Loading...
HomeMy WebLinkAboutNCC220409_NOT Closeout Documents_20240219 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Orange Project: Lake Orange CIP-Proj 1 -EC Barrier River basin: Neuse Person financially responsible:Orange County-Bonnie Hammersley,County Project#: ORANG-2021-006 Manager Address: P.O.Box 8181,Hillsborough,NC 27278 1. Project Location: Lake Orange Road,Cedar Grove Pictures: Yes-Digital 2. Weather and soil conditions: Cloudy,dry Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? If no,check violations below: Yes 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): N/A Title: N/A Inspection report: Sent Report Date given/sent: February 06,2024 (email) 9. Corrective action needed: 10. Comments: No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. If you need assistance with the NOT process,contact Kieu Tran(kieu.tran@deq.nc.gov or 919-707-3640). Reported by: Bill Denton Others present: N/A Date of inspection: January 26,2024 Time arriving on site:2:00 PM Time leaving site:2:40 PM CC: