Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20231675 Ver 1_More Info Received_20240125
Unnamed Tributary of Three Top Creek TNC Reach 400 Rognstad Reach 236 Restoration (ft) Enhancement (ft) 125 640 Sta bi I i zati on (ft) 320 254 J-Hook Vanes 4 1 Boulder Revetment (ft) 310 165 Rootwa d Revetment (ft) 100 65 Toewood Revetment (ft) 35 0 Streambank Grading and Sta bi I i zati on (ft 1050 1088 Livesta king (ft) 1698 2266 Streambank Stabilization TNC Reach and Rognstad Reach Todd, Ashe County NC SHEETINDEX COVER 1 OVERALL SITE PLAN 2-3 PLAN AND PROFILE 1-6 4-16 TYPICAL CROSS SECTIONS 17 MORPHOLOGICAL TABLES 18 CONSTRUCTION DETAILS 19-20 EROSION CONTROL DETAILS 21-24 GENERAL NOTES: 1. STREAM ASSESSMENT DATA (LONGITUDINAL PROFILE, CROSS -SECTIONS, ETC.) PRESENTED HEREIN COLLECTED BY BFED AND CARTER LAND AND WATER DESIGN. 2. CONTOUR DATA PRESENTED IN THIS DOCUMENT IS TAKEN FROM NCDOT LIDAR DATA (2' and 10' CONTOURS). 3. HORIZONTAL AND VERTICAL GRID CONTROL TIED TO PROJECT BY BFED. SURVEY DATA USED FOR DESIGN IS RELATIVE TO ITSELF AND APPROXIMATELY SET TO REAL WORLD COORDINATES BASED ON LIDAR DATA. 4. TREES APPROVED TO BE REMOVED DURING CONSTRUCTION WILL BE FLAGGED BY THE PROJECT ENGINEER AS AN EFFORT TO PRESERVE THE EXISTING RIPARIAN BUFFER. 5. ALL TREE REMOVAL MUST BE COMPLETED BYAPRIL 1, UNLESS INSTRUCTED OTHERWISE BY USFWS. 6. NO IN -STREAM WORK SHALL BE COMPLETED BETWEEN OCTOBER 15 AND APRIL 15 FOR TROUT. EROSION AND SEDIMENT CONTROL NOTES: 1. PRIOR TO INITIATING SITE WORK, INSTALL CONSTRUCTION ENTRANCES AND SILT FENCE, AND ESTABLISH STOCKPILE AREAS. (SEE SHEET 21) 2. ONCE SITE CONSTRUCTION WITHIN AN AREA HAS CEASED ALL DISTURBED AREAS WILL BE IMMEDIATELY SEEDED (TEMPORARY & RIPARIAN PERMANENT SEED), MATTED AND STABILIZED (SEE SHEET 22). 3. LIVE STAKES AND BIODEGRADABLE MATTING STAKES WILL BE USED TO SECURE THE MATTING. 4. BROADCAST SEEDING RATES WILL BE AS SPECIFIED ON SHEET 22. 5. NATIVE SHRUB AND TREE SPECIES WILL BE PLANTED THROUGHOUT THE PROJECT AREA WITHIN A CONSERVATION EASEMENT. THE RIPARIAN PLANTING PLAN WILL BE PROVIDED BY OTHERS. 6. PRECAUTIONS WILL BE TAKEN TO KEEP HEAVY EQUIPMENT OUT OF THE STREAM CHANNEL EXCEPT WHERE ABSOLUTELY NECESSARY TO INSTALL BANK STABILIZATION/ENHANCEMENT MEASURES AND IN -STREAM STRUCTURES. 7. NO CONSTRUCTION ACTIVITIES WILL OCCUR OUTSIDE CONSTRUCTION LIMITS NOR IN ANY WETLAND AREAS AS SHOWN ON THE SITE PLANS. ALL IN -STREAM WORK MUST BE COMPLETED IN DRY CONDITIONS (SEE SHEET 23). 3TC TOPO Map (36.36483,-81.58157) USGS The Nations M'ep: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Sr-Dotaland National Transportation Dataset: USGS Global Ecosystems: U.S. Census Bureau TIGER/Line data; USES Road Data: Natural Earth Data', U.S. Department of State Humanitarian information Unit and NOAA National Centers for Environmental Information, U S. Coastal Relief Model. Data refreshetl June, 2022_ N " 0 1,000 2,000 4,000 Feet R SEAL = 046452 - FNGI /0011 l l l 1 ii i, 0 \\� 0 0 0 W 0 rr -� m zQ Y� O O U N N Sheet 1124 rt of T Reach 3668—81.57903) (3 j •/- - - - - XS2:STA-1+06. X$3 STA 2 �cov o N 3 ro v a —A L a to 0 0.CP1 ' I The Nature Conservancy 0 3700903,sso,a LEGEND �j �' POWERLINE o• �; ROADS/TRAILS PROPERTY LINES g m LONGITUDINAL EXISTING TOP OF BANK PROFILE STABILIZATION POND _ r RESTORATION BERM ENHANCEMENT WETLAND I / •------ S4 STq 2 EXISTING 2' EXISTING CONTOURS STRUCTURES o EXISTING TREES 10' EXISTING CONTOURS / ROAD nhan emen (12 )• • • • • • • PROPOSED DESIGN m m a v X$5 ,STA• 5+04 0 o = / XS7_ STA ¢+68 • . _ _ _ • • • . _ _ _ • • / / J-HOOK �� PROPOSED TOP OF ' ' _ . . . . . . . . BANK r T�G� XS8 STA 7+OS �\ �------------- -' - - -- / ROOTWAD / PROPOSED / 1 REVETMENT / ✓ CENTERLINE O • ... . ....... . .......... �� ••oF Es s/O,ySILT FENCING ''• !y� t� Q BOULDER �/ co - / : Q� ql•. amm°oco REVETMENT / Q SEAL / LIMITS OF N co ° XS9 STA 742 — 046452 — REVEMTOEWOOND / ~ DISTURBANCE " • " - " - " - " - " . " . " - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - O ••. : • o°o°o°o°o CONSTRUCTION V -0 • F • : °D°O°O°O° ENTRANCE/EXIco 0 • . • . • . . . . . . . . . . . . . . . . . . . . . I ��i�j/��`�A;N�i�NE�;.P���\��\ BANKFULL BENCHING Ci) a ,Y c.. U'o .XSJO STA 8�59 /1/III IDI I IIIC\\\\\ CHANNEL DEPOSITION STOCKPILE Z of TNC ch l J tart of Rognsta ' each .365-5,_-81.5810- XS11 TA 9onsfr\ ory \ ...... . . od Northing Easting Elevation (ft) CP1 962138.4826 1241008.572 3424.337 CP2 962238.2525 1240517.609 3404.39 CP3 961640.4467 1240318.333 3382.12 CP4 CP5 CP6 CP7 961601.8359 1239913.953 3382.93 961500.9609 1239794.351 3375.08 961295.5689 1239568.104 3373.98 961132.5519 1239347.083 3358.94 *Control points marked with nails and floggin 0 75 150 Feet Sheet 2124 LEGEND Pfa!' POWERLINE 37009031t18134 a% 000%o*00 ROADS/TRAILS/ PROPERTY LINES ( xs° Enhancement 94' 61yo xs . _ LONGITUDINAL / x 0.2p ox.. EXISTING TOP OF BANK / V PROFILE i of TNC ch STABILIZATION POND Sta izatio (80') l �� tart of Rognsta_ each _ _ _ _ _ _ _ _ _ _ _ _ _ 00 .36535,,—81.5810, , RESTORATION BERM 0 WETLAND / ' / x sO / ENHANCEMENT /' .� ox4 \ \Co/tr\ EXISTING / / o °x?oxo11 STA 9+- 'Ot' \ 2' EXISTING CONTOURS STRUCTURES ad 0p \A mess\ \ 37009031Rognst18103 10' EXISTING CONTOURS EXISTING TREES xs8 O \/st�9 Ro ROAD ancem (280' PROPOSED DESIGN Fj J-HOOK ROOTWAD REVETMENT (� Q BOULDER REVETMENT TOEWOOD REVEMENT BANKFULL BENCHING CHANNEL DEPOSITION / Scott / 3700903118074009 Enhancement ) ° a° 0 o XS19-STA 20+12 PROPOSED TOP OF / / / j / °° /. . . . . . . . . Hughes Paul BANK / j ° 3700903118145 0 / PROPOSED xsri sTA 11+S6 " CENTERLINE x / °'° / o SILT FENCING oo� • . • .......... / Ax ilization 4' � / LIMITS OF CAPS / DISTURBANCE xs1 TA 12+94 ey�o • � . 0 0 0 0 o CONSTRUCTION pp° a o°o°o°o°o ENTRANCE/EXIT / �o � STOCKPILE t�A V C . . . . Q� ' . . G R tora 'on 6' � x 0 6" \\�Q o ^ x YS14 STA,Y4 9 \ ',�j)g�• qc s �00. •/ / boo XS15 15 49/,•••••••.•••••••.•••••••.••• / Ross / / / .'.'.'.............. \ Fxlstip R \ / 3700903118074010 XS16 STA 16+04/ / / e \ men 164'/ / xs X317 STA 17�,81 / Rognstad 3700903118162 .'.'.'.' .......... ............ ........................ ............... ............. xXS18 STA 19+19••••_•••••••_•••••••_•••••••_•_•••.•_•..... ....................... ......................... • ............................... ................................ .................................. Northing Easting Elevation (ft) CP1 962138.4826 1241008.572 3424.337 CP2 962238.2525 1240517.609 3404.39 CP3 961640.4467 1240318.333 3382.12 CP4 961601.8359 1239913.953 3382.93 CP5 961500.9609 1239794.351 3375.08 CP6 961295.5689 1239568.104 3373.98 CP7 961132.5519 1239347.083 3358.94 *Control points marked with nails and flagging O O co O Q) O W O 00 O _W102 N C, m � mph DU O O U O Cu Nco / 0) o U � O Cu Z L. C�1L � N � 7 z o / Cz C �a p U O C m / P- C)21) � Sheet 3124 I The Nature Conservancy 3700903155014 34C 34C 34C m 34C �D Q z 34C 335 335 335 g Livestake planting on y k X N� p 0+00 X Ok50 o k o _ � xo zx . - . . XS1 - A C?+ 5 $ o - XS2'STA 1+00 . . . . . . . / o o s / Existing ford -$ - - - - - - - - - - - - .h 0 crossing y0 . . X$3 STA 2 -------------- TNC Reach Profile A 8 6 4 Co ro 2 m U N O O ro ro ro ro C/) C 4 x Ox00 oxti oxh ox� 1x00 rvA\xV,11 ,Lx Station �xti �xh ti"� 0 �xti 0 rr�bu 0 0 50 100 Feet CPI C QD EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL co 0 0 co ro c Q� c 0 LLI 0 Z3 O '0o, :30 C0 R U N � N = ro 0 m N m O � mph DU ZQ Y� O O U Sheet 4124 The Nature Conservancy 3700903155014 Install Boulder Revetm ft}-- Excavate a cess deposition i Re —Align channel a ayvwn,,_ from landslide. — — Install Boulder Revetment (80 ft) along bank toe. ° ".r/ Removed during 01 truction trees 12 M ° ° a° - = - - - - - - - - - ° - -Remove estimated 80 tre s 3-12" diameter) l' f °�eo - - - Xfor access within Gonstr cti n Limits, Sta ,XS6 5+7 .°x2p 4+50-7+00) _ - x xo _ °�°o _ _ _ _ _ _ _ °xoo S5 STA_ 5+04- I XS7 STA 6+68 0 x �$ XS STA 7+05 � - - - - - - - - ..... ._-_-_- -_-_- °Excavate excess - - - - - . - - ,deoositi©n 34C 33S 33S 33S 3 Pb33S c a 33S 336 336 33E 33E TNC' Ranch Prnfila R 8 4 2 N � 8 co M NpW CM+,LO G NpW ,G (pW CON G C+MMI- 4) Mh V �Mi� N 'bc°i 65 j f + rh c j N a + co Cl)+ � (p m `0 20 - o YOW ro YOW m k CU -le k ro v� Y W 2 Q M X Q M11X Q M O 'ix�0 3 Rx�o �xti k' k"1hxo0 <DXIV 16P, <Dx"J 0 �0 Station J V J J e e e 00 AX IR I co ° 0 N N 5 Cl) =md EE o z 0 0 50 100 W Feet 0 / cn EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL m N m O � mph DU � Q w O O U Sheet 5124 0 xy° Install Rootwad (25'p*,qnd ew od ° Revetment (35 ft), protec exi ting co 3 ro � / + , �' /oe o trees to the extent possib :,a: &1 Remove undercut ° / Re —Align channel away fr m erm _ trees (12") ° ° fep o - . . . . . . ° . . - Remove estimated 80 tre s 3-12" diameter) EE o °+e° . - for access within Constr cti n Limits, Sta c °x24+50-7+00) 0 p.10 - °- xS6 SSA .5+71 . oo °:00 _ _ _ °*00 S5 STA- 5+04- W I -XS7 STA 6+68 c �$ XS_8PoSTA_ 7+05 - _ _ _ _ _ _ _ _ _ _ co Excavate excess point 'X -�� - - - - ( - - - - - - bar deposition. Excavate xcess Create bankfull bench '' deposition ------- - --- -- e----------- -- --- - ------ c / x . . . . . . . . . . . . . c w ............. . °° /40 -la x� _.-.°. o -XS9 STA-7+92.-.-. ....... ...... O / o+y� xpO / Harvest 12" poplar tree to ""�+a _ . . . . . . . . . _ _ - - / °° / / allow access along berm - - - - Rognstad xa° � - Install Boulder Revetment _ v N 3700903118134 / °x _ (125 ft) along bank toe to - - - protect berm J .0y _ . . / . XS 0 STA 8+59 . . Profect 12" poplar on berm - - . . - Livestake planting only 0 50 100 (80 ft) No ° Harvest 12" maple . . . Feet A P otec ree on . . . . . . . - - - - $ streambank - - � Add 12" min fill over existing - - - - - - - - - - m N m O ¢ 2 O O U 33� 33� 335 rri 33E c a 33F 33f 33E 33F TNC Reach Profile C 4 2 8 4 N 2 X X 1x�0 A (bx�0 V Jl j �x Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL c 0 ,N U co CU �O Uttf Y a c U v m m Sheet 6124 /� � Rognstad \ / 3700903118134 Livestake planting only (80 ft)I ---_ 0 50 100 Feet / Protect existing mature Remove fallen hickory tree — Remove fallen tree debris Rognstad 3700903118103 XS� Hand —cut two trees with exposed roots Grade streambank (2:1 slope, 80 ft), / Grade bankfull bench Hand —cut poplar just / above exposed rootwad, do not remove rootwad i / o y n, / J°+°° 41 yo / o - ee /'�,�r-/- �� °° / allow access along berm i Install Boulder Revetment (125 ft) along bank_ toe to °x 00 protect berm' / .Ox, . . . 0*20 . XSJ 0 STA 8+59 . . . . . . Protect 12" poplar on berm "*/� XNo o Harvest 12" maple P to . Fee -on. / l \ str amb Add 12" min fill over existing \ culvert before crossing Use Mud Mats to cross wet a area (see Detail) - xs° \ VO Ox2p \ \Str4 \ XS1 STA 9+ \ \ion \ \ . . . - . . \\—Existing Small tobin at top of bank 10 Livestake planting only,. (90 ft) ` 2o x/ / - Excavate Bench (100 ft) Blend into upstream and Add stone to Construction k5 ° downstream floodplain contours Access Road as needed for stability. CP4 J _ - . _ _ _ _ _ _ _ _ _ Hughes Paul 3700903118145 / - *;o - XS1 -STA 1 t+S6 Rognstad Reach Profile A 0 9xrp 0x�� 9xlk� x�� x�v X1� �x�� �x�v 1xA� 0 x�� x�v X1� x�� 0 �xp x0 �� �� .� x0 XO �ti �ti .� x0 .� x5 ti� titi titi ti3 11� Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL CO3 o o o CO 3 ro d c = EE o z Oo .3; W 0 1 z 0 0 0 m N m O � mph DU O O U Sheet 7124 /� Rem poplar tree for access and grading Livestake planting only/ - _ _-`-`.`.`.`.` .`.`.`.`.`.`-`-`-`.`, o / (74 ft) �//� � / rz / N 'Hand —cut trees just above rootwads (3) CP5 - - at top of bank. �/ XS13 TA 12+94 0 Grade streambank (2:1 slope) - - - - - - - - - - - o . . . . . . . . . . . . . . . . . . . . . A . P ICo nstall J—Hook Rock Vane . . . . . . . . . . . . . for bank protection and N z grade control / / *° a) a� x Excavate scour pool � � - 0) down to bedrock / x�o \ . . . . . . . - . - . . . . . . . . W to dissipate energy Excavate berm (30 ft) composed- /// / of channel substrate to Excavate excess deposition �'j improve floodplain connectivity . . . . . ` ` ` ` . . . . / in near —bank region, use material . . . . . . . . . . . . . . . . . . . / - xwo X r9 to backfill left bank structures ,Install Boulder Revetment (90 ft) ���\ — — ` ` ' ` ` ' ' ' ' ¢ //for bank protection up to o / - - - - - - - -- inner berm elevation 'XS14 STA �4+99 \ e C/C 'Ice- M + o S / !.® XS15S,T-A15+4 Ross 9/• S �� _ — — — J Ma Main Qerm nd existing top of• bank • \ EkiS 3700903118074010 �/ / catior/alo left .bank.to protect'-flooapl ater, res rces ' .n \ �lhg Rp / w' q XS16 STA 16+04 d 332 337 337 332 ,rri 336 a 336 336 336 336 335 nstad Reach Profile B 4 2 8 6 'Con + � � - 2 + '� ° + + M. Ln' CU C/) v Y W m o x 0p co Ln c0 8 X a Q o) co X 'y3x�o �3x� �3x� �3X1 'yRk�o �x ti Station �hx V �5x� �hx 1 �16x 1\6X, O9 :a 0 50 100 0 Feet o EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL m N m O DU Q W O O U 1 Sheet 8124 / Protect xisting Sycamore if no further root exposure 336 336 336 335, m ro a 335 o' 335 335. 335 334, Scott 3700903118074009 o b. X_ 6 !. _ J X S 15 S T-A 15 + 4 9/ ' ' ' ' ' ' ' ' ' ' ' ' ' ' \ \ C e Ross MaiKtain E.erm nd• existing top of• bank • o 3700903118074010 r /�CP6 0 / ocatiorYalo IJeff .b.cnk.ta protect..floodpl 'n water res rces ' ' o XS16 STA 16+04 / / . . . . . . . . . . . . . . . . . . . . . . C/) .............................. EE / Grade Eroding Baryk (2:1�SI110 0 ' Remove tree wKh expq�sed roots ' ' Install Bo�W&' Revetment (75 W 17 A 171 / /Co Rognstad Q) 3700903118162 . . . . . . . . . . . . . . . / ••W .. . •. •. •. •. •. •. •. •. •. •. •. •. •.• 1CS18 STA 19+19 . . i...................... / Remove Sycamore and Locust (10") for access . ........................ Install Boulder Revetme XSl9-SjA 20+12 Grade Eroding Bank :1.:Slope):.:.:.:.:.:.:.:.:.:.:.: .................................. Rognstad Reach Profile C i i L + + ITS N QS K NIX, ti�'xo0 e10 �x ti Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL m N m O � mph DU � Q w O O U Sheet 9124 m m XS 1 Sta 0+65 .�U ,13 ho U .13 p�U OX00 o OXyO o OXO o 61 o 61 yx Station XS 2 Sta 1 +00 OX00 o ISR o e" o ell o ell o yX00 yXyO yx�1 Station XS 3 Sta 2+26 Mn 0 1p 50 A0 (p N13 ell o e o ell o elp o ell �x yx00 1x ti titi Station EXISTING PROPOSED CONDITION BANKFULL PROPOSED LOW WATER CONDITION SURFACE N m � mph DU O O U 0 ,N m M CO ro cu U) v a U � m m Sheet 10124 XS 4 Sta 4+25 100) 060 = ro � � Q m EE o 340 � Q � r O0 ^* W 0 0 339 NI) 30 �0 N13 o o o Ox Ox 1x i OX00 OXyO OX�O OX60 OX�O �X00 �xLO yX'i0 Station c w XS 5 Sta 5+04 cAlp,V 340 cc N m M ro 339 rn y m 338 0 0 30 �0 �0 g0 0 30 Ox Ox Ox Ox �x �x ti0 Ox Ox00 Ox�O Ox60 Ox�O yx00 yx�0 yx�0 yx�� 0 Station N m � mph DU O O U XS 6 Sta 5+71 0 340 N � Cq Y a 0 0 339 0 cu c U �Z cu C Q) Y Ua 4 338 0 30 19 y0 Q U 0" o" o" 0" o" �x�x�x U Ox00 Ox�O Ox�O Ox60 Ox�O ,yx00 1x�1 ~ Station i° m m EXISTING PROPOSED CONDITION BANKFULL Sheet PROPOSED LOW WATER CONDITION SURFACE 11124 100) XS 7 Sta 6+68 CN = ro v Qi a' ~ � � Q EE o 340 O O W Q O O 339 .O i O 338 O 0 it " "0 " �0 1p 1p ox ox ox ox ox �X 1x LO 1x O ell) el, ell ell ell yxp0 lel) yx�� 1 W Station ACV", XS 8 Sta 7+05 m Q N M 339 � a m O o o o 338 m ox ox ox ox ox 1x � px00 pXLO e" ell ell tiXpp yX10 _ U W Station O O U 0 XS 9 Sta 7+92 N co x N cU Z 339 U 0 < cu cn a � U � 338 N 0 it y0 �0 90 0 p0 ox LO ox 6ox �0 Ox 00 x Lp 30 I- e Ox Ox e0 e yx yx yx I� Station � EXISTING PROPOSED CONDITION BANKFULL � Sheet -� PROPOSED LOW WATER CONDITION SURFACE 12124 o� XS 10 Sta 8+59 O ro a N �~ Eo 0 .s; rrl W 339 a O .O i O O 338 O 10 30 y0 �0 90 10 x � Ox Ox Ox Ox Ox W ell, ell eNI) ell ell �x�0 �xg0 �Rll Station ACV", m Q N M M XS 11 Sta 9+46 0 a 0 339 m_ Cb N m O mph Q � DU O ~ O U 338 337 0 30 N 00 ox 'L0 ox x �0 ox 60 ox l0 �0 e Ox Ox e e yx yx p Station .— ro co o cu E cU X cu U C �a tTS N y FO N cc U v a� 0 EXISTING PROPOSED CONDITION BANKFULL PROPOSED LOW WATER Sheet CONDITION SURFACE 13124 XS 12 Sta 12+94 O ro ° N � = ro _ 339 O � � o O O m rb w a 338 a O� O O i N N O 337 NI)n�0 y0 A0 90 C W ox ox ox ox ox �x O 1x O ell) ell ell Ox60 ell tix00 tiXhO Station 5'bf m Q N M XS 13 Sta 12+94 0cc m 338 �0 Q �-r m 'm 0' ro m o U 0 0 0 337 ox ox ox ox ox Ox00 Ox�O e) Ox60 e(ll) ec, Station o 0 ,N T N co T Y cu XS 14 Sta 14+99 Ucu �z o 338 cu N � Q) a F° EXISTING y CONDITION ,n ro U PROPOSED C) CONDITION 337cc PROPOSED 336 BANKFULL ,�0 3o yo �0 90 ox ox ax `�0 ox ti0 ox OX00 e" ell yx00 yx�0 0 0 Sheet LOW WATER Station SURFACE 14124 R U c')co a� XS 15 Sta 15+49 c 338 O O W m a C O Q y 337 Q (/) O � i N N O 3360 W ell, ox 10 g0 OX�O oX e" ox ell',&1 ell ox OX91 Station m Q N XS 16 Sta 16+04 m " 338 d O cc 0 0 0 m �o C Q 337 ¢ O O _ U 336 ,�0 30 h0 �0 90 o o o o o 95 O ell, OXyO e" ell ell 0 Station N T L6 co T Y O XS 17 Sta 17+51 cu z EXISTING 337 cu CC va y o CONDITION U m � PROPOSED r ro _. ~ o CONDITION 0 336 a� PROPOSED 335 BANKFULL o 3o yo �o o" o" LOW WATER ell,0" OX�O OXNO ell0" Oxl'L Station Sheet SURFACE 15124 -z0) 15 o O N N N 1 � = ro 7 o O W a cn i N XS 18 Sta 19+ 19 w 0 Z 336 rb Q p ¢ m N M Q O 335 0 3o yo .Ao o" o" o" 0" z pXpO pX'L° pX�O pX60 pX1A c 0 � Station W o m 0 0 2 XS 19 Sta 20+12 m N 2 _ � Q m O U O O U 336 m ro .2o T 3350 T Y �° 0° N pp o" tip o" cu px px px px '� c U Station o z EXISTING CONDITION N c cc U �a y CQ PROPOSED ~ o CONDITION m cc PROPOSED BANKFULL LOW WATER jSheetSURFACE Typical Cross Section with Bankfull Bench Riffle Meander Pool Scour Pool Bankfull Area (A-bkf, sq ft) 45.3 69.2 71.3 Bankfull Width (W-bkf, ff) 25.0 27.0 25.0 Bankfull Mean Depth (ft) 1.8 2.6 2.8 Bankfull Max Depth (D-bkf, ft) 2.2 4.4 4.4 Bankfull W/D (Stream Type) 13.8 10.5 8.8 Inner Berm Width (ff) 20.6 22.6 20.6 Inner Berm Max Depth (ff) 1.1 3.3 3.3 Approx. Wetted Width (ff) 18.6 19.6 18.6 Approx. Wetted Max Depth (ff) 0.6 2.8 2.8 Channel Bottom Width (W-boffom, ff) 16.2 2.8 7.4 341 341 3415 341 3405 340 00 e 3415 341 3405 340 o° e 2 Typical Riffle GUSTI- Typical Scour Pool Wbkf 1I Abkf Dbkf Ox,° 0"ti° Ox3° Ox�O Typical Meander Pool Wbki 1 2 Abkf Dbkf 4 2 ti0 .LO 30 �0 oX oX ox oX _ 0 0 0 0 m m O O U ,N o CO U N � � CO CU U U m m Sheet 17124 m o v Q � � V U R ~ n Q N co 3 m `r : �~ A Q N LOLo I OO .' W 0 i a� m c w 'b x s Jg Q N 0cc a 0 0 Q U O O U c 0 ro N :Q NCIO tts � F• � U �Z O oa U o m m Sheet 18124 UT Three Top Creek - TNC Reach UT Three Top Creek- Rognstad Reach Stream Assessment Parameters Existing Condition Proposed Condition Stream Assessment Parameters Existing Condition Proposed Condition Station 0+00-9+84 0+00 - 9+01 Station 9+84 - 21+27 9+01- 20+44 Drainage Area (sq mi) 3.0 3.0 Drainage Area (sq mi) 3.0 3.0 Stream Type F3b/C3b B3/C3b Stream Type F3b/G3 B3/C3b Bankfull Area (sq ft) Avg: 47.5/ Range: 43.9-56.7 Avg: 45.3/ Range: 43.8-46.9 Bankfull Area (sq ft) Avg: 48.5 / Range: 42.6-57.5 Avg: 46.6 / Range: 43.0-57.5 Bankfull Width (ft) Avg: 30.2 / Range: 22.5-38.9 Avg: 25.0/ Range: 25.0-25.4 Bankfull Width (ft) Avg: 31.8/ Range: 23.2-41.4 Avg: 26.8/ Range: 25.0-37.7 Bankfull Depth (ft) Avg: 1.6/Range: 1.4-2.0 Avg: 1.8/ Range: 1.7-1.9 Bankfull Depth (ft) Avg: 1.5/Range: 1.3-2.0 Avg: 1.7/Range: 1.5-1.8 Bankfull Max Depth Avg: 2.3/ Range: 2.1-2.5 Avg: 2.3/ Range: 2.2-2.5 Bankfull Max Depth Avg: 2.3 Range: 2.1-2.7 Avg: 2.3 Range: 2.2-2.7 Estimated Bankfull Velocity(ft/sec) Avg: 5.6/ Range: 5.2-6.5 Avg: 6.3/ Range: 5.8-6.7 Estimated Bankfull Discharge (cuft/sec Avg: 264.0/ Range: 231.0-304.0 Avg: 286.0/ Range: 253.8-302.4 Estimated Bankfull Discharge (cuft/sec Avg: 246.8/Range: 237.1-255.6 Avg: 302.4/ Range: 302.4-302.4 Bankfull Width /Depth Ratio Avg: 19.2 /Range: 11.1-26.7 Avg: 13.8/ Range: 13.3-14.7 Floodprone Width Avg: 65.8/Range: 28.2-163.1 Avg: 99.0/ Range: 34.5-291.6 Entrenchment Ratio Avg: 2.1 /Range: 1.1-5.0 Avg: 3.9 /Range: 1.4-11.7 Bank Height Ratio Avg: 2.1 / Range: 1.2-3.7 Avg: 1.5 / Range: 1.0-2.2 Bank Height Ratio Avg: 2.2 /Range: 1.8-2.6 Avg: 1.5 / Range: 1.0-1.9 Sinuosity 1.1 1.2 Water Surface Slope (ft/ft) 0.0240 0.0265 Riffle Length (ft) Avg: 190.2/Range: 106.3-253.1 Avg: 100.7/ Range: 36.0-204.3 Riffle Length Ratio Avg: 6.4/ Range: 3.4-8.1 Avg: 4.1/ Range: 1.4-8.1 Riffle Slope (ft/ft) Avg: 0.0230/ Range: 0.0190-0.0300 Avg: 0.0365/ Range: 0.0200-0.0580 Riffle Slope (ft/ft) Avg: 0.0340/ Range: 0.0190-0.0810 Avg: 0.0385/ Range: 0.0250-0.0640 Riffle Slope Ratio Avg: 1.0/ Range: 0.8-1.3 Avg: 1.4/ Range: 0.8-2.4 Pool Area (sq ft) Avg: 48.9/ Range: 46.2-51.7 Avg: 71.3/ Range: 71.3-71.3 Pool Bkf Width (ft) Avg: 25.7/ Range: 22.4-29.1 Avg: 25.0/ Range: 25.0-25.0 Pool Bkf Depth (ft) Avg: 2.2/ Range: 1.8-2.7 Avg: 2.9 Pool Max Depth (ft) Avg: 3.5/ Range: 3.3-3.6 Avg: 4.4/ Range: 4.4-4.4 Pool Length (ft) Avg: 30.1/ Range: 20.6-56.2 Avg: 43.8/ Range: 32.0-40.0 Pool Length Ratio Avg: 1.0/ Range: 0.7-1.8 Avg: 1.8/ Range: 1.3-1.6 Pool to Pool Spacing (ft) Avg: 147.5 / Range: 31.9-297.5 Avg: 165.4/ Range: 80.0-210.0 P-P Spacing Ratio Avg: 4.7/ Range: 1.0-9.5 Avg: 6.6/ Range: 3.2-8.4 P-P Spacing Ratio Avg: 4.6/Range: 1.0-9.6 Avg: 6.3/ Range: 2.0-10.8 D50 (mm) 64.0 64.0 D84 (mm) 180.0 180.0 Estimated Bankfull Velocity (ft/sec) Avg: 5.2/ Range: 5.0-5.5 Avg: 6.7/ Range: 6.7-6.7 Bankfull Width/ Depth Ratio Avg: 20.8/Range: 11.4-32.3 Avg: 15.4/ Range: 13.6-24.7 Floodprone Width Avg: 41.7/ Range: 28.3-66.2 Avg: 57.8/ Range: 37.6-93.5 Entrenchment Ratio Avg: 1.5/Range: 1.2-2.5 Avg: 2.7/Range: 1.4-5.0 Sinuosity 1.1 1.1 Water Surface Slope (ft/ft) 0.0245 0.0275 Riffle Length (ft) Avg: 132.5/Range: 17.3-255.9 Avg: 80.4/ Range: 9.6-255.9 Riffle Length Ratio Avg: 4.2 / Range: 0.5-8.1 Avg: 3.1 / Range: 0.3-9.0 Riffle Slope Ratio Avg: 1.4/ Range: 0.8-3.1 Avg: 1.4/ Range: 1.0-2.5 Pool Area (sq ft) Avg: 56.2/ Range: 43.1-94.8 Avg: 73.4/ Range: 43.1-98.6 Pool Bkf Width (ft) Avg: 24.9 / Range: 22.4-31.6 Avg: 25.8 / Range: 23.0-30.9 Pool Bkf Depth (ft) Avg: 2.3 /Range: 1.8-3.4 Avg: 2.5 Pool Max Depth (ft) Avg: 3.8/ Range: 3.0-5.4 Avg: 4.4/ Range: 3.0-5.4 Pool Length (ft) Avg: 39.3 / Range: 20.6-61.0 Avg: 47.0 / Range: 24.3-57.7 Pool Length Ratio Avg: 1.3/ Range: 0.7-1.9 Avg: 1.8/ Range: 0.9-2.0 Pool to Pool Spacing (ft) Avg: 144.8/ Range: 31.9-309.4 Avg: 164.0/ Range: 57.0-309.4 D50 (mm) 64.0 64.0 D84 (mm) 180.0 180.0 UT Three Top Creek- Rognstad Reach Stream Assessment Parameters Existing Condition Proposed Condition Stream Assessment Parameters Existing Condition Proposed Condition Station 0+00-9+84 0+00 - 9+01 Station 9+84 - 21+27 9+01- 20+44 Drainage Area (sq mi) 3.0 3.0 Drainage Area (sq mi) 3.0 3.0 Stream Type F3b/C3b B3/C3b Stream Type F3b/G3 B3/C3b Bankfull Area (sq ft) Avg: 47.5/ Range: 43.9-56.7 Avg: 45.3/ Range: 43.8-46.9 Bankfull Area (sq ft) Avg: 48.5 / Range: 42.6-57.5 Avg: 46.6 / Range: 43.0-57.5 Bankfull Width (ft) Avg: 30.2 / Range: 22.5-38.9 Avg: 25.0/ Range: 25.0-25.4 Bankfull Width (ft) Avg: 31.8/ Range: 23.2-41.4 Avg: 26.8/ Range: 25.0-37.7 Bankfull Depth (ft) Avg: 1.6/Range: 1.4-2.0 Avg: 1.8/ Range: 1.7-1.9 Bankfull Depth (ft) Avg: 1.5/Range: 1.3-2.0 Avg: 1.7/Range: 1.5-1.8 Bankfull Max Depth Avg: 2.3/ Range: 2.1-2.5 Avg: 2.3/ Range: 2.2-2.5 Bankfull Max Depth Avg: 2.3 Range: 2.1-2.7 Avg: 2.3 Range: 2.2-2.7 Estimated Bankfull Velocity(ft/sec) Avg: 5.6/ Range: 5.2-6.5 Avg: 6.3/ Range: 5.8-6.7 Estimated Bankfull Discharge (cuft/sec Avg: 264.0/ Range: 231.0-304.0 Avg: 286.0/ Range: 253.8-302.4 Estimated Bankfull Discharge (cuft/sec Avg: 246.8/Range: 237.1-255.6 Avg: 302.4/ Range: 302.4-302.4 Bankfull Width /Depth Ratio Avg: 19.2 /Range: 11.1-26.7 Avg: 13.8/ Range: 13.3-14.7 Floodprone Width Avg: 65.8/Range: 28.2-163.1 Avg: 99.0/ Range: 34.5-291.6 Entrenchment Ratio Avg: 2.1 /Range: 1.1-5.0 Avg: 3.9 /Range: 1.4-11.7 Bank Height Ratio Avg: 2.1 / Range: 1.2-3.7 Avg: 1.5 / Range: 1.0-2.2 Bank Height Ratio Avg: 2.2 /Range: 1.8-2.6 Avg: 1.5 / Range: 1.0-1.9 Sinuosity 1.1 1.2 Water Surface Slope (ft/ft) 0.0240 0.0265 Riffle Length (ft) Avg: 190.2/Range: 106.3-253.1 Avg: 100.7/ Range: 36.0-204.3 Riffle Length Ratio Avg: 6.4/ Range: 3.4-8.1 Avg: 4.1/ Range: 1.4-8.1 Riffle Slope (ft/ft) Avg: 0.0230/ Range: 0.0190-0.0300 Avg: 0.0365/ Range: 0.0200-0.0580 Riffle Slope (ft/ft) Avg: 0.0340/ Range: 0.0190-0.0810 Avg: 0.0385/ Range: 0.0250-0.0640 Riffle Slope Ratio Avg: 1.0/ Range: 0.8-1.3 Avg: 1.4/ Range: 0.8-2.4 Pool Area (sq ft) Avg: 48.9/ Range: 46.2-51.7 Avg: 71.3/ Range: 71.3-71.3 Pool Bkf Width (ft) Avg: 25.7/ Range: 22.4-29.1 Avg: 25.0/ Range: 25.0-25.0 Pool Bkf Depth (ft) Avg: 2.2/ Range: 1.8-2.7 Avg: 2.9 Pool Max Depth (ft) Avg: 3.5/ Range: 3.3-3.6 Avg: 4.4/ Range: 4.4-4.4 Pool Length (ft) Avg: 30.1/ Range: 20.6-56.2 Avg: 43.8/ Range: 32.0-40.0 Pool Length Ratio Avg: 1.0/ Range: 0.7-1.8 Avg: 1.8/ Range: 1.3-1.6 Pool to Pool Spacing (ft) Avg: 147.5 / Range: 31.9-297.5 Avg: 165.4/ Range: 80.0-210.0 P-P Spacing Ratio Avg: 4.7/ Range: 1.0-9.5 Avg: 6.6/ Range: 3.2-8.4 P-P Spacing Ratio Avg: 4.6/Range: 1.0-9.6 Avg: 6.3/ Range: 2.0-10.8 D50 (mm) 64.0 64.0 D84 (mm) 180.0 180.0 Estimated Bankfull Velocity (ft/sec) Avg: 5.2/ Range: 5.0-5.5 Avg: 6.7/ Range: 6.7-6.7 Bankfull Width/ Depth Ratio Avg: 20.8/Range: 11.4-32.3 Avg: 15.4/ Range: 13.6-24.7 Floodprone Width Avg: 41.7/ Range: 28.3-66.2 Avg: 57.8/ Range: 37.6-93.5 Entrenchment Ratio Avg: 1.5/Range: 1.2-2.5 Avg: 2.7/Range: 1.4-5.0 Sinuosity 1.1 1.1 Water Surface Slope (ft/ft) 0.0245 0.0275 Riffle Length (ft) Avg: 132.5/Range: 17.3-255.9 Avg: 80.4/ Range: 9.6-255.9 Riffle Length Ratio Avg: 4.2 / Range: 0.5-8.1 Avg: 3.1 / Range: 0.3-9.0 Riffle Slope Ratio Avg: 1.4/ Range: 0.8-3.1 Avg: 1.4/ Range: 1.0-2.5 Pool Area (sq ft) Avg: 56.2/ Range: 43.1-94.8 Avg: 73.4/ Range: 43.1-98.6 Pool Bkf Width (ft) Avg: 24.9 / Range: 22.4-31.6 Avg: 25.8 / Range: 23.0-30.9 Pool Bkf Depth (ft) Avg: 2.3 /Range: 1.8-3.4 Avg: 2.5 Pool Max Depth (ft) Avg: 3.8/ Range: 3.0-5.4 Avg: 4.4/ Range: 3.0-5.4 Pool Length (ft) Avg: 39.3 / Range: 20.6-61.0 Avg: 47.0 / Range: 24.3-57.7 Pool Length Ratio Avg: 1.3/ Range: 0.7-1.9 Avg: 1.8/ Range: 0.9-2.0 Pool to Pool Spacing (ft) Avg: 144.8/ Range: 31.9-309.4 Avg: 164.0/ Range: 57.0-309.4 D50 (mm) 64.0 64.0 D84 (mm) 180.0 180.0 SPLASH ROCK APEX HEADER STEP ROCK 1 structure Drop FLOW -yam FOOTER ROCK SECTION A (APEX OF HOOK) N.T.S. J-HOOK STEP ROCK VANE EDGE OF) SLOPE TOP TO f-AT NORMAL RIFFLE W W S APEX ROC SECTIONC (HOOK CUT-OFF SILL) SILL) t1` (see Note N.T.S. + HEADER ROCK y W r FOOTER ROCK © W SPLASH ROCK TOP OF BANK W (E W %j W - W Yi,W �Y AD .( y (� APEX ELEVATION, Structure Table) �w y t ARM LENGTH (see Structure Table) 7• _ , fW -STREAM LENGTH (see Structure Table) BACKFILL < EXISTING �- (see Note 2-3) - STREAMBED GEOTEXTILE LINER W % +FO®TE PROPOSED (see Note 4-5) ROCK CUTOFF w +ROE 1 STREAMBED SILL 12' mirrl + 1 / t j SECTION B (VANE ARM) N.T.S. If // I. POO N Bankfull Max Depth ARM BANKFULL TIE-IN A- Height (see Note 9) + +j ARM APEX .r. -r - ---"- ---- .- f GLIDE -Top of BanklBankfull ,y j XCAVATE Fl , 4%' =r, . +SC UR POOL i Bank Toe HEADER W CKFILL WITH LLUVIAL GRAVEL/COBBLE MIX (lee Note 2-3) ® W @EOTEXTILE LINER W �Y r ARM BANKFULL TIE-IN � ELEVATION, (see Note 9, ,1 / Structure Table) ROCK CUTOFF SILL 12' min. V[ W W EXISTING STREAMBED W " Bankfull *kithPR FOOTER O POSED STREAMBED .W W ARM PROFILE VIEW W N.T.S. PLAN VIEW\'/ W N.T.S. J-Hook Rock Structure Table J-Hook Station Apex Thalweg EL (ft) Arm Apex EL (ft) Apex Bankfull EL (ft) Arm Bankfull Tie -In EL (ft) Arm 3/4 Bankfull Tie -In EL (ft) Total Structure Drop (ft) 1 4+22 - 4+50 3395.10 3395.10 3397.30 3396.70 3396.20 0.60 2 5+02 - 5+28 3392.90 3392.90 3395.10 3394.50 3394.00 0.60 3 5+86 - 6+13 3390.20 3390.20 3392.40 3391.80 3391.30 0.60 4 6+87 - 7+13 3387.30 3387.30 3389.50 3388.90 3388.40 0.60 5 15+04 - 15+30 3366.10 3366.20 3368.30 3367.80 3367.30 0.50 Structures are keyed in at 3/4 bankfull elevation, 0.5' below bankfull/top of bank Structures will be staked out by construction oversight staff prior to construction Notes: 1. Header, Footer, and Sill Rocks shall be min. 3' dia. long axis, min. 2' dia. intermediate axis, and min. 2' dia. height. 2. Vane Arm Header and Footer Rocks shall be backfilled with alluvial material composed of a gravel -cobble mix if suitable size and consistency is available. Suitable Backfill shall have a min. median diameter of approximately 2", and shall not exceed 9". The material shall drain quickly, and support weight without shifting or sinking. Larger diameter rocks can be used at the apex of the arm wedge for scour protection, installed below the Arm Apex Elevation. Do not use sod or soil to Backfill behind the vane arm. Topsoil along the vane arm shall be no more than 1-2" depth if seeding for temporary erosion control and shall not extend above the elevation of the header rocks. 3. Backfill behind the vane arm flush with the header rock elevation until meeting the Streambank contour. 4. For finer sediment substrates, outside gravel shall be brought in for backfill or Geotextile Liner shall be installed (see #3 below). Footer Rocks shall be supported with a layer of stone to prevent sinking or ROCKS Structure Dimension Table Parameter 1/3 Bankfull Width 8.3 Vane Arm Angle (deg) 18.0 Stream Length (ft) 25.6 Vane Arm Length (ft) 26.9 Vane Slope (%) 0.041 Vane Arm Height (ft) 1.1 Bankfull Max Depth (ft) 2.2 3/4 Bankfull Max Depth (ft) 1.7 Structure Grade Drop (ft) 0.6 Notes: Structures keyed in at 3/4 bankfull max depth, or0.5' below bankfull elevation shifting, as approved by the Project Engineer. 5. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Place liner behind the arm (upstream side), draped from top of rock structure to bottom of footer rock and extend a minimum of half the trench bottom width. Trim excess or visible fabric. 6. At the structure apex, extend Footer Rock below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max pool depth associated with the structure). 7. Step Height is the Total Structure Drop of the water surface. Maximum water surface (structure) drop across the Apex Rock is 0.6' measured along the stream thalweg. See Section A and Structure Table. 8. There are no gaps between Apex Rocks when installed on bedrock, in small streams or in high bedload streams such as UT Three Top Creek. Thalwea elevation shall be at the toD of ADex Header Rocks. 9. Structures will be keyed in at 3/4 bankfull max depth. 10. After vane arms are installed, stabilize all disturbed streambank with Riparian Seeding, Streambank Matting, and Livestakes (see Details). N TOEWOOD REVETMENT Streambank t, (see Existing Gr( Normal Flow Proposed Grou Elevation Anchor Rock \ Rootwad-\ Riffle or Footer SECTION A N.T.S. Restore disturbed areas with Riparian Seeding (see Detail) Wooden Stake -Woody Debris np� Backfill with suitable alluvial material (see Note 7) Anchor Rock Edge of Water Rootwad at Normal Flow Footer Log Woody Debris Toe of Bank AL \' Top of 1 Bank t (Bankfull) Backfill with suitable alluvial material (see Note 7) A PLAN VIEW N.T.S. _ co �0) = ca o tn^ rt Ci M r: ~ co co = m � a- O O 0 0 N � mm OU O O U Notes: perpendicular behind rootballs. 1. Toewood Revetments consist of large woody debris 6. Rootwads shall be angled at 2-3% slope downward (logs, branches, shrubs) and rootwads installed at back into the bank in order to maintain saturation. co various angles along the toe of bank slope in order 7. Backfill Toewood Revetment with gravel alluvial rock to narrow the low flow channel along riffles/runs. material, if suitable size and consistency is available. t11 Toewood Revetments improve flow, prevent Suitable backfill shall drain quickly and support y mid -channel bars, and encourage deposition on the weight without shifting. Add backfill as Toewood is Y newly created bench. layered in. For fine sediment substrates, support +-. to 2. Extend the width of the Toewood into the channel in Footer Logs with a layer of stone to prevent sinking order to bring the bank toe inward, repairing the or shifting, as approved by the Project Engineer. c z eroded section. Blend the ends of the Toewood 8. Place Rock Sills (min. 2' dia.) along the upstream and v Revetment in with the bank toe line at the upstream downstream edges of the Toewood Revetment. a1 0 and downstream bank toe. Extend the depth of the 9. Extend Rock Sill laterally 12' into the bank from the y I' Toewood a min. 2' below the proposed substrate front Toewood elevation back to the inner berm elevation, or down to bedrock, which ever is elevation within the bank. Extend Rock Sill vertically 0 U shallower. Extend the height of the Toewood up to 2' min. below the proposed substrate elevation. lZ Ip the inner berm elevation to create a bench for 10. Any Rocks that must be stacked to create the Sill U deposition. shall be offset 6" towards Toewood for stability. 3. Place Toewood at various angles, but not directly 11. Anchor Rocks (min. 2' dia.) shall be placed on top of parallel to flow to avoid scouring. Layer Toewood Toewood to effectively weigh the mass down and with larger material and rootwads on the bottom prevent floating until saturation is achieved. and smaller branches on top. Compact layers as 12. After Toewood Revetment installation, backfill they are installed. Streambank with clean soil fill material and compact 4. Rootwads shall consist of 8-10" dia. hardwood trees at the proposed bank angle. with 15' trunk and 3min. root ball dia. Trunks shall be 13. Stabilize streambanks with Riparian Seeding, Erosion Sheet relatively straight and free of breaks. Control Matting, and Livestaking (see Details). 5. Install Rootwads at 6' spacing, directed upstream into flow with no more than a 15' departure angle 19/24 from the bank, and on top of Footer Logs laid BOULDER REVETMENT RESTORE DISTURBED AREA WITH RIPARIAN SEEDING (see Detail) STREAMBANK MATTING (see Detail) EXISTING GROUND BANKFULL ELEVATION PROPOSED GROUND WOODEN STAKE HEADER ROCK, STREAMBED gA KFILL WITH C SUITABLE FOOTER ROCK ALLUVIAL MATERIAL GEOTEXTILE LINER (see Note 7) (if needed, \see Note 3) SECTION A N.T.S. TOP OF Fcpw A BANK �� (BANKFULL) EDGE OF WATER AT NORMAL FLOW \ HEADER ROCK ROCK SILL FOOTER ROCK TOE OF BANK SLOPE A PLAN VIEW GEOTEXTILE LINER BACKFILL WITH SUITABLE N.T.S. slee Note 3) (seeUN to 7 ATERIAL Notes: 1. Boulder Revetments shall be installed along the base of the design streambank toe at locations and stream lengths designated in the Site Plans. 2. Footer, Header, and Sill Rock shall be min. 3' dia. long axis, min. 2.5' dia. intermediate axis and min. 2' dia. height. 3. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Geotextile Liner shall be installed if backfill is fine-grained, as approved by the Project Engineer. Place Liner behind all rock layers and key in at the bottom. Trim excess or visible fabric. 4. Footer Rocks shall extend below scour depth or to bedrock, whichever is shallower. The scour depth is estimated to be the max. pool depth near the structure, unless otherwise specified. 5. Header Rocks must extend upwards above the normal flow water surface and have an even grade along the length of the Revetment. 6. Install two or more Header Rocks overlain and offset backwards moving up the bank if existing substrate elevation is below that needed for Header Rock to extend up to normal flow elevation or if additional protection is needed for exposed tree roots or other bank feature. Do not exceed the inner berm elevation. 7. Footer Rocks and Header Rocks shall be backfilled with gravel alluvial material, if suitable size and consistency is available. Suitable backfill shall have a minimum median diameter of 2" and not exceed 6" dia. It shall drain quickly and support weight without shifting or sinking. For fine sediment substrates, outside gravel may be needed for backfill and Footer Rocks shall be supported with a layer of stone, as approved by the Project Engineer. 8. After Boulder Revetment has been installed, backfill streambank with clean soil fill material and compact at the proposed bank angle. 9. Stabilize streambank with Riparian Seeding, Streambank Matting, and Livestaking (see Details). ROOTWAD REVETMENT RESTORE DISTURBED AREAS WITH RIPARIAN SEEDING (see detail) STREAMBANK MATTING (see Detail) NORMAL FLOW EXISTING GROUND ELEVATION PROPOSED GROUND ANCHOR ROCK (see Note 8) \ Pr)r)TWArh nA STREAMBED SCO POOL FOOTER FCOw � EDGE OF WATER AT NORMAL FLOW - 4�1 Notes: 1. Rootwad Revetments are placed along pool facets experiencing high shear stress along the bank toe where scour protection, flow deflection, and habitat are desired. Place Rootwad Revetments at the length and location shown on the Site Plans to provide toe protection. 2. Rootwads shall consist of a 12"-18" dia. hardwood tree with 15'-20' trunk and 4' min. root ball dia. Trunks shall be relatively straight and free of breaks. 3. Rootwads shall be installed directed upstream into flow with no more than a 151 departure angle from the bank. 4. Space Rootwads so that root balls overlap 6" min. to create an integrated revetment. 5. Rootwads shall be angled at min. 2-3% slope downward back into the bank in order to maintain saturation. 6. Footer Rocks shall be min. 2.0' intermediate axis dia and placed at a depth sufficient to prevent scour and to allow for greater than half of the root ball to extend below the normal flow elevation, in order to maintain saturation. Scour depth is estimated as the proposed pool depth, unless otherwise stated. 7. Bracing Rocks shall be 12-18" dia. and placed near the base of the root ball with no gaps. Rocks shall BANKFULL ELEVATION WOODEN STAKE RACING ROCK ETWEEN ROOTWADS K BACKFILL WITH SUITABLE Section A ALLUVIAL MATERIAL (see Note 9) N.T.S. TOP OF BANK �(Bankfull) / ANCHOR ROCK (see Note 8) BRACING ROCK FOOTER ROCK TOE OF BANK SLOPE BACKFILL (see Note 9) Plan View N.T.S. be placed between Rootwad trunks and at either end of Rootwad Revetment to prevent Rootwads from shifting. 8. Anchor Rocks shall be 12-18" dia. and placed on top of Rootwad trunks near the base of the trunk, offset back into the bank to achieve streambank slope (see Note 11). 9. Footer Rocks and Bracing Rocks shall be backfilled with gravel alluvial material, if suitable size and consistency is available. Suitable backfill shall have a min. median diameter of 2" and not exceed 6" dia. It shall drain quickly and support weight without shifting or sinking. For fine sediment substrates, outside gravel may be needed for backfill and Footer Rocks shall be supported with a layer of stone, as approved by the Project Engineer. 10. Excavate scour pool out in front of Rootwads to the proposed pool depth (see Longitudinal Profile) 11. After Rootwad Revetment has been installed, backfill streambank with clean soil fill material and compact at the proposed bank angle. Backfill shall start at top of Anchor Rock and extend upwards at 3:1 slope. 12. Stabilize streambank with Riparian Seeding, Streambank Matting, and Livestaking (see Details). Nco � mm OU O O U cV CU N c 0 ro ,N ro co CU c c cU oz co �a m Q U m m Sheet 012 TEMPORARY CONSTRUCTION ENTRANCE/EXIT V 0' min. Paved Road V r Clean washed stone 2"-4" dia., 8" depth underlain with Geotextile Fabric Temporary Drainage Pipe, as needed Plan View N.T.S. Existing —50' min Ground < p/ slo e i"Z Paved Road Clean washed stone 2"-4" dia., J 1 8" depth Non -woven Geotextile Fabric shall be placed under entire width/length of Temporary Drainage Pipe, stone as needed 3" min. undercut prior to Section View placement of stone N. T. S. Notes: 1. Temporary Construction Entrance specifications are described in North Carolina Erosion and Sediment Control Planning and Design Manual (2013) Std and Spec 6.06. 2. Replenish stone when surface rock becomes compressed < 8", stone becomes covered with fine sediment, or sediment is visible on the paved road. Steel Post Wire/Plastic Ties 9 —J Bottom of Trench Wire Fence (if applicable) Geotextile Fabric Backfill and compact soil F,aw Existing r Ground 8" j min. 4 11 min. Steel Section View N.T.S. Max. 6' Spacing without fence Max. 8' Spacing with fence Fabric Plan View N.T.S. SILT FENCE NI 24" Existing CO Ground 0 24" c-1 Notes: 1. Silt fence shall meet the requirements of the NC Erosion and Sediment Control Planning and Design Manual (2013) Std and Spec 6.62. 2. Do not install silt fence across areas of concentrated flow, including streams, ditches, or waterways. 3. Silt fence is limited to fill heights of 10 ft or less, and shall not exceed slope length corresponding to drainage area size and slope (Table 6.62a). 4. Steel posts shall be 5' min. length, with 1.25 lb/linear ft steel. Wooden stakes are not allowed. 5. Geotextile fabric shall comply with specifications in Table 6.62b. If Wire Fence reinforcement is needed, wire shall be 14 gauge min. with max. 6" mesh spacing and extend to bottom of trench. 6. Wire or Plastic ties shall have 50 lb tensile strength min. 7. When two separate sections of geotextile fabric adjoin each other, they shall overlap by 6" and be double folded. 8. Geotextile fabric shall be fastened with plastic or wire ties securely to the posts at the top, vertical midpoint and bottom of geotextile fabric. 9. The distance between the toe of the fill to the silt fence shall be a minimum of 5'. �O0) o M 0 N N 5 GO_ N NLoo Q I 12 OO W 0 m N m a � mph DU ZQ Y� O O U Sheet 211241 11 PUMP SANDBAG DAM NON -PERMEABLE MA\--, VERIFY HOSE DIAMETER AND PUMP SIZE ADEQUATE TO DRAIN SAND BAG TEMP DAM PUMP AROUND DETAIL HOSE "IN -STREAM" WORK — LOCATION - Notes and Construction Sequence 1. Pump around shall be used at flows that can be diverted using standard 6" pump (5 cfs). During higher flows, use Temporary Diversion (see Detail). If excessive channel modification is required for Pump Around, use Temporary Diversion (see Detail). 2. Clear area for temporary dam of debris. 3. Layout hose and pump along route adequate to allow for proper installation of culvert. 4. Provide splash pad at outlet of hose to spread and slow velocity of flow before reentering live stream flow. 5. Install Sandbags or Rip Rap (NCDOT Class B) perpendicular to flow of water. 6. Allow for overflow weir -4' min width and -1.5 min depth. 7. Overlay dam structure with non -permeable plastic or similar material. 8. Begin pumping process, with regular monitoring to ensure hose diameter is adequate to carry flow and check to ensure filter at hose inlet does not clog and restrict flow. 9. If "In -stream" work extends beyond one day, open weir section of sand bags to allow flow through work area overnight. TEMPORARY DIVERSION BERM EDGE OF WATER AT NORMAL FLOW TOP OF BANK (BANKFULL)� _ RIP -RAP I LEVEL SPREADER W �W FABRIC ON STREAM SIDEIDE OF OF BAG OVERLAPPING TOP W I' / AND BOTTOM EXCAVATION W SITE IW . A r . j. BULK BAG W PLAN VIEW N.T.S. Notes: 1. Install Temporary Diversion Berms around in -stream excavation areas to divert flow and reduce sedimentation in areas were flow exceeds 5cfs or channel is too wide for pump around scenario. 2. Diversion can be carried out with Bulk Bags (see Drawing) or Alluvial Cobble/Gravel Material, as determined by Project Engineer. 