Loading...
HomeMy WebLinkAboutNCC230769_MODIFICATION Supporting Documents_20240213 Wake County Environmental Services Department Water Quality Division,Watershed Management Section WAKE 336 Fayetteville St.• P.O. Box 550• Raleigh, NC 27602 COUNTYTEL 919 856-7400• FAX 919 743-4772 SECPA-SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL Cambria Section Project Name 1 Watershed Swift Creek Jurisdiction Garner Date Processing Date Received 12/21/2022 Initiated 12/22/2022 Project Number SEC-094255-2022 $11,500 PAID Disturbed $225 PAID $11,500 PAID Acreage 59 Plan Review Fee $3250 PENDING Permit Fee $3250 PENDING Applicant: Engineer: Name Pulte Home Company, LLC Timmons Group 1225 Crescent Green Drive,Suite Address: 250,Cary NC 27518 5410 Trinity Road,Suite 102, Raleigh NC 27607 Phone: 919-816-1146 919-723-8589 Email: Chris.raughley@pultegroup.com sean.hein@timmons.com Plan Date/Revision Date: 12.22.2022/02.03.2023/02.17.2023/12.20.2023/02.06.2024 Construction Plan Conditionally Approved with the following Conditions of Approval and Approval Date: ® Applicable Standards 02.06.2024 1. No disturbance/work is permitted in NCDOT Right-of-Way apart from the construction entrance(access). Conditions of Approval Items marked with an "X"were noted as conditions of the Sediment and Erosion Control Plan approval. Unless otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO),adopted 04/17/06. A mandatory preconstruction meeting is required between the owner,contractor,and Wake County prior to ® 1. issuance of the Land Disturbance Permit.The permit fee is due at that time.[10-30-7(C)]Please contact Karyn Pageau at 919-796-8769 to schedule the preconstruction meeting and provide four(4) plan sets. El Grading,other than for installation of soil erosion and sedimentation control measures, is prohibited prior to 2' the issuance of a Certificate of Compliance.(10-30-7(D)] Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field ® 3. modifications to erosion and sediment control devices. No devices shall be removed without prior approval from Wake County. Wake County's sedimentation pollution control program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during the project it is determined that the Erosion ® 4. and Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation Control Ordinance of Wake County,this office may require revisions in the plan and its implementation to ensure compliance with the Ordinance. Effective April 1, 2019, prior to the preconstruction meeting with the county,the applicant must obtain from NCDEQ-DEMLR the NCG-010000 NPDES Construction Stormwater General Permit coverage by completing an ® 5 electronic Notice of Intent(N01). The online NOI submittal must include the completed and notarized Financial Responsibility/Ownership Form and this approval letter. See NCDEQ web site at: https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permits/stormwater- permits/construction-sw. El SUBDIVISIONS ONLY Builders are required to obtain grading permits for cumulative disturbance over one acre 6. (including non-contiguous lots). 1 APPROVALS&EConstructionPlan ReviewChecklist-V.2 WM Wake County Environmental Services Department �� Water Quality Division,Watershed Management Section WAKE 336 Fayetteville St.• P.O. Box 550• Raleigh, NC 27602 COUNTYTEL 919 856-7400• FAX 919 743-4772 SECPA-SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL Applicable Regulations Unless otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance(UDO),adopted 04/17/06. 10-30-6 Validity of Plan,Lapse of Approval-An approved erosion and sedimentation control plan is valid for 2 ® 7. calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year period,the erosion and sedimentation control plan approval becomes null and void. ® 8. 10-30-8 Actions Required Prior to Land Disturbance S&EC plan approval and land disturbance permit issued must be prominently displayed until all ® a. construction is complete, all permanent sedimentation and erosion control measures are installed and the site has been stabilized.A copy of the approved plan must be kept on file at the job site. ® b No person shall initiate a land-disturbing activity until notifying Wake County of the date that the land- disturbing activity will begin. ® 9. 10-31-1 Authority County officials may enter any property, public or private,at reasonable times for the purpose of investigating and inspecting the sites of any land-disturbing activity. No person shall refuse entry or access ® a. to any authorized representative or agent for the County who requests entry for purposes of inspections, and presents appropriate credentials, nor shall any person obstruct, hamper,or interfere with any such representatives while in the process of carrying out their official duties. Agents and officials of the County will periodically inspect land-disturbing activities to ensure compliance with the North Carolina Sedimentation Pollution Control Act,this article,or rules or orders adopted or® b. issued pursuant to this article,and to determine whether the measures required in the erosion and sedimentation control plan are effective in controlling erosion and sedimentation resulting from land- disturbing activity. ® Any land-disturbing activity will be the responsibility of the person(s)conducting the land disturbing c. activity, including the property owners. Failure to prevent off site sedimentation will be deemed a violation of the erosion and sedimentation control regulations of this article. 15A NCAC28.0233-Due to the location of this project, it should be noted that a rule to protect and maintain existing buffers along watercourses in all of Wake County became effective in 2006.The Neuse River Riparian Area Protection and Maintenance Rule applies to all perennial and intermittent streams, lakes, ponds and estuaries in Wake County with forest vegetation on the adjacent land or"riparian area". In riparian areas with existing forest vegetation in the first 30 feet directly adjacent to the stream,the rule prohibits land disturbance, ® 10. new development and fertilizer use within the first 50 feet of land next to the water. In riparian areas with forest vegetation that is less than 30 feet wide,the rule prohibits land disturbance, new development and fertilizer use within the area that contains forest vegetation (but not the entire 50-foot riparian area). For more information about this riparian area rule, please contact the Division of Water Quality's Wetland/401 Unit at 919-807-6300.Wake County enforces the Neuse Buffer Rules in both the Cape Fear River Basin and the Neuse River Basin except when superseded by the Jordan Buffer Rules [15A NCAC 02B.0265]. 2 APPROVALS&EConstructionPlan ReviewChecklist-V.2 WM Wake County Environmental Services Department Water Quality Division,Watershed Management Section WAKE 336 Fayetteville St.• P.O. Box 550• Raleigh, NC 27602 COUNTYTEL 919 856-7400• FAX 919 743-4772 .VRIII _ull SECPA-SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL Wake County Watershed Management Section is not responsible for subject approvals of other Local,State or Federal Agencies.The subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401 (Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit requirements. The approval issued in this letter cannot supersede any other required permit or approval. Environmental Karyn Pageau,El,CPESC, Contact Info: Karyn.Pageau@wake.gov Consultant: CESSWI 919-796-8769 Wake County Plan Xvit„, Q Kevin.Zelaya@wake.gov Reviewer: Contact Info: 919-856-7473 Kevin Zelaya, PE 3 APPROVALS&EConstructionPlan ReviewChecklist-V.2 WM