Town of Liberty, XC
Wastewater Treatment r1'Cant
and
CoCCection System
2023 Annuaf Xeport
Table of Contents
I. General Information
Name of Regulated Facilitv
Responsible Persons
Permit Number
II. Perfonnance
Permit Limit Violations 2021
Monitoring and Reporting Violations
Overflows at the Wastewater Treatment Plant
Overflows in the Collection System
Description of Corrective Measures
M. Notification
IV. Certification
I. General Information
Name of Regulated Facility
Town of Liberty
The Town of Liberty is permitted through the State of North Carolina to operate a spray
irrigation wastewater treatment facility and operate the wastewater collection system.
Responsible Persons
Elix T. Fike is the treatment plant operator responsible in charge (ORC).
Kevin Coble is the collection system operator responsible in charge (ORC).
Scott Kidd, Town Manager is the responsible person for the Town of Liberty facilities and can be
contacted at (336) 622-4276.
Permit Number
Wastewater Treatment Facility Permit Number: WQ0003090
Wastewater Collection System Permit Number: WQCS00280.
The wastewater treatment facility is a spray irrigation system located at 7178 East Highflll
Avenue. The treatment process consists of a manual bar screen, a lagoon, chemical treatment,
and effluent pump station. The Town is permitted for 550,000 gallons per day of sewage. The
sewage enters the plant and goes through the bar screen which removes all solids. The solids
are removed and disposed of by Allied Waste. The flow then proceeds to a three (3) pump
influent station that pumps the sewage to the lagoon. The lagoon is a natural occurrence system
that separates the remaining solids from the liquid. The solids settle to the bottom of the lagoon
with the water staying to the top. After a 88 day detention time, the water is then treated with
chlorine to remove all fecal coliform bacteria. The next process is to spray the effluent onto the
spray fields. We maintain one hundred eighty (180) acres of spray fields. The spray fields are
broken down into eight (8) zones. The Town of Liberty contracts the cutting and removal of the
fields for hay.
The Town of Liberty collection system consists of approximately 23 miles of sewer lines. The
lines vary in size from four (4") inch to twenty four (24") inch in diameter. The collection
system also consists of eight (8) lift stations that carry the wastewater to the treatment facility.
Operators make daily checks on the outfall lines and lift stations. The public works crew along
with contracted maintenance is responsible for the mowing and clearing of the outfall lines for
easy access in case of any emergencies.
3
II. Performance
The Town's most recent Compliance Evaluation Inspection of the Wastewater Treatment Plant
was July 20, 2023. The inspection mostly reflects compliance with Permit No. WQ0003090.
All items continue to be monitored by the ORC.
It is our goal to continue to find ways to improve the operations of the Wastewater Treatment
Facility and Collection System as we go forward.
Overflows at the Wastewater Treatment Plant
Date
Amount(gallon)
Cause
01/26-27/2023
99,000
1/I due to rainfall of 1.2" in 1 day
02/01-06/2023
659,000
I/I due to rainfall of 1.2" in 1 day
02/13-15/2023
201,000
I/I due to rainfall of 2.0" in 1 day
03/02/2023
500
I/I due to rainfall of 1.3" in 1 day
Pump failure on pump 1
04/07/2023
1,000
I/1 due to rainfall of 4.2" in I day
Pump failure on pump 2
04/10-13/2023
216,000
1/1 due to rainfall of 4.2" in I day
07/20/2023
9,000
Broken Spray Head
12/17/2023
2,000
1/1 due to rainfall of 2.5" in 1 day
Pump Failure on pump 1
12/27/2023
15,000
I/1 due to rainfall of 2.0" in 1 day
Gl
Overflows in the Collection System
Date
Amount (gallons)
Location
Cause
1/25/2023
1,200
Kim-o Rd. Manhole #500B
1/1
3/2/2023
310
Kinro Rd. Manhole #50013
1/1
4/7/2023
3,150
Kinro Rd Manhole #500B
I/I
4/7/2023
1,200
W. Kime Ave. Lift Station
Manhole #400
I/1
4/7/2023
1,200
W. Kime Ave. Manhole #400A
I/1
12/17/2023
8,400
Kinro Rd Manhole #500B
I/I
12/27/2023
1,800
Johnson Lift Station
Manhole #300
I/1
12/27/2023
2,400
W. Kime Ave. Lift Station
Manhole #400
I/I
Pump Station
Equipment Failure
12/27/2023
2,400
W. Kime Ave. Manhole #400A
1/1
Pump Station
Equipment Failure
12/27/2023
4,800
Kinro Rd Manhole #500B
1/1
Description of Corrective Measures
See Special Order By Consent
Liberty: A Great Place to Live
III. Notification
The Town of Liberty will add a notation on the next water bill about the availability of this
report. The report will be at Liberty Town Hall for viewing at 128 South Fayetteville St.
The report will also be posted on the Town Website at hlM://www.liberty-nc.com, under
Departments, Public Works, Wastewater Department.
3
IV. Certification
2023 Annual Report Certification Form
System Name: Town of Liberty
Wastewater Permit # WQ0003090 Collection Permit # WQCS00280
Report Year: 2023 Population Served: _2,665�
The wastewater system operator named above hereby confirms that all provisions under the House Bill
1160 requiring the development of, distribution of, and notification of an annual report have been executed.
Further, the system operator certifies the information contained in the report is correct and consistent with
the compliance monitoring data previously submitted to the primacy agency by their NC certified
laboratory.
Certified by: Name: Scott Kidd Title: _Town Manager
Signature:
Phone #: (336) 622-4276 Date: February 19, 2024_