Loading...
HomeMy WebLinkAboutSW4231203_Email_20240120 Peck, Kaitlin From:Farkas, Jim J Sent:Saturday, January 20, 2024 8:17 PM To:tbunker@sagamorehomes.com; pstimpson@labellapc.com; Justin Nifong Cc:svc_post_construction_stormwater; Peck, Kaitlin Subject:RE: SW4231203; Noland Farm (Davidson) Attachments:Fast Track Final Cover Letter & Permit_DRAFT 1-20-24.pdf Mr. Anson and Mr. Nifong: Please note that in accordance with 15A NCAC 02H .1044(5)(b), the Division is providing you with a dra? permit with special condi?ons per 15A NCAC 02H .1044(6). You have calendar 10 days (un?l close of business on Tuesday, January 30, 2024) to submit comments or concerns for the a?ached dra? permit back to the Division (or address the comments). Once either the 10 days have passed or you have responded to this email with your comments/concerns on the dra? permit, whichever occurs first, the final permit will be issued for this project. If the comments in A?achment D are addressed within the 10 day window, the highlighted sec?ons of the permit (in addi?on to the date of issuance) will be edited before final approval (the references to Sec?on D & the minor devia?ons will be removed and the drainage area sec?on will be revised to reflect the two dis?nct drainage areas of this project). If you have any further ques?ons, do not hesitate to reach out to me. Thanks, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Monday, December 11, 2023 12:35 PM To: tbunker@sagamorehomes.com; pstimpson@labellapc.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Eplin, Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater <postconstruction@deq.nc.gov> Subject: SW4231203; Noland Farm (Davidson) 1 Good A?ernoon, We received your post-construc?on stormwater permit fast-track final applica?on for the subject project on 12/7/23. Reviews under the Fast-Track permi?ng process can take up to 40 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruc?on@deq.nc.gov (We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. h?ps://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Addi?onal file types can be entered into the electronic form by clicking on the “Add Another Post-Construc?on File Upload” link directly below the “State Stormwater Informa?on Uploads” sec?on of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding addi?onal file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload en?re plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selec?ng the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as ligh?ng plans, u?lity plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SW4231203 This project will be reviewed by Jim Farkas, if you have any ques?ons, please contact them at postconstruc?on@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construc?on Stormwater Permi?ng Group North Carolina Department of Environmental Quality postconstruc?on@deq.nc.gov From: Peck, Kaitlin Sent: Wednesday, November 29, 2023 1:31 PM To: tbunker@sagamorehomes.com; pstimpson@labellapc.com Subject: RE: Noland Farm; Davidson County 2 This email is to correct Paul S?mpson’s email. Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Peck, Kaitlin Sent: Wednesday, November 29, 2023 1:12 PM To: tbunker@sagamorehomes.com; pstimpson@laballapc.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: Noland Farm; Davidson County Good Morning, We received your application for a Final Fast-Track post-construction stormwater permit on 11/22/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 12/29/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section 12.14(e)(2)):  Please be aware that, effec?ve October 3, 2023, our permit applica?on fee structure is as follows:  New Permit or Major Modifica?on for a project with one (1) or fewer SCMs = $1,000  New Permit or Major Modifica?on for a project with two (2) SCMs = $1,250  New Permit or Major Modifica?on for a project with three (3) SCMs = $1,750  New Permit or Major Modifica?on for a project with four (4) or more SCMs = $2,250  Minor Modifica?on = $250  Renewal = $750  Transfer = $750  Renewal & Transfer Combina?on = $1,500  General Permit = $700  Per the submi?al items, this project will require an applica?on fee of $1000 as this applica?on is for a New Permit for a project with no SCMs. Please provide a new applica?on fee check in this amount so that we may process your applica?on. We will void and return the provided applica?on fee check to the permi?ee (unless a different return address is indicated by close of business tomorrow). 3  2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application):  Section II, 5 – This project does appear to be located within 5 miles of a commercial airport. Please refer to this map (https://www.ncdot.gov/divisions/aviation/Pages/nc-airports.aspx). If you believe that this project is located within 5 miles of a commercial airport, please provide the airport information (name & location).  Section IV, 10 – Please use the information for the first named surface water (“Beaverdam Creek”, “C”, & “12-113-4”) for the receiving stream name, classification and index number.  Sec?on IV, 10 – “Total Drainage Area (sf)” was le? blank. Please revise.  Sec?on IV, 10 – “On-site Drainage Area (sf)” was le? blank. Please revise.  Sec?on IV, 10 – “Off-site Drainage Area (sf)” was le? blank. Please revise.  Sec?on IV, 10 – “Proposed Impervious Area** (sf) was le? blank. This should match the value for “Total (sf)” found in the Impervious Surface Area table. Please revise.  Sec?on IV, 10 – “% Impervious Area** (total)” was le? blank. Please revise.  1x hard copy of the complete, original signed Supplement-EZ Form (This item is required per Sections V & VI, 3 of the Application). This form can be found on our website at the following address: https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: Please provide an original signature. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 4 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deq.gov or at (919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construc?on Stormwater Permi?ng Group North Carolina Department of Environmental Quality postconstruc?on@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 5