Loading...
HomeMy WebLinkAbout20130352 Ver 1_Project Retired_20151020� Action ID Number:SAW 2009 02019 Permittee: Mr. Gre¢ Thorpe, PhD. PE / NC DOT PDEA / TIP U-2S00 Date Verification Issued: Auril 10, 2013 Project Manager: John Thomas County:Forsvth Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Raleigh REGULATORY FIELD OFFICE 3331 Heritage Trade Drive Wake Forest, NORTH CAROLINA 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject fo permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. O 1� I � D te 1�� � � NCDENR North Carolina Department of Environment and Natural Division of Water Qualily Pat McCrory Charies Wakild, P. E. Governor Direclor NCDWQProjeIctNo.: � '���� Applicant: � � �� J \ Resources John E. Skvarla, II I Secretary County: ��/" � ProjectName: �/` "���1� ��1 `�C� C, � l7':_:(� Date oSIssuance of 401 Water Quality Certification: ,�� CertiGcate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable BuFfer Rules, and any subsequent modifications, the appiicant is requu�ed [o retum this certificate to the 401 Transportation Pemutting Unit, North Carolina Division of W ater Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1 C50, This form may be returned to NCDWQ by the applicant, the applicanYs authorized agent, or the project engu�ecr. It is not necessary to send certificates from all of these. Appl'cnut's Certificetio�: � ( ���y � C I, ' m� � c M�Ut / , hereby state that, to the best of my abilities, due eare and diligence was ed i th servarion of the constructio such that the construction was observed to he built within substantial compliance a�d inten[ of the 401 Water Quality Certification and Buffer Rules, the approved plans and speci£cations, an oYher supporting materials. Signature: ��' I�.; � �' /!/ OY�/i Date: �� ,�� AgeePs Ce�7ificntrou I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the conshvction such that the consnvction was observed to be builY wifhin substantia] compliance aud intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signahue: E�:giReer's Certifirntior� Partial Final I, , as a duly registered Professional Engineer in the State of North Camlina, having been authorized to observe (periodically, weekly, full time) the construcrion of the project for the Pemuttee hereby state that, to the best of my abilities, due care and diligence was used in thc observation of the consnvetion such that the construction was obseived to be built within substantial compliance and intent of the 401 Water Quality Certification and Buf£er Rules, the approved plans and specifica[ions, and other supporting materials. Signatme Date Vorth Camlina Division of Wafer �uJity, WinstonSalem Regional OKce Lorauoa 5B5 Waughtaxn St Winston-Salem, Notlh Wrc'�na 27107 Phone: 336-771-5000 \ FAX: 336-771-06301 Customer Service: 1-877E23-6748 ' rtemet ww�v.nava�erquality.olg Fn Equal OppoAunity 1 Affirmati�e Aclion Employer Regishation No. NorthCarolina �aturallr