October 19, 2015
CERTIFIED MAIL
RETURN RECEIPT REQUESTE�
NC�ENR, Division of Water Resources
c/o Ms. Amy Chapman Q���
1617 Mai I Service Center 1�, ��
Raleigh, NC 27699-1617 D
. n�rvuO�T 2 s 2015
Sub ject� NOD e 0 5e PIG0251 T�SP��TAT ��y ERM�7TING UN
R
North Carolina Department of Transportation
NC�WR Pro ject No. 20120240 ..
TIP No. R-2303 =
Sampson County
DeQr Ms. Chapman:
We are in receipt of the subject Notice of Deficiency dated October 12, 2015. We
have reviewed the issues and have responded as follows.
The Contractor, Fred Smith Co. and its subcontractor Wellons began laying a pipe
at Site 7 the afternoon of the 7th. The DOT staff had inspected the operation
earlier and subsequent to that time, Wellons began receiving additional wuter into
their work area. An earthen dam w4s placed in the stream to prevent wctter that
was being pumped around from back flowing into the site. When this was found by
DOT inspection staff, Wellons was directed to remove the dam and refused. Fred
Smith Co. insisted on.waiting until Mason arrived for his input.
In addition, Wellons�wus preparing to IQy pipe at Site 6 on the 8th. Upon arrival
with the Agencies, excessive turbidity w4s discovered leaving the pro ject along
5501 Barbados Boulevard, Castle Hayne, NC 28429
Phone (910) 341-2000 Fax (910) 675-0143
with silt loss. The operations were immediately shut down until the area was
restored and proper erosions measures were in place.
The DOT Resident Engineer and the inspection staff held a staff ineeting on
Monday October 12, 2015 to review the events and the details shown in the
NC�OT BMP flip book. They specifically called out the details for impervious dikes
and the prohibition uguinst using Qny erodible material even if wrapped in
geotextile. The project staff is providing additional oversite to the pipe instullation
crew to prevent recurrences.
�ivision Engineer Karen Collette, PE has scheduled a meeting with the pro ject
management team of Fred Smith Co. and the subcontractor Wellons. During thQt
meeting the �epartment will stress the importunce of ineeting all of the project
commitments and we will advise the Contractor that operations throughout the
project will receive additional oversite. Ms. Janet Russell will be assigned these two
projects and will �perform �a review on some portion euch week. Her findings will be
shured�`with the pro ject staff and Division Construction Engineer Chad Kimes.
The Department regrets this deficiency and will continue to work to eliminate any
future recurrence.
Sincerely,
Karen E. Collette, PE
Division Engineer
KEC/ww/t jf
Ec:
Richard Huncock, PE, NCDOT PDEA
Brad Shaver, US Army Corps of Engineers, Wilmington District Office
Mason Herndon, NCDWR
Stoney Mathis, PE, NCDOT, Division 3 Environmental Officer
Jerry Yarborough, CPESC, NCDOT, Roadside Environmental Engineer
Kenny Batchelor, PE, NCDOT, Resident Engineer
Chad Kimes, PE, NCDOT, Division 3 Construction Engineer
Anthony Law, NCDOT, Division 3 Assistant Construction Engineer
Michael Holder, PE, NC�OT, Chief Engineer