3. Ensure Bulk Bags or Alluvial Material are sealed using Geotextile Fabric as necessary to prevent surface flow into excavation site. 4. If groundwater enters the excavation site, pump groundwater out to allow for dry work conditions. Discharge pumped water downstream > 50ft from stream into well vegetated filtration areas. Ensure discharged water is not turbid when re-entering stream. Bulk Bag Diversion 5. When moving Bulk Bags, lift bags vertically using a heavy duty strap or chain pulled through the four corner straps only. Ensure Bags remain upright, do not use Bulk Bags that are damaged, punctured, or leaking soil. 6. Fill Bulk Bags with gravel and small cobble only, no fine sediments or sand are allowed in the stream. Alluvial Cobble/Gravel Diversion 7. After construction activities, remove Alluvial Material and restore streambed to design elevation. BULK BAG: L=3.0ft H=3.33ft W=3.0ft Minimum Capacity = 1 ton Minimum Size = 30 cubic feet or greater 0 I FLOW H: Short Axis (Height) L: Long Axis (Length) W: Intermediate Axis (Diameter) A ,—) TRENCH GEOTEXTILE FABRIC INTO STREAMBED AND BACKFILL WITH ALLUVIAL MATERIAL. SECTION VIEW A _c y =( o c O ^ 7 � '0 M ^ r = N M] ~ Eo c� 0 W a c Q) rn OLL 0 IC O 1LK BAG co � map OU FLOW w O O U ,VIAL ,OR (AT EXCAVATION SITE) N.T.S. c 0 ro ,N coO �co CU O ca o co oz O C �a O -c U � Q O U O co W H, Sheet 231241 NU 1 L: PLANTING WIDTH WILL VARY BASED ON LANDOWNER COMPLIANCE AND PROJECT SPECIFICATIONS. rWIN vitvv SYMBOL DESCRIPTION NATIVE SOD MATTING AND/OR EROSION CONTROL FABRIC ARE TO BE PLACED ON NEAR BANK AND DISTURBED AREAS WHEN AVAILABLE. 1. SEED IMMEDIATELY WITH TEMPORARY RYEGRASS. 2. FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH A PERMANENT GRASS/HERB MIXTURE. MATTING AND FABRIC ARE TO BE STAKED DOWN WITH LARGE STAPLES AND/OR NATIVE/WOODY STAKES. 3. PLACE LIVESTAKES IN TWO ROWS WITH 5' SPACING BETWEEN ROWS. LIVESTAKE SPECIES INCLUDE: Cornus amomum, Physocarpus opulifolius, Salix serecia, Sombucus canadensis. ANY SUBSTITUTIONS MUST BE APPROVED BY PROJECT ENGINEER. TYPICAL CHANNEL RE -VEGETATION PLAN VIEW DETAIL DESCRIPTION NATIVE TREE AND SHRUB (BAREROOT OR 1-3 GALLON 2ONTAINERS) SPECIES TO BE PLANTED AT A DENSITY SUFFICIENTTO PROVIDE 400 TREES/ACRE AT MATURITY FLOODPLAIN SPECIES INCLUDE BUT ARE NOT LIMITED TO: Genus Species Acer rubrum Common Name Maple, Red Betulo olleghoniensis Yellow Birch Cephalanthus occidentalis Buttonbush Corpus amomum Dogwood, Silky Hamamelis Arginiono Witch Hazel Undera benzoin Spicebush Uriodendron tulipifera Poplar, Yellow Oxydendrum orboreum Sourwood Physocorpus sp. Ninebark Platanus occidentalis Sycamore Prunus serotino Cherry, Black Quercus rubra Oak, Northern Red Quercus shumardii Oak, Shumord Sambucus nigra canadensis Elderberry, Common Solix nigra Willow, Block Tilia americans Basswood ANY SUBSTITUTIONS MUST BE APPROVED BY PROJECT NGINEER. 'DO NOT PLANT BETULA NIGRA OR JUGULANDS NIGRA. SOD -MATTING OR COCONUT MATTINGAPPLIED TO NEARBANK AREAS OF DISTURBANCE EROSION CONTROL MATTING 12" 4" 6„ IIIIIIII — 6„ 4" 6" AB C T t��=111=1I II CRITICAL POINTS A. Overlaps and Seams IIII NOTE: B. Projected Water Line • *IN LOOSE SOIL CONDITIONS, C. Channel Bottom/Side THE USE OF STAPLE OR STAKE Slope Vertices ` LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO A ` ' III PROPERLY SECURE THE �B �C III—� _ —III — BLANKETS. —ICI=ICI =III —II � SLOPE INSTALLATION INSTRUCTIONS: 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS IN DIRECTION OF WATER FLOW. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON BLANKET TYPE. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE BLANKET WIDTH. 5. PLACE CONSECUTIVE BLANKETS END -OVER -END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" APART AND 4" ON CENTER TO SECURE BLANKETS. 6 FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 7. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5-12.5CM) (DEPENDING ON BLANKETS TYPE) AND STAPLED. TOP OF TERRACE COMBINATION OF CONTAINER OR BARE -ROOT NATIVE TREES &/OR SHRUBS (SEE RIPARIAN PLANTING � PLAN FOR SPECIES) WATER Lai GN—UNIN]3UILei \I LIVESTAKES PERMANENT RIPARIAN SEED MIX: APPLY AT 20 LBS PER ACRE OF DISTURBANCE (per specifications of seed supplier): ERNST CONSERVATION SEED MIX ERNMX-304 (NC MOUNTAINS RIPARIAN MIX). SPECIES "NOT PREFERRED" IN THIS MIX PER USFWS: Switchgrass, Virginia wild rye, Blue vervain, Solidago odora ALLOWABLE SUBSTITUTIONS IN THIS MIX PER USFWS: River Oats (Chasmanthium latifolium), Solidago nemoralis ADDITIONAL SPECIES LIST CAN BE PROVIDED BY THE PROJECT ENGINEER TEMPORARY SEED MIX AND SPECIFICATIONS: Common Name Scientific Name Rate per Acre Optimal Planting Dates Rye grain Secale cereale 30 Ibs Jan 1- May 1 Common oats Avena sativ 70 Ibs German millet Setaria italica 15 Ibs May 1- Aug 1 Common oats Avena sativ 70 Ibs Rye grain Secale cereale 30 Ibs Aug 1- Dec 31 Winter Wheat Triticum aestivum 30 Ibs Seedbed Preparation: Disturbed soils within riparian areas will be amended to provide an optimum environment for seed germination and seedling growth. Surface soils will be loose enough for water infiltration and root penetration. Lime will be added to the soil to ensure a pH level between 5.5 - 7. Fertilizer (18-46-0) will be added to nutrient deficient areas. All riparian areas will be raked to loosen compacted soil prior to seeding. �00) co o� O c = CU v S m A EE O Z T 0 .' LLI 0 Z3 O Co Z 0 0 0 0 m N m a � mad DU Q w O O U N M N m Sheet 221241 100) o� MUD MATS60 0 � � N 5 ai ~ t m c Lo 0 W Wet areas, depressions, m N � mph O O m DU U tributaries, or drainage ditches c 0 ,N Notes: p 1. Mud mats shall be used within the Construction Access Path to cross o z wetland areas for accessing the stream and staging areas while limiting a disturbance to the existing terrain. o 2. Mud mats are commonly available for purchase or rental, dimensions may vary. o CL 3. Mud mats can be stacked or place in a variety of ways to get equipment o �° and materials to the work site with minimal disturbance. W 4. Some minor grading may be required to prepare surface for the use of mats (See Overall Site Plan for Construction Access Path route). �- 5. Limit site clearing to the area required for the access route, do not enter wetland areas when installing. 6. After work is completed, re -grade the site to a natural appearance, seed Sheet and mulch, and plantings of appropriate wetland vegetation when required. �24124