Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
960164_Permit Renewal Application 2019_20190410
State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2019. Please do not leave any question unanswered. Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Farm Number: 96-0164 Certificate Of Coverage Number: AWS960164 2. Facility Name: B_oarhead AI -Lab & Isolation 3. Landowner's Name (same as on the Waste Management Plan): Maxwell Foods LLC 4. Landowner's Mailing Address: PO Box 10009 City: Goldsboro State: NC Zip: 27532-0009 Telephone Number: 919-778-3130 Ext. E-mail: 5. Facility's Physical Address: 1686 C D New Hone Rd City: La Grange State: NC Zip: 28551 6. County where Facility is located: Wayne 7. Farm Manager's Name (if different from Landowner): g. Farm Manager's telephone number (include area code): 9. Integrator's Name (if there is not an Integrator, write "None"): Maxwell Foods LLC 10. Operator Name (OIC): Clint Wilfred Borel Phone No.: 919-778-3130 OIC #: 1002850 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine - Boar/Stud 350 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses Wean to Feeder Dairy Heifer Laying Chickens Horses - Other Farrow to Finish Milk Cow Pullets Sheep - Sheep Feeder to Finish Dry Cow Turkeys Sheep - Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultn' Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) ISOLATION 6/28/1994 (,LAY HZ171 00 10006 19.00 PRIMARY 6/28/1994 I-Lx1 i 1*-1 ( & 0 Z6 0106 19.00 Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), sigoned b% the owner and a certified technical s pecialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name: !J , N . Title: Signature: _ Date: �Z'r Name: Signature: Name: Signature: Title: Date: Title: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 E-mail: 2019PermitRenewal@ncdenr.gov FORM: RENEWAL -STATE GENERAL 02/2019 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director July 11, 2000 CERTIFIED MAIL RETURN RECEIPT REQUESTED Goldsboro Hog Farms Boarhead AI -Lab & Isolation PO Box 10009 Goldsboro NC 27532 Farm Number: 96 - 164 Dear Goldsboro Hog Farms: IT NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES You are hereby notified that Boarhead AI -Lab & Isolation, in accordance with G.S. 143-215.10C, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has sixty (60) days to submit the attached application and all supporting documentation. In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 If you have any questions concerning this letter, please call Sue Homewood at (919)733-5083 extension 502 or Daphne Cullom with the Washington Regional Office at (252) 946-6481. Sincerely, 01 for K£e%r`r%ver cc: Permit File (w/o encl.) Washington Regional Office (w/o encl.) 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality Non -Discharge Permit Application Form (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Existing Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections that are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: 1.1 Facility Name: Boarhead AI -Lab & Isolation 1.2 Print Land Owner's name: Goldsboro Hog Farms 1.3 Mailing address: PO Box 10009 City, State: Goldsboro NC Zip: Telephone Number (include area code): 919-778-3130 1.4 County where facility is located: 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): 1.6 Print Farm Manager's name (if different from Land Owner): __ _ 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): Goldsboro Hog Farms _ _ _ 1.8 Date Facility Originally Began Operation:. JUO f444 1.9 Date(s) of Facility Expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility No.: 96_ (county number); 164. (facility number). 2.2 Operation Description: Swine operation Boar Stud 350- Certified Design Capacity Is the above information correct? ,-yes; 1:1 no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum number for which the waste management structures were designed. Type of Swine 0 Wean to Feeder 0 Feeder to Finish 0 Farrow to Wean (# sow) 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) No. of Animals Type of Poultry No. of Animals Other Type of Livestock on the farm: 0 Layer _ 0 Non -Layer 0 Turkey _ FORM: AWO-G-E 5/28/98 Page 1 of 4 96 - 164 Type of Cattle No. of Animals 0 Dairy 0 Beef No. of Animals: 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): Required Acreage (as listed in the AWMP): 3-6-8' 1.1S 2.4 Number o lagoons storage ponds (circle which is applicable): Z 2.5 Are subsurface ains present within 100' of any of the application fields? YES o NO (please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or NO (please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) 1� I YES Ir NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? What was the date that this facility's land application areas were sited? 3. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components. Some of these components may not have been required at the time the facility was certified but should be added to the CAWMP for pennitting purposes: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.11 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 3.3.16 Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. FORM: AWO-G-E 5/28/98 Page 2 of 4 96 -164 Akzplicants Initials PAW Facility Number: 96 - 164 Facility Name: Boarhead AI -Lab & Isolation 4. APPLICANT'S CERTIFICATION: I, _ 6a4iW,9 NAr 5 (Land Owner's name listed in question 1.2), attest that this application for ?yA?44V*P Al LAD 2 ISocAT 04 (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to m as incomplete. Signature � , vw✓ MOPM Date 1I,J74-L DO 5. MANAGER"S-IffERTIFICATION: (complete only if different from the Land Owner) I, (Manager's name listed in question 1.6), attest that this application for (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 5/28/98 Page 3 of 4 96 - 164 ,&STATE, ROYCOOPER.,; 6i+iY'EYGovernorGovernor MICHAEL $. REGAN 5etrerar y APR 0 2 20S LIN©A CULPEPPER NORTH CAROLINA Director EnvironmentalQualfty February 27, 2019 Maxwell Foods LLC Boarhead AI -Lab & Isolation PO Box 10009 Goldsboro, NC 27532-0009 Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits, which expire on September 30, 2019. Copies of the new animal waste operation State Non -Discharge General Permits are available at httos•//dea ne eov/about/divisions/water-resources/water- ualitv-reuional-operations/afo or by writing or calling: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 In order to assure your continued coverage under the State Non -Discharge General Permits. you must submit an application for Permit coverage to the Division. Enclosed you will find a "Renuest for Certificate of Coverage Facility Currently Covered by an Expiring State Non -Discharge General Permit." The auplication form must be completed, signed and returned by ,April 3, 2019. Please note that you must ,include one ill cony of the Certified Animal Waste Management Plan ICAWMPI with the completed and sicned-plication form. A list of items included in the CAWMP can _be e found on a 2 of the renewal application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9100. Sincerely, Jon Risgaard, Section Chief Animal Feeding Operations and Groundwater Section Enclosures cc (w/o enclosures): Washington Regional Office, Water Quality Regional Operations Section Wayne County Soil and Water Conservation District AFOG Section Central Files - AWS960164 Maxwell Foods LLC , NorthCaraensDepartmentofEnvv,roamerts'Q�ta'-SY 1 t7;vsanofiS'aterResou:ro-s �E r 1 512 N. Ca`sbum St. 11S3S hia:1 Se-Vos-Ce-ater I Rae gh, North Caro'"na 27e-99-1S36 WASTE UTILIZATION PLAN Goldsboro Hog Farms, Inc. Friday, May 22, 1998 Updated 111712017 Producer: Maxwell Foods, Inc. Farm Name: Boarhead Al & [so PO Box 10009 Goldsboro,NC 27532 Telephone # : (919) 778-3130 Type of Operation : Boar stud Number of Animals: 350 hogs design capacity Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 350 hogs X 5.6 tons waste/hogslyear = 1960 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 350 hogs X 3.7 Ibs PAN/hogs/year = 1295 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE 1 : ACRES OWNED BY PRODUCER CT FIELD LA S- ROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE N/ACRE N/ACRE USED TIME 909 3 LAKELAND 0-5% BH 4.5 225 0 3.44 774 APR-SEP 909 3 LAKELAND 0-5% SG 2 100 0 3.44 344 OCT-MAR 909 4 KENANSVILLE ALL BH 5.5 275 0 2.2 605 APR-SEP 909 4 KENANSVILLE ALL SG 2 100 0 2.2 220 ' OCT-MAR TOTALS: 1943 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 TABLE 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specifications 2.) There are no Acres Leased Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES 1 and 2 above: CROP CODE BH SG _ CROP HYBRID BERM UDAGRASS-HAY SMALL GRAIN OVERSEEDED UNITS LBS N/UNIT TONS 50 AC 50 1 Page 3 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 _ _ 5.641 1,943 TOTALS: 6.641 1,9431 AMOUNT OF N PRODUCED: 1,295 * BALANCE -648 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 213.5 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See the attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 5.92 months. In no instance should the volume of waste being stored in your structure be within 1.58 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. APPLICATION APPLICATION TRACT FIELD SOIL TYPE CROP RATE (in/hr) AMT (inches) 909 -3 LAKELAND 0-5% SG 0.75 1 909 3 LAKELAND 0-5% BH 0.75 '1 909 -4 KENANSVILLE ALL SG 0.60 '1 909 4 KENANSVILLE ALL BH 0.60 *1 ' This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because the nitrogen limitation. The maximum application amount shown can be applied undeLrgp#imam soil conditions. APR 0 2 2019 Page 4 NARRATIVE OF OPERATION Per Interagency Nutrient Management Committee Guidance dated 10/17/2017, the modification update for the 100 lb nitrogen PAN rate for winter small grains is as follows: - farms utilizing the 100 Ibs/ac PAN rate for the overseed are allowed to apply no more than 50 Ibs/ac PAN from OCT 1 - DEC 31 and no more than 50 Ibs/ac PAN from JAN 1 - MAR 31 - applications made during the months of DEC and JAN cannot exceed the combined total of 25 Ibs/ac PAN for the two month period - the last application of animal waste is to be applied to the bermuda crop prior to SEP 30 - the PAN rate for grazed systems must be reduced by 25% - cereal rye and annual ryegrass should be planted by OCT 15 to provide the best opportunity to get winter growth - harvest is required prior to heading or APR 7, whichever comes first, for both cereal rye and annual ryegrass. This is necessary to minimize the potential for shading of emerging bermuda and reducing its yield. To favor the production of bermuda, additional harvest of annual ryegrass will be required when the ryegrass canopy reaches 12-15 inches height - these management requirements shall also apply to overseeded winter small grain For recordkeeping purposes, the same acres will/can be utilized for irrigation with both hard hose traveler and aeroway irrigation. On the IRR-2 form, an AW will designate that the application was done with an aeroway Page 5 PLANS & SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to 'Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary Page 6 and from any perennial stream or river (other that an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the landownwer. 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. *18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina Department of Page 7 Agriculture regulations. * Liquid Systems Page 8 NAME OF FARM: Boarhead Al & Iso OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. I (we) understand that I must own or have acces to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: Maxwell Foods, Inc. SIGNATURE: DATE: NAME OF MANAGER (if different from owner): J rm H, nc� please print SIGNATURE: DATE: NAME OF TECHNIC L SPECIALIST: George H. Pettus AFFILIATION: Mountain 2 Sea Environmental LLC ADDRESS (AGENCY): 12 Hampton Lane Weaverville, NC 28787 (828) 785- 3-95) SIGNATURE:DATE: 67 kpv 2p f 7 Page 9 A27TM�T• le sT3 XAH;LGZ2M!= PLAAX C3RTI?IC_XTIQX ?OR NZX OR 7..:PA2MZM FZZMLOTS please retu--n the ccmpleted forte to the Division of 3:=-ri_o=ental 2ianagaaeat at he add...-esa on the raversn aide of this for=. Name of farm (Please print) : A.1• LAB-(,01."cgo " 0 6 GAF-wAei l►jc• Add; es s : P a• BOX i000q b0 LD26D;z0 NC, Zy5 Phone No.: 01141- 17$ - 3130 County: W A,4 W C Farm location: Latitude and Longitude:352 2f' LO: /112 _tj 20" (required) Also, please attach a copy of a county road map with location identified. Type of operation (swine, layer, dairy, etc.) : SWINE Design capacity (number of animals) : 0 ECA'R'S Average site of operation' (12 month population avg. ) : 22. 0 Average acreage needed for land application of waste (acres): TecIL-lcal Specialist Certificatioa As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to ISA NCAC 6F .0005, I certify that the new or expanded animal waste management system as installed for the farm named above has an animal waste management plan that meets the design, construction, operation and maintenance standards and specifications of the Division of E.-ivironmental Management and the USDA -Soil Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001-.0005. The following elements and their corresponding minimum criteria -have -been verified by me or other designated technical specialists and are included in the plan as applicable: minimum separations (buffers); liners or equivalent for lagoons or waste storage ponds; waste storage capacity; adequate quantity and amount of land for waste utilization (or use of third party) ; access or ownership of proper waste application equipment; schedule for timing of applications; application rates; loading rates; and the control of the discharge of pollutants from stormwater runoff events less severe than the 25-year, 24-hour storm. Naha of Tec'saical Specialist (Please Print) : EI-Vv zb� H. TCLlS Affiliation: EN&IUMT- 0 GAG 0CR0 HFUG• wy, 1WC, . Address (Age. y) : •0. wg 1DDOq &OLM-b o, Z7532 Phone No. Ri,1-770-3130 Signature: Date: 114OGT of _---����Q3C-13 �3 3a33�3�3�=JZ-Ja33 �'J'i 33373���3 �3�33373333��33 �3�33 �7-1 �J3 Owner/Manager eat I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any additional expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state either through a man-made conveyance or through runoff from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. Name of Land or (P1 ase Print) : UVL*9WW go& FAVMff,. 1NC . Signature: '' Date• 114 OGT Name of 'Han ager, ; 'ifