ALIGNMENT LAY BACK BANKS STA 6+57.48 SEE NOTE 1 --__—WITH FLOODPLAIN BENCH - �4+00 00 = AT 2BEGIN :1 SLOPE. INSTALL END 1—TIER ROCK WALL '—•—_ - � •� WITH BANKS LAID BACK INSTALL CONSTRUCTION SAFETY FENCE AROUND PROJECT LIMITS, TYP SEE NOTE 5 —•— _, - - _ �� .� COIR MATTING AND PLANT BLEND TO EXISTING ABOVE AT 2:1 SLOPE �,�•�' - (SEE SHEET C-4 AND C-5) BLEND TO EXISTING STA 3+40.13 cp. i,i'� C EM ETERYPs (SEE SHEET C-4 AND C-5) BEGIN 1 —TIER ROCK WALL � / •�• STA 41—TIER 6ROCK WITH GEOBAG WALL SYSTEM —.—•—.—.—•— •��'�� Z END END WALL ABOVE AT 2:1 STABILIZE AND SLOPE VEGETATE EXISTING CHANNEL WITH GEOBAG WALL SYSTEM (SEE SHEET C-4 AND C-5) CENTERLINE PROVIDE 5 FT MINIMUM 2:1 SLOPE STBAOBILI EAVE AT AND VEGETATE BETWEEN TOP OF BANK (SEE SHEET C-4 AND C-5) AND EDGE OF PAVEMENT LIMITS OF DISTURBANCE 0 2 y —� SCALE IN FEET WNW 0 °' � r , D � 3 `1 NOTES: J , 3 z o , 1 . FINAL LOCATION OF CONSTRUCTED RIFFLES SHALL BE Q) VERIFIED IN FIELD AND APPROVED BY ENGINEER OF RECORD. 2. STONE FOR ROCK TOE SHALL BE APPROVED BY CITY PRIOR TO INSTALLATION. 3. CONTRACTOR SHALL TEMPORARILY STOP WORK DURING w BURIALS. CITY WILL PROVIDE 24—HOUR PRIOR NOTICE. V 4. IF ANY CEMETERY PROPERTY IS DAMAGED, 0 CONTRACTOR SHALL REPLACE AT NO COST TO OWNER. Q z 5. CONTRACTOR SHALL COORDINATE WITH CEMETERY J STAFF PRIOR TO INSTALLATION OF CONSTRUCTION Lu SAFETY FENCE TO VERIFY LOCATION AND DEPTH OF W WOODEN STAKES. (OFFICE PHONE NUMBER: Z 336-883-3408) 0 0 6. IF UNMARKED HUMAN SKELETAL REMAINS ARE LI ENCOUNTERED DURING CONSTRUCTION, THE Z Q + PROVISIONS OF NORTH CAROLINA GENERAL STATUTE z O < CHAPTER 70, ARTICLE 3 APPLY. CONSTRUCTION ACTIVITIES SHOULD IMMEDIATELY CEASE, AND THE 0 O Z COUNTY MEDICAL EXAMINER SHOULD BE CONTACTED. _ 0 J 892 r W W > XISTINO 48" PIPE 888 888 PROPOSED 40 LF OF 6' X 4' BOX CULVERT @ 3,73% BY OTHERS EXISTING GRADE AT CONSTRUCTED RIFFLE 884 PROPOSED CENTERLINE 884 CONSTRUCTED RIFFLE I N V: 883.00 880 880 CONSTRUCTED RIFFLE CONSTRUCTED RIFFLE PREFORMED SCOUR w — 876 PROTECTION PROPOSED GRADE EXISTING CHANNEL GRADE. MATCH EXISTING GRADE WITH 876 Z �_ J w Z -- _ o w SHIFTED CHANNEL ALIGNMENT a 0 0 0- LnLn0 \\ co CO U q 4 0 + 0- Z ��[if �� a QWZ Lnww 872 �Jw cnwm 872 1+50 2+00 3+00 4+00 5+00 6+00 LL 0 J U � �Z 5 G u 0 2i Lu I mow/ 0. Z � 0 co Q � J Lu N It �: 2 0 op O J M N m N O z Q o m 2 w p ow U Z Z W y ul (D 3: LO U Z H Cn Q > Lu FL Lu Lu� Q � o z cn Lu U LL m M 0 i C M m O O O U O-0, _c:M O 0)o L (n m m � w� J Q U w cn O z J. W > o SHEET 6+80 C-2 FINAL DESIGN SEQ. Plot Dote: 1 /25/2024 1 :36 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV—STREST—DT.dwg Al 01 3 �m cn x a) 1 > cf)� 1J cn n I > U p -�- /N a C/� 20 p N Ln cn N ~ a) a�6> ��cn 0 QQ)co U — O Q L- J GRADED SLOPE ABOVE CULVERT HEADWALL BY OTHERS 912 PROP GROUND - 908 904 - 900 896 EX CULVERT TO 892 BE REMOVED BY OTHERS 888 EX SEWER TO - REMAIN IN SERVICE 884 -40 -20 LIMIT OF 912 GRAVESTONES / LIMIT OF DISTURBANCE 908 904 900 896 892 888 884 880 -40 -20 d ►. EX GROUND 912 LIMIT OF 908 DISTURBANCE 0 STA 0+00 904 900 - 896 PROP 6'(H) x 4'(V) CULVERT BY OTHERS 392 OHWM 888 BOULDER BASIN 40 884 AT CULVERT OUTFALL GRADE BACK BOTH BANKS AT MAX 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE c niR MAT ANn VFC;FTATF ARnVF GEOBAG WALL (TYP) PROP GROUND 2-TIER STACKED ROCK WALL GROUND - EX 25-YR ELEV. LIMIT OF DISTURBANCE OHWM 3-TIER STACKED ROCK WALL GROUTED RIPRAP AROUND SEWER PIPE SEE NOTE 5 BOULDER BASIN PROP GROUND 908 - - 904 — 900 896 892 888 LIMIT OF GRAVESTONES / LIMIT OF - DISTURBANCE GROUTED RIPRAP 884 AROUND SEWER PIPE SEE NOTE 5 880 -40 -20 0 STA 0 + 1 2 20 GRADE BACK BOTH BANKS AT MAX 2:1 SLOPE AND PLACE 4 LIFTS 40 912 908 904 900 896 892 888 884 880 CONSTRUCTED GEOBAG WALL SYSTEM 912 ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE ABOVE 908 GEOBAG WALL (TYP) EX GROUND 904 /7777:: 3-TIER STACKED — ROCK WALL 900 — T — ----- — 896 LIMIT OF 892 —T7725-YR ELEV. DISTURBANCE OHWM 888 2-TIER STACKED 884 ROCK WALL 0 20 40 880 STA 0+25 GRADE BACK BOTH BANKS AT MAX 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE ABOVE GEOBAG WALL (TYP) 3-TIER STACKED EX GROUND ROCK WALL PROP GROUND = 25-YR ELEV. - 7777- AL =11 OHWM 2-TIER STACKED ROCK WALL -40 -20 0 20 STA 0+38 Plot Dote: 1 /25/2024 1 :37 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV-STREST-XS.dwg MENEM 1 -I EVAN off • ��� 888 GROUTED RIPRAP 884 AROUND SEWER PIPE SEE NOTE 5 880 912 908 904 900 896 LIMIT OF DISTURBANCE 892 888 884 40 880 908 904 900 896 892 888 884 880 GRADE BACK BOTH BANKS AT 2:1 NOTE: CONTRACTORS SHALL STAY SLOPE AND PLACE 4 LIFTS WITHIN THE SPECIFIED LATERAL CONSTRUCTED GEOBAG WALL SYSTEM LIMITS AND SHALL NOT DISTURB ABOVE STACKED ROCK WALL. PLACE GRAVES. APPROVED MATS OR -40 SEE NOTE 6 0 STA 0+50 LIMIT OF GRAVESTONES / GRADE BACK BOTH BANKS AT 2:1 LIMIT OF SLOPE AND PLACE 4 LIFTS DISTURBANCE CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE 908 COIR MAT AND VEGETATE SLOPE ABOVE GEOBAG WALL (TYP) 904 900 EX GROUND 896 — PROP GROUND 892 888 3-TIER STACKED ROCK WALL 884 880 -40 -20 LIMIT OF DISTURBANCE 908 904 900 — EX GROUND 896 PROP GROUND 892 888 3-TIER STACKED 884 I ROCK WALL 880 -40 -20 901 89_ 892 888 884 880 -40 -20 0 STA 0+75 SLOPE 908 PLYWOOD SHALL BE USED TO �P) 904 PROTECT ALL GRAVES WITHIN 10 FT OF EQUIPMENT. EXCAVATORS WITH -EX GROUND 900 TAIL SWING SHALL NOT BE ALLOWED DURING CONSTRUCTION. 896 LIMIT OF - DISTURBANCE 892 25-YR ELEV. OHWM 888 2-TIER STACKED ROCK WALL 884 I I 880 NOTES: 20 40 908 904 LIMIT OF 900 DISTURBANCE 896 892 � 25-YR ELEV. OHWM — — 888 2-TIER STACKED ROCK WALL 884 20 40 880 GRADE BACK BOTH BANKS AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED 908 ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE ABOVE goo GEOBAG WALL (TYP) 0 STA 1 +00 EX GROUND 900 LIMIT OF DISTURBANCE 896 892 25-YR ELEV. � OHWM 888 2-TIER STACKED ROCK WALL 884 20 40 880 GRADE BACK BOTH BANKS AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE ��� --- MENEM - . • , I I Let 1111 `01111 0 STA 1 +25 20 - -'- - - 89MEMO 892 - 888 884 880 -40 -20 0 STA 1 + 44 20 896 OF - R A 892 LIMIT OF 900 DISTURBANCE 896 EX GROUND 892 LEV. OHWM 888 TACKED 884 L 40 880 1. ALL GRADED SLOPES SHALL BE LINED WITH COIR MATTING PER THE DETAIL. 2. ALL STACKED ROCK WALL WILL BE BLENDED TO EXISTING GROUND AT TOP OF ROCK TO LIMIT EROSION AT TOP OF WALL. 3. PLACE SINGLE COIR WRAPPED LIFT ABOVE STACKED ROCK WALL AS REQUIRED 4. GEOBAGS WILL BE BUILT IN A MANNER THAT BLENDS WITH EXISTING BACKSLOPE. A MINIMUM OF 4 LIFTS (-2 FT ABOVE STONE) AT -2:1 (H:V) SLOPE SHALL BE USED UNLESS OTHERWISE SPECIFIED ON PLANS. LIFTS CAN BE PLACED AS STEEP AS 1.5:1 (H:V). MORE BAG LAYERS MAY BE USED AT DIRECTION OF ENGINEER. 5. GROUT RIPRAP BETWEEN STACKED ROCK WALL AND EXISTING SEWER PIPE TO PROTECT PIPE. EXTEND GROUTED RIPRAP ABOVE AND ON SOUTH SIDE OF PIPE FOR MINIMUM OF 6 INCHES. 6. ENCASE SEWER PIPE IN CONCRETE AT LOCATION WHERE IT RUNS UNDER ROCK WALL. CONCRETE SHALL BE MINIMUM 6 INCHES THICK ON BOTH SIDES AND ABOVE PIPE. EXTEND CONCRETE MINIMUM 1' PAST ROCK WALL BOTH SIDES. 0 10 20' SCALE IN FEET O 0 U O Z N Z o N 0 \ CD Z w N 2 �I w 0.aZ0 N o o Y"w Z Ln o 0 0 a > L� a ww U JK N �M.zaiNa NwroM�~ 0 �Zmo ;� LA-w-�Z �LLoQo �o Z of (�W� =,O 0 oNF,000 Z ��c<�s 0 Ta-< m WU J �O N 0 W= -` o� V U� C° E y 1 U NW ors cZ r N � 3 U D \-- 3 -C J 1 3 ' 1 cU Z U N c:� 0 Lr� a -3:: w U Q J w z Op Z QN z O L.f. °2 O U) J =W W U � J O � �z 00 Q w 0./ z O� J Q op o J co N co N o z a- Q o m= w o o 0) o z z W y w U � L U 7 z u> Q > w � o 0 0 U X H w W Lu 7 ~ a o z 1 > 1 U } m W D 0 z SHEET C-3 FINAL DESIGN SEQ. �m cn X Q) I > 0 cncn W m In U p /N a C/� So ,2� N Ln cn N ~ N Z 6 Q) > ��cn O QQ)co U — O Q L_ J � • r —tee 900 896 892 888 — EDGE OF PAVEMENT — 884 EX GROUND 880 876 —40 896 892 EDGE OF PAVEMENT 888 884 EX GROUND 880 — 876 —40 —20 0 STA 2+00 PROP GROUND 1 -TIER STACKED - ROCK WALL —20 1 -TIER STACKED ROCK WALL -20 896 GRADE BANK AT 2:1 SLOPE. PLACE 892 COIR FIBER MAT AND VEGETATE 888 (TYP) 884 880 EDGE OF EX GROUND PAVEMENT 876 PROP GROUND 872 —40 —20 EDGE OF GRADE BANK AT 2:1 PAVEMENT SLOPE. PLACE COIR FIBER MAT AND 892 - VEGETATE. BLEND TO EXISTING 888 884 — — — -- --- --- EX GROUND 880— 876 GRADE FLOODPLAIN BENCH AT 15:1 SLOPE. 872—PLACE COIR FIBER MAT AND VEGETATE 868'-40 —20 20 GRADE BACK BANK AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE ABOVE GEOBAG WALL (TYP) 40 25-YR ELEV. OHWM EDGE OF PAVEMENT - 0 20 40 STA 2+50 GRADE BACK BANK AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK 0 20 40 STA 3+00 GRADE BACK BANK AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE ABOVE GEOBAG WALL (TYP) EDGE OF 25-YR ELEV. PAVEMENT OHWM � - 1 -TIER STACKED ROCK WALL 0 20 40 STA 3+50 PROP GROUND 0 STA 4+00 GRADE BACK BANK AT 2:1 SLOPE AND PLACE 4 LIFTS CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. PLACE COIR MAT AND VEGETATE SLOPE ABOVE GEOBAG WALL (TYP) —� EDGE OF PAVEMENT 25-YR ELEV. OHWM 1 -TIER STACKED ROCK WALL 20 40 900 896 892 888 884 880 876 900 896 892 888 884 880 876 896 892 888 884 880 876 896 892 888 884 880 876 872 892 888 884 880 876 872 868 EDGE OF PAVEMENT GRADE BANK AT 2:1 SLOPE. PLACE COIR FIBER MAT AND 892—VEGETATE. BLEND TO EXISTING 888 884- 880 EX GROUND GRADE FLOODPLAIN 876 BENCH AT 15:1 SLOPE. PLACE COIR FIBER MAT 872 AND VEGETATE 868 40 —20 GRADE BANK AT 2:1 SLOPE. PLACE COIR 892 FIBER MAT AND VEGETATE. BLEND 888EDGE TO EXISTING PAVEMENTii 884 ---- __ 25-YR ELEV. 880 — 876 GRADE FLOODPLAIN BENCH AT 15:1 SLOPE. 872 PLACE COIR FIBER MAT AND VEGETATE 888 884 880 EDGE OF EX GROUND 876 PAVEMENT PROP GROUND 872 —40 —20 EDGE OF PAVEMENT 888 884 880 25-YR ELEV. � 876 872 —40 EDGE O4GROUN PAVEME 888 E 884880 25-YR ELEV.876 GRADE BANK AT PLACE COIR FIBE 872VEG868 —40 EX GROUP PROF GROUNC —20 PROP GROUND 0 STA 4+50 PROP GROUND 0 STA 5+00 GRADE BACK BANK AT 2:1 SLOPE AND PLACE CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. EXTEND GEOBAG LIFTS TO DAYLIGHT SLOPE. EDGE OF PAVEMENT 25-YR ELEV. , 1 -TIER STA ROCK WALL 20 40 GRADE BACK BANK AT 2:1 SLOPE AND PLACE CONSTRUCTED GEOBAG WALL SYSTEM ABOVE STACKED ROCK WALL. EXTEND GEOBAG LIFTS TO DAYLIGHT SLOPE. - -17- OHWM 1 -TIER STACKED ROCK WALL 20 GRADE BANK AT 2:1 SLOPE. PLACE COIR FIBER MAT AND VEGETATE (TYP) NOTE: CONTRACTORS SHALL STAY WITHIN THE SPECIFIED LATERAL LIMITS AND SHALL NOT DISTURB GRAVES. APPROVED MATS OR PLYWOOD SHALL BE USED TO PROTECT ALL GRAVES WITHIN 10 FT OF EQUIPMENT. EXCAVATORS WITH TAIL SWING SHALL NOT BE 892 ALLOWED DURING CONSTRUCTION. 888 884 880 NOTES: 876 1. ALL GRADED SLOPES SHALL 872 BE LINED WITH COIR MATTING PER THE DETAIL. 868 2. ALL STACKED ROCK WALL - � 880 EX GROUND 876 40 872 888 EDGE OF PAVEMENT 884 25-YR ELEV. _ OHWM 880 INSTALL 876 CONSTRUCTED RIFFLE 0 20 40 872 STA 5+50 GRADE BANK AT 2:1 SLOPE. PLACE COIR FIBER KAAT Alvin \/F(;FTATF (TYP) JD EDGE OFPAVEMENT OHWM 0 20 STA 6+00 F1 -TIER STACKED ROCK WALL AND GRADE BANK AT 2:1 40 XPROP D GROUND SLOPE. PLACE COIR MAT. OHWM — EDGE OF PAVEMENT 2:1 SLOPE. R MAT AND :TATE (TYP) —20 0 STA 6+50 20 40 888 884 880 876 872 888 884 880 876 872 868 WILL BE BLENDED TO EXISTING GROUND AT TOP OF ROCK TO LIMIT EROSION AT TOP OF WALL. 3. PLACE SINGLE COIR WRAPPED LIFT ABOVE STACKED ROCK WALL AS REQUIRED 4. GEOBAGS WILL BE BUILT IN A MANNER THAT BLENDS WITH EXISTING BACKSLOPE. A MINIMUM OF 6 LIFTS (-3 FT ABOVE STONE) AT -2:1 (H:V) SLOPE UNLESS OTHERWISE SPECIFIED ON PLANS. LIFTS CAN BE PLACED AS STEEP AS 1.5:1 (H:V). MORE BAG LAYERS MAY BE USED AT DIRECTION OF ENGINEER. U � zw -0-0 c T 0 N (n01 a� a 0 c 0 1020' SCALE IN FEET 0 0 U t 0 z N z N O Li N O _� w � �o-iA oz z N o Yo w U z Nwo 00 O ww U w i�a NEr('oz� w� � O ,Zmomw LL_ �L�Qo o �o Z U w � � O O O cn 00 0 z (n0-]--<cno �aaz�m WU J �0 N 0 W= 0� W_ o� V U� C° y 0 O U � o� azNV cnFmi Z r N J I 13 ■ 00 Z U I N c:� 0 n�a� w U Q D_ w z 00 Z QN z O 0. 0 /'� J _ ui W U LL. J O� k-z CC G "0 Q w i z 0� J Q 0 z W 0 O O + N z 0 U W 0 U co o co J coN co N o z a- Q o m= w o o 0) O z z w y w 0 3:c U � z cn Q12� > w Cn LL 0� U X W w W Lu ~ a o z cn U } m W D cn 0 z SHEET C-4 FINAL DESIGN SEQ. Plot Dote: 1 /25/2024 1 :37 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV—STREST—XS.dwg 0 00 0 �m 0 N I > � O LLJ U In U r4,) /N N v) 0 O � p N N ~ CN a� a� > E U 0 cn QQ)cn U — O Q L_ J NOTES" 1. GRADE AREA OF INSTALLATION AS SHOWN ON PLANS. REMOVE ALL ROCKS AND OTHER OBSTRUCTIONS SO THE MATERIAL WILL HAVE DIRECT CONTACT WITH SOIL. 2. BAGS ARE TO BE FILLED ONSITE WITH MODERATE DRAINED MATERIAL TO BE APPROVED BY ENGINEER. FOLLOW BAG FILLING PROCEDURE FROM ENVIROLOK, FLEX MSE, DELTALOK OR APPROVED EQUIVALENT. 3. GEOBAG WALL LAYERS SHOULD BE SOLID AND UNIFORM. FLATTEN GEOBAGS WITH HAND TAMPER OR EQUIVALENT AFTER PLACEMENT AND BEFORE PROCEEDING WITH CINCHING, TWINING, AND STAKING. 4. APPLY VERTICAL BAG STABILIZER ACCORDING TO INSTALLATION INSTRUCTIONS FROM ENVIROLOK, FLEX MSE, DELTALOK OR APPROVED EQUIVALENT. 5. TIGHTEN VERTICAL BAG STABILIZER THROUGHOUT THE CINCHING AND TWINING PROCESS. REFER TO MANUFACTURER INSTALLATION INSTRUCTIONS. 6. APPLY SEED AND VEGETATION ACCORDING TO WALL SYSTEM MANUFACTURER'S INSTRUCTIONS. 7. GEOBAGS WILL BE BUILT IN A MANNER THAT BLENDS WITH EXISTING BACKSLOPE. A MINIMUM OF 6 LIFTS (-3FT ABOVE ROCK WALL) AT — 1.5:1 (H:V) SLOPE UNLESS OTHERWISE SPECIFIED ON PLANS. MORE BAG LAYERS MAY BE USED AT DIRECTION OF ENGINEER. EXISTING TREES TO REMAIN UNLESS SPECIFIED ON THE PLANS OR DIRECTED I I BY THE ENGINEER EXISTING GROUND II PLATIPUS ANCHORS SEE STACKED WALL DETAIL 3' PLATIPUS ANCHOR OR APPROVED EQUIVALENT (NOT USED ON FILL SECTIONS) WRAP GEOGRID FABRIC AROUND BAG AND PROVIDE OVERLAP PLATIPUS ANCHOR TO BE RUN THROUGH OVERLAP IN GEOGRID FABRIC, IN BETWEEN BAGS TO AVOID PUNCTURING THE BAG TRIM ROOTS AS NECESSARY TO PLACE GEOBAG ON SOIL COIR FABRIC KEYED UNDER TOP BAG AND STAPLE TO FILL 0.5' MAX VARIES TO MEET EXISTING GRADE �1 LIVE PLANT MATERIAL (SEE PLANTING TABLE) BETWEEN COURSES WRAP GEOGRID FABRIC AROUND BAGS, EVERY OTHER ROW PLACE BAG ANCHOR DEVICE EVERY ROW TO CONNECT BAGS TOGETHER, PER MANUFACTURER GUIDANCE GEOBAG ANCHORING AND WRAPPING DETAIL PLATIPUS ANCHOR EVERY FOURTH BAG (APPROX. 8') PLACED IN BETWEEN BAGS TO AVOID PUNCURING (NOT USED ON FILL SECTIONS) GEOGRID FABRIC WRAP AND SECURED TO EXISTING BANK WITH PLATIPUS ANCHOR. PLACE ANCHOR HORIZONTALLY EVERY FOURTH BAG (APPROX. 8 FT). MATCH PRE CONSTRUCTION CONTOURS GEOBAG WALL SYSTEM — BLEND TO EXISTING SECTIONS CROSS SECTION INSERT 2 GEOBAG ANCHOR DEVICES PER BAG GEOBAG WALL (ONLY 2 ROWS SHOWN FOR CLARITY) EXISTING STREAM BANK WALL SYSTEM PLAN iirIAi EXISTING GROUND -1— I NATIVE MATERIAL COMPACTED TO 95% DENSITY TYPICAL GEOBAG —PROPOSED GRADING f- � , 1 f GEOGRID TIE BACK �7 MINIMUM 24" THICK APPROVED FREE —DRAINING BACKFILL (MAY BE AVAILABLE ON —SITE) AS APPROVED BY ENGINEER. SNORKEL BAG CLOSED WITH UV RESISTANT ZIPTIE \G SEAM COIR FABRIC KEYED UNDER TOP BAG AND STAPLE TO FILL 2 �1 LIVE PLANT MATERIAL (SEE PLANTING TABLE) BETWEEN COURSES MATCH PRE SEE STACKED CONSTRUCTION WALL DETAIL CONTOURS GEOBAG WALL SYSTEM — FILL SECTIONS CROSS SECTION GEOBAG WALL SYSTEM (ENVIROLOK, FLEX MSE, DELTALOK, OR EQUIVALENT NOT TO SCALE �a) U C Z w -0-0 ET 0 .N (n0, 0 C FINAL DESIGN 0 0 U 0 Z N Z CD \ 0 w O >�- m w Q� �owo� Oz z ��aZON N � w Z N O <L U w����a N m O �Zmomw oQo o z~ U w _ � � O O oUnE'-0o� Z u�u< LnZ) 9 F-- 0- W� J wO N 0 W= -` o W o441 V c� r` z y c)U ors aNV cn Z r` N 3 -C J 1 3 ' cU Z U N c:� 0 w U Q w z Op Z QN z O L.f. O (D (n J = w w > U u- J O � �z UO Q 2i w i z� Ou) I— CJ G Q 2 J Q W 0 � p N N co O coN J m N O z a-Q o ui O z z Y Q > w z co H c LL c c c� U I cn w W fy_ ~ a o z CO J � U } m w cn cn O z SHEET SEQ. C-5 w J Q U LL w > O Plot Dote: 1 /25/2024 1 :37 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV—STREST—DT1.dwg r- 0 00 0 3 °m o > 0 cnc/) w m cn g d U r7 /N N V O r) N LO N ~ � � N Z .. N N > cn O Q (n U = o Q I� I O 00 0 �m 0 I > �0 cf)cn w I n > U r7 /N 0)� (n O O L N J � cn N ~ � a� a� > m E 0 0 Q Q) V) Q L� J EXISTING BANKLINE III —III COIR FIBER MATTING (SEE DETAIL) BACKFILL OR CUT SLOPE III AT 2H:1 V. FILL OF NATIVE „ MATERIAL COMPACTED TO 95% III —III- 12 —18 FABRIC OVERLAP DENSITY OR EXISTING SOIL. �y -IIIIIIIIIIIII 'L IIIIIIIIIIIIIII + II -III EXISTING NATIVE GROUND IIIIII—� 1' MIf -IIIIIII I- -1 I II I II 1I POROUS EROSION CONTROL BACKFILL (NCDOT #5 STONE) =1 I IIIIIII� I NON —WOVEN T-I 11I I I11=1 I II I II I i=1 I II I II GEOTEXTILE FILTER FABRIC GEOBAG WALL, TYP. ADD BAGS AS NEEDED TO TIE INTO EXISTING GRADE. SEE DETAIL. N, MINIMUM EXPOSED DIMENSIONS 2'(H)x1'(V) STACKED ROCK WALL STREAM BED INVERT TOE RIPRAP SIZE STONE TO CLASS B FOOTER STONE BURIED TO EXISTING J NON —WOVEN GEOTEXTILE STREAM INVERT FILTER FABRIC 1 ONE- TIER ROCK WALL WITH GEOBAGS NOT TO SCALE EXISTING BANKLINE COIR FIBER MATTING (SEE DETAIL) IIII III_ 12"-18" FABRIC OVERLAP III IIIIII-I �IIIIIIIIIIIIII � BACKFILL OR CUT SLOPE III AT 2H:1 V. FILL OF NATIVE (- MATERIAL COMPACTED TO 95% DENSITY OR EXISTING SOIL. I IIIII I I- -I I II I II �IIII 1I =1 I IIIII 11= III-IIII ��� i NON —WOVEN GEOTEXTILE III —III O�o�o 0 FILTER FABRIC O O IIIII-III- ���� —III—III o O O O O -IIIIII-III_ EXISTING NATIVE IIIIII=III- o�jo��� GROUND II I=III=III=III=III- ������� POROUS EROSON CONTROL=III ,III BACKFILL (NCDOT #5 STONE)III-III �IIIIII FOOTER STONE BURIED TO EXISTING STREAM INVERT GEOBAG WALL, TYP. ADD BAGS AS NEEDED TO TIE INTO EXISTING GRADE. SEE DETAIL. STACKED ROCK WALL MINIMUM EXPOSED 1' MIN DIMENSIONS IS 2H, 1' V. z STREAM BED INVERT N N TOE RIPRAP III- 1 SIZE STONE TO II -III- CLASS B 1-IIII � IIII NON —WOVEN GEOTEXTILE FILTER FABRIC THREE- TIER ROCK WALL WITH GEOBAGS NOT TO SCALE BACKFILL OR CUT SLOPE AT 2H:1 V. FILL OF NATIVE MATERIAL COMPACTED TO 95% DENSITY OR EXISTING SOIL. NON —WOVEN GEOTEXTILE FILTER FABRIC I -I1 EXISTING NATIVE GROUND POROUS EROSION CONTROL BACKFILL (NCDOT #5 STONE) END ROCK WALL BY KEYING INT BANK AT 4 DEG, MIN E T A ` VV RIPRAP CLASS B EXISTING BANKLINE COIR FIBER MATTING (SEE DETAIL) 12"-18" FABRIC OVERLAP GEOBAG WALL, TYP. ADD BAGS AS NEEDED TO TIE INTO EXISTING GRADE. SEE DETAIL. STACKED ROCK WALL MINIMUM EXPOSED DIMENSIONS IS 2' H, 1' V. 1' MIN _IIII O o O STREAM BED INVERT IIIII I ��� N r - III III—IIII - �� N� TOE RIPRAP SIZE STONE TO CLASS B IIIIII-III o�oo _II I I I IIIIIIIIII-III - IIIIIIIIIIIIIIIIII—III 1III- NON —WOVEN GEOTEXTILE i IIII11 FILTER FABRIC FOOTER STONE BURIED TO EXISTING STREAM INVERT TWO- TIER ROCK WALL WITH GEOBAGS NOT TO SCALE M r-P'1r ATIA1/I Tirn nr M/-\/-%I/ FLOW STACKED ROCK WALL NOT TO SCALE END ROCK WALL BY KEYING INTO BANK AT 45 DEG, MIN 6' kVVIII I IVV L/'11\VL V/'1rJ BETWEEN STONES PLAN VIEW NOTES: 1. STACKED ROCK WALL SHALL HAVE 2 OR 3 TIERS ONE (1) TIER ABOVE THE FOOTER TIER. 2. STACKED ROCK WALL CAN BE STACKED WITH A SLOPE BETWEEN 0.5:1 (H:V) AND 2:1 (H:V) STEEP. 3. MINIMUM STACKED STONE SIZE FOR ROCK WALL 3'(L) X 2.5'(W) X 2'(H). THE STRUCTURE STONE MUST BE BLOCKY, ANGULAR, AND STACKABLE. 4. NON —WOVEN GEOTEXTILE FILTER FABRIC SHALL BE NCDOT APPROVED WEIGHT OF 90Z. 5. GEOBAG SIZE WILL BE 5.5" H x 2'2" L X 1'3" W. SEE DETAIL. U � s U c Z W -0-0 ET 0 .N �0, 0 c FINAL DESIGN 0 0 U (V z CD N O c\O Z W N O D oZ Z N oig: YOUw z N w p p o ww U Ofmz��a M C/) LE � O �Zmomw L� Z—�z a 'y o 0 U w O p 0 cn [i f z �a-0��o �aazt__m WU JN �0 O W �` = o4- W or- V Ur- �■ o U MEO r-- Z r N aNV cn o 3 D cn3 - J ■ Z 0 Iv I Nc:� 0 Un3a3: LJJ U Q J LU Z Op Z QN z O ry °2 O u) J _0 = w LJJ > U LL J O � � Z 00 Q LJJ i Z O� I— Q Q (110-11 LLJ Z Lei CD Q Lij o co co N J m N O � z a-Q 0 Im inLu O 00 z z LLJu0 Q > w z H ILL 0 10 10 1 c� 0 cn w w Lu 2 Q � U E } m w cn cn O z SHEET SEQ. C-7 _F0o O_ 0 O c En0 U O_0 c c:m a) a� o �mu) m � w T J Q U cn } LL E w > O Plot Date: 1 /25/2024 1 :37 PM Plot By: 03807 Filename: N:\WTU\Drawlngs\CV-STREST-DT1.dwq 0 00 0 �m N O N I > O cn cn W m cn� In UI� cn 0 O � p N Ln cn N ~ a� a� > E U cn O QQ)cn u - O Q L- J TOP OF BANKFULL T/Nn nE- oAKII/M II 1 STF STONE IMPERVIOUS DIKE IMPERVIOUS FABRIC STONE FILLING FINE FLOW ` Z� CHANNEL BOTTOM CROSS SECTION 1' FLOW BEDDING MATERIAL STONE FILLING MEDIUM BEDDING MATERIAL BASE OF STREAM STONE IMPERVIOUS DIKE PLAN VIEW GEOTEXTILE FILTER FABRIC STONE IMPERVIOUS DIKE PROFILE KAIN SECURE IMPERVIOUS FABRIC UNDER TOP LAYER OF SANDBAGS 13' MIN. SANDBAGS SECURE IMPERVIOUS FABRIC WITH STONE FILLING FINE SANDBAG IMPERVIOUS DIKE PROFILE NOTE: 1. THE STRUCTURE SHALL BE USED FOR DIVERTING AND PUMPING ONLY. THE STRUCTURE SHALL BE RELOCATED OR REMOVED ONCE PUMPING/DIVERTING IS COMPLETE. 2. EITHER TYPE OF IMPERVIOUS DIKE (SANDBAG OR STONE) MAY BE USED. CHANNEL A AIr\M AS SANDBAG IMPERVIOUS DIKE CROSS SECTION 1 IMPERVIOUS DIKE NOT TO SCALE IN '11 1 IAI(` AACn11 IAA T3'MIN. NOTE: 1. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. 2. PROVIDE STABILIZED OUTLET TO STREAM BANK. 3. WOOD PALLETS MAY BE USED IN LIEU OF STONEA ND GEOTEXTILE AS DIRECTED. A SUFFICIENT NUMBER OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE SPECIAL STILLING BASIN ABOVE NATURAL GROUND. EXISTING GROUND DRAINAGE GEOTEXTILE PUMP HOSE MAINTENANCE REQUIREMENTS: 15' MINIMUM 1. THE SPECIAL STILLING BASIN SHALL BE DISPOSED OF AND REPLACED WHEN IT IS 3/4 FULL OF SEDIMENT OR WHEN IT IS IMPRACTICAL FOR THE BAG TO FILTER THE SEDIMENT OUT AT A REASONABLE FLOW RATE. 2. THE INLET OF THE BAG SHOULD BE INSPECTED PERIODICALLY FOR DAMAGE AND/OR BLOCKAGE. 3 SEDIMENT CONTROL STONE SHALL BE REPLACED IF DAMAGED BY HIGH FLOWS OR BAG FAILURE. 1 SPECIAL STILLING BASIN NOT TO SCALE IMPERVIOUS DIKE (SAND F T\/nr I/N,A,AIN PROPOSED CHANN CHANNEL PIPE DIVERSION CROSS SECTION IMPERVIOUS DIKE SEE DETAIL MAIN PUMP (BASEFLOW) 3ED 24" CPP FLOW 8" OF SEDIMENT CONTROL STONE FLOOD PLAIN _\ STREAM VI I/�IVIVLL BOTTOM PIPE DIVERSION PROFILE NOTE: 1. PIPE MUST HAVE POSITIVE DRAINAGE WHEN USING DIVERSION (0.3% TO 2.0% PIPE SLOPE IS RECOMMENDED) CONSTRUCTION AREA (250' MAX) (LOCATION VARIES WITHIN THE PUMP AROUND AREA) IMPERVIOUS DIKE y SPECIAL STILLING SEDIMENT PUMP SEE DETAIL THIS AS REQUIRED PUMP -AROUND DIVERSION PLAN VIEW PUMP—AROUND/PIPE DIVERSION NOT TO SCALE OUTFALL ONTO GDOT RIPRAP TYPE 3 3AS1 N HEET NOTE: 1. CHANNEL SHALL BE MATTED WITH COIR FIBER MATTING PRIOR TO THE CLOSE OF EACH WORK DAY. 2. IF FINAL CHANNEL GRADING HAS NOT BEEN PERFORMED, TEMPORARILY SECURE COIR MATTING WITH STAKES OR ROCK FINAL DESIGN 0 0 0 Z WU J �O N 0 W= -` Vo� C° 0 o O U NW ors cn r N 3 -C J 1 13 ■ O Z Iv I 0 0 LJJ U Q z � O J V) Q LJJ z 0 [-- 0 0 Lij W Q z �0Q z� o� � 00 0- C� (n J Q ~ = w L1J > Z 0_j �z W � O Q ry �z 2i mow/ I LLJ z -:>:: !>: O Wo Li co O N J m N z z a- Q o o O Z z LLJ .e -0 LD Z H cn Q > W N H li I p p U I— cn w w 7 Q o z 0 U 1 } m -Fuo c � N � O O j O U O-0 M a) O cm a) L§(n L (n m "•— m- w— J Q U w W c O z W > o SHEET C-9 Plot Dote: 1 /25/2024 1 :37 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV—STREST—DT2.dwg CONSTRUCTION SEQUENCE GENERAL 1. OBTAIN ALL APPLICABLE PERMITS. 2. PRIOR TO SCHEDULING THE PRE —CONSTRUCTION MEETING, THE EROSION AND SEDIMENT CONTROL SURETY MUST BE SUBMITTED TO THE CITY OF HIGH POINT, EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A NCGO100000 CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES OCCUR. 3. AFTER THE PRE —CONSTRUCTION MEETING IS HELD, THE CONTRATOR CAN INSTALL E&SC MEASURES ONLY. THIS INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, SPECIAL SEDIMENT FENCE, AND INLET PROTECTION. CLEAR ONLY AS NECESSARY TO INSTALL THESE MEASURES. 4. THE CONTRACTOR SHALL CONDUCT SELF —INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF —INSPECTION FORM FOUND ON THE DEMLR WEBSITE (HTTP: /DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY— MINERAL— LAND— RESOURCES/ EROSION—SEDIMENT—CONTROL/FORMS). E&SC INSTALLATION AND MAINTENANCE LOG, A RAIN GAUGE, COPY OF CITY OF HIGH POINT SIGNED PLANS ONSI TE, REVISED SIGNED PLANS, NPDES LOG, AND CONSTRUCTION BOX MUST BE PRESENT AND EASILY ACCESSIBLE ONSI TE. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION WEEKLY, AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 0.5 INCHES. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. MAINTENANCE OF THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE AS DESCRIBED IN PLANS. 5. INSTALL PUMP AROUND AS DESCRIBED BELOW. PUMP AROUND WORK AREA DURING CONSTRUCTION ACTIVITIES. 6. IMMEDIATELY HAUL ALL CONSTRUCTION DEBRIS TO OFF —SITE DISPOSAL LOCATION. 7. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES 0.5 FEET DEEP. 8. DISTURBED AREAS SHALL BE STABILIZED AS SOON AS POSSIBLE. ALL AREAS WITH SLOPES STEEPER THAN 3:1 OR SLOPES GREATER THAN 50 FEET IN LENGTH SHALL BE STABILIZED WITHIN 7 DAYS. ALL OTHER AREAS THAT DO NOT MEET THE CRITERIA REQUIRING STABILIZATION WITHIN 7 DAYS SHALL BE STABILIZED WITHIN 14 DAYS. THIS MAY INCLUDE MOST AREAS WHERE PIPING AND PAVING ACTIVITIES WILL TAKE PLACE. 9. AFTER ALL LAND DISTURBING ACTIVITIES ARE COMPLETE AND THE SITE IS STABILIZED, ALL TEMPORARY MEASURES SHALL BE REMOVED, INCLUDING SILT FENCE, SILT FENCE STONE OUTLETS, CURB INLET PROTECTION, AND ANY OTHER APPROVED EROSION CONTROL MEASURES. PERMANENT SEEDING, MULCHING, AND LANDSCAPING SHALL BE APPLIED TO ALL DISTURBED AREAS WITHIN 30 WORKING DAYS OR 120 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPETITION OF CONSTRUCTION. 10. EROSION CONTROL MEASURES TO COMPLY WITH NPDES PERMIT NCGO10000 IN RELATION TO STORMWATER INSPECTION. 11. WHEN THE PROJECT IS COMPLETE, THE PERMITTEES SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. HARDWARE CLOTH (J" — I" MESH OPENINGS) OVER DEWATERING HOLES 2" TEMPORARY SEDIMENT POOL 0 1' MIN — 2' MAX. oCJo d"�r�4. NCDOT #57 — WASHED STONE 12" rDEWATERING x--CONCRETE BLOCK 2 x 4 WOOD STUDS (AS REQUIRED FOR LATERAL SUPPORT) CONCRETE BLOCK MAINTENANCE NOTES: 1. BLOCK AND GRAVEL INLET PROTECTION SHALL BE MAINTAINED PER THE NCDOT EROSION AND SEDIMENT CONTROL MANUAL. 2. REPLACE THE #57 WASHED STONE AS NEEDED TO ALLOW WATER TO DRAIN THROUGH THE DEVICE BETWEEN RAINFALL EVENTS u u - 2 x 4 WOOD STUDS (AS REQUIRED FOR EF LATERAL SUPPORT) NOTES: 1. ENSURE THAT DRAINAGE AREAS DO NOT EXCEED 1 ACRE o s PER INLET. 2. KEEP THE HEIGHT OF AND NO GREATER THAN THE BARRIER 24 INCHES. AT LEAST 12 INCHES 0 NCDOT #57 3. IF NEEDED, PLACE 2 OPENINGS FOR LATERAL x 4 WOOD STUDS THROUGH SUPPORT. BLOCK o —P� �'a � o� 000a, 4� o Q� O �o'ocrn >wov o vw� o ooaAB ooe. WASHED STONE 4. THIS PRACTICE MUST FILL MATERIAL AND MUST FILL SLOPES. NOT BE USED NOT DIVERT NEAR THE EDGE OF WATER OVER CUT OR 2:1 SLOPE, GRAVEL FILTER CITY OF HIGH POINT ISSUED 2-17-09 INLPRO BG.DWG NORTH CAROLINA REVISIONS STANDARD DRAWING FOR ENGINEERING SERVICES DEPARTMENT BLOCK AND GRAVEL INLET PROTECTION 608.01 APPROVED.. FAR 1AA1?;Y 2� , 20Z 7- FOR STORM DRAIN INLETS DIRECTOR U c zw -0-0 000 . 0 c 0 0 0 Z WU J �O N O W= -` Vo� (1 E y ID° NW o0)� cf)Z r N J I 3 ■ 00 Z N c:� 0 W U N Q z 0 V) L LJ z 0 Q 00 W 0� - LLJ D z �0Q 0� z� o� 00 C� W J Q ~ 2 w Lu U z LO J 00 0 z 0 Q LJ Lu r Z LLJ z 0 W QQ W LLJ J C,n PUMP AROUND: co O J 00 1. INSTALL DIVERSION PUMP, DISCHARGE LINE, AND OUTLET PAD. N N 2. INSTALL SEDIMENT PUMP AND SPECIAL STILLING BASIN AT LOCATION OF o 1—Q o z z z ui 0 DOWNSTREAM IMPERVIOUS DIKE. o6 w Q w � w � N = LL c c c � 10 3. INSTALL UPSTREAM IMPERVIOUS DIKE UPSTREAM OF ACTIVE CONSTRUCTION AREA w W w AND BEGIN PUMPING/DIVERTING OF THE MAINSTREAM FLOW. W o z J > 1 U 4. INSTALL DOWNSTREAM IMPERVIOUS DIKE DOWNSTREAM OF ACTIVE CONSTRUCTION AREA AND INITIATE PUMPING OF SEDIMENT —LADEN WATER FROM CONSTRUCTION m AREA AS NEEDED. 0 0 5. AT END OF EACH WORK DAY, COVER NATURAL STREAM BANKS WITH COIR F0 o MATTING. REMOVE IMPERVIOUS DIKES AND DIVERSION PIPE FROM STREAMS TO c:,� N °' ALLOW NATURAL FLOW. o 0 a� 00 0� o U) 6. UPON COMPLETION OF WORK, REGRADE STREAM BED AND BANKS AS SPECIFIED 0 0 IN PLANS. REMOVE EROSION CONTROL MEASURES FROM WITHIN CREEK BED. c STABILIZE WITH TEMPORARY AND PERMANENT SEED MIX AND STRAW MULCH. C� > REVEGETATE ACCORDING TO PLANTING PLAN. N D L � UI� �0�(n " 7. STABILIZE AND PROTECT FROM EROSION RESULTING FROM OFFSITE RUNOFF J .Q N WITHIN 7 DAY DURATION. L N W co / \ Ln ccnn LPL cn N W >o SHEET aa> Ecn o Q LT-- J FINAL DESIGN SEQ. Plot Dote: 1 /25/2024 1 :38 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV—STREST—DT2.dwg 0 STEP 1: EXCAVATE A 6" x 6" TRENCH. DRIVE STEEL POSTS 18" INTO GROUND DOWNHILL OF THE TRENCH. MAX. 8' BETWEEN POSTS STEP 4: BACKFILL THE TRENCH WITH #57 CLEAN STONE TO ANCHOR THE BOTTOM OF THE SILT FENCE SO THAT RUNOFF IS FORCED TO GO THROUGH THE FENCE AND CANNOT GO UNDER IT. F STEP 2: ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE INTO THE EXCAVATED TRENCH BOTTOM. HEIGHT - MAX. 3' MIN. 2' 5' STEEL POSTS DANCE NOTES: IPORARY SILT FENCE MUST BE MAINTAINED _ t THE NCDOT EROSION AND SEDIMENT CONTROL MANUAL. AT A MINIMUM, REMOVE AND DISPOSE OF ALL SILT ACCUMULATION WHEN THE DEPTH REACHES 2 OF THE HEIGHT OF THE GEOTEXTILE. DO NOT UNDERMINE DURING CLEANOUT. CITY OF HIGH POINT ISSUED 2-17-09 NORTH CAROLINA REVISIONS ENGINEERING SERVICES DEPARTMENT APPROVED..RY. ................:2.14 ..................... DIRECTOR ORAN, HIGH POLYE E NORTH CAROLINA Environmental Quality SECTION STEP 3: ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND THE BOTTOM OF THE FILTER FABRIC INTO THE TRENCH BOTTOM. WIRE FENCE "HOG WIRE" (14 GUAGE WITH MAX. MESH SPACING= 6 INCHES) FILTER FABRIC SEE SPECIFICATIONS FOR MATERIAL BOTTOM OF WIRE FENCE AND FILTER FABRIC BURIED 6" IN EXCAVATED TRENCH BACKFILLED WITH #57 STONE. STEEL POST DRIVEN 18" INTO GROUND NOTES: 1. BOTTOM OF FILTER FABRIC MUST BE PLACED IN TRENCH AND SECURED BY BACKFILLING THE TRENCH WITH #57 STONE. 2. DO NOT INSTALL SILT FENCE WHERE FLOWS ARE CONCENTRATED. 3. WOODEN POSTS NOT ALLOWED. 4. STEEL POSTS SHALL WEIGH 1.33 LB/LF. STANDARD DRAWING FOR TEMPORARY SILT FENCE FOR EROSION CONTROL OF TREE DIAMETER TREE PROTECTION ZONES SILTFENCE.DWG 600.00 SHEET 1 OF 1 Page: CITY OF HIGH POINT ISSUED 2-17-09 SILTFENCEOUT.DWG NORTH CAROLINA REVISIONS STANDARD DRAWING F 0 R ENGINEERING SERVICES DEPARTMENT TEMPORARY SILT FENCE WITH STONE OUTLET 600.01 APPROVED..>R�141?Y�,20.0,� �,.- FOR EROSION CONTROL ............................................. DIRECTOR SHEET 1 OF 1 IRE TREE PROTECTION ZONE RADIUS GOOD PROTECTION BETTER PROTECTION BEST PROTECTION 10 FEET 12 FEET 20 FEET 15 FEET 18 FEET 30 FEET 20 FEET 24 FEET 40 FEET 25 FEET 30 FEET 50 FEET NOTES: 1. Leave critical areas (such as flood plains, steep slopes and wetlands) with desirable trees in their natural condition or only partially cleared. 2. Select trees to be preserved before siting roads, buildings or other structures. 3. Minimize trenching in areas with trees. Place several utilities in the same trench. 4. Prohibit or restrict access to tree protection zones(TPZ). Post "Keep Out" signs on all sides of fencing and do not store construction equipment or materials in TPZ. 5. Monitor trees using a professional or train your staff to monitor tree health during and after construction on a regular, frequent basis. 6. Assign a crew member to weekly TPZ fence integrity checks. Repair and replace TPZ fencing as needed. MAINTENANCE: 1. Prune any damaged trees. In spite of precautions, some damage to protected trees may occur. In such cases, repair any damage to the crown, trunk, or root system immediately. 2. Repair roots by cutting off the damaged areas and painting them them with tree paint. Spread peat moss or moist topsoil over exposed roots. 3. Repair damage to bark by trimming around the damaged area, taper the cut to provide drainage and paint with tree paint. 4. Cut off all damaged tree limbs above the tree collar at the trunk or main branch. Use three separate cuts to avoid peeling bark from healthy areas of the tree. FINAL DESIGN O 0 U L O Z N Z O N O \ cD Z w N O U =~ mowo(7) oz z U) Y O LLJ Z LLJ 0 0 O U Z N — w g O �Zmom� LL z—�z a ao z U LLJ O O N 0 0 0 Z Ln U) o d Q Z m WU J �O N O W= -` o� W 0� V Url- (0E o IDU 0 0 0) ILI (3NV Cf) Z r N FMI 0 3 D \-- 3 J I 13 ' z 0 o N c� 0 LC) a -3:: w U Q z 0 V) W z 0< 00 W 0. — W 0 Z 0 Q z o2 00 0-..0 �� C/) < 2 w w U z LLLJ ry 00 00 0 Q W c w r z i ry LLJ Z I` 0 C/) QQ W LLJ J C,n V I 00 O M N J m N z zz a-Q oLLJ �LL1 o LLJ 00 Z Z .e LD Cl) Z H Cn Q > W N c) LL c) c) 0� 10 1~ H w W LU 7 ~ a o Z Cf) J U m c 0 'mecca O — U � N � 0 c u, o � U 0-0 ccca 0 �0 L (n cv � •— m � W J Q U w C0 CO Cnn LPL O z W > o SHEET C-11 MOE Plot Dote: 1 /25/2024 1 :38 PM Plot By: 03807 Filename: N:\WTU\Drawings\CV—STREST—DT2.dwg y 0 00 0 �T �m N 0 70 I > d Cf) U7 IJ ry >n U I� N N J \ / LO N ~ \ N z a� >> �E0 O Q�w Q J GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The perm ittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length a nd with slopes steeper tha n 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculonts. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculonts and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste conta iners at the end of each workday a nd before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH TH CAROLI NA En viron m en ter I[Quality CLEANLY Ovim stl' vm ow �Pr sm CTY. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER gV"TTM Od L�TIIAL LZAT�1 1N i1E111 a THE COMCKM VAS"M STAUCTUM SHALL K H WANn WHO THE LOD AIUM Sou AEACIE= = OF THE iTN�T1AES 31CUMNETE WA HMIT s,RUCTUE IEEtIS M K CLEARY MAN= VITH SllAMGE NOi1116 OCVICIwr i 4SAIMM (Tv.) OR !TARE= MIZk LOCATMN OETE711RIEO Or CLEANLY "mum SISRAW �aTUAL NOW DEVICE QrXLW MW L THE Cu1CIETE WASHOUT STRUCTUM SHALL K NWAMM WIN" THE Ma At WM SOLID MACHU 73K OF THE iTRUCT#EEi CAPACITY To PNOVIOE AOFaAATE CAPACITY V"" A 00I 19 Or ABOVE GRAD W1L=UT MGT SCALE STRUCTURE CONCRETE WASHOUTS 1. ❑o not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. ❑o not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, i nsta II protectio n of storm d ra i n i n let(s) closest to the washout which cou Id receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls maybe required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. ❑o not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 FINAL DESIGN U E U_ C C C C C aU o T (nv 0 C O 0 U O Z v (V Z C) N O to ZF W (V O U S~ a/ �C)WQpN O Z Z W => a Z 0 N o�Yo�'w (� N Z NWo 00 O U Jd �NC]O LLJ�Z10 CL O omW LL. UW��~O O o 000QZZ Z N�� U N Q � a- F- WU J wO N v W= W0� v� V U E oo FNV r, z a� i O M w CO z I NCB 0 W U � Q z 0 C/) W Z 0Q 0Q 11�LJ WQ Z �0 z_J o� 00 a � 0_ U)J Q ~ T LU OJ � �� Z u Q LLJ W �Z LLJ Z O Wo ~ J I LOO 0, LLJ (f) Q V) 3 N N 00 o co N J m z <o °o_ WW o o Z Z Y Q W N Z H W > ~ � U LL 0 U) W W � o z LU U 1 m �o 27' O - U � O N O I O U O! �r-M a) O 0)O Co �.� w� J Q U W in D CO LL 0 z LU > o SHEET C-12 Plot Date: 1 /25/2024 1:38 PM Plot By: 03807 Filename: N:\WTU\Drowings\CV-STREST-DT2.dwg r- 0 00 0 U) �T M o 70 I > a Cf) U7 IJ >n U 3 � N V(Z) J \ LO N ~ \ 4/_ N Z a) >v �E0 0 Q�w Q J PART III SELFANSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the ❑ivbion. (2) E&5C At least once per 1. Identification ofthe measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event? 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, b. Description, evidence, and date of corrective actions taken. (3) Stormwatc r At least once per 1. Identification of the discharge autfalls inspected, discharge 7 Calendar days 2. Date and time of the inspection, autfalls (SDCs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3, An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event? 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&5C stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required tirneframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Nan -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PARTIII SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (C) Releases of hazardous substances In excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and other Requirements (a) Visible sediment ■ Within 24 hours, an ❑raI or electronic notification. deposition in a e Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. ■ If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and 9 Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill cr release. substances per Item 1(b)-(e) above (c) Anticipated * A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [4e CFR e Within 7 calendardays, a report that includes an evaluation of the 122.41(m)(3)] and effect of the bypass. (e) Noncompliance • _quality Within 24 hours, an oral or electronic notification. with the conditions e Within 7calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). ■ Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING . K"A NORTH CAROLI NA i ��I )-) s r ,ItS:a -;Environmental Quality ors* EFFECTIVE: 04/01/19 y U E U_ C C C C a'0 C a) C, FINAL DESIGN T U)C)n ai a) 0 C 0 O O Z v N Z o N 0 c0 z 4J cN O V 2 ~ � H W O Z Z Y O V N Z N - M C)No 0 ww V z - w a �Wro�� 0 �ZmoM � LZ-�z a o �o Z � U W i7_ Zo 0 0(,�000 000QZZ Z N� r Ut/'!p =aaz�m WU J �0 N v W= W v� V U (D E Z 0o'i Door o r, Z (n CO z I C 0-0 W U � Q z 0 (n 0- Cf) _J LLJZ 0Q I— 0 p W O� - LLJ 0 z _J Z 0 00 a 0 Cn J Q ~ =wW��z of �/ 00 _ G C/') 00 Q LLJO W �Z LLJ Z ::�i_ 0 w Q J LLJ L) Q () 0 d, 3 N N 00 O co N J m N Z Z �_ o m0 Lw o Z Z Y -0 N Z H W Q > W ~ � LL 0 IU U) w W � � z o Cl) J > 1 U m �o c MU L C: N 0-- U � O N 0000 00-0 a) o �� U) L (n m-0- w� J Q U w (n D � LL w z > o SHEET C-13 Plot Date: 1 /25/2024 1:38 PM Plot By: 03807 Filename: N:\WTU\Drowings\CV-STREST-DT2.dwg Compliance Certification Form File Number: SAW-2024-00403 County: Guilford Permittee: City of High Point, Ms. Melinda King Project Name: Hamilton Avenue Stormwater Utility Upgrades Date Verification Issued: 5/13/2024 Project Manager: Laura Meyer Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS Wilmington District Attn: Laura Meyer Raleigh 3331 Heritage Trade Drive Suite 105 Wake Forest, North Carolina 27587 or laura.j.meyer@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. hereby certify that the work, and mitigation (if applicable), authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit including any general or specific conditions. Date Authorized Work Started: Completed: Describe any deviations from permit (attach drawing(s) depicting the deviations): *Note: The description of any deviations on this form does not constitute approval by the Corps. Signature of Permittee Date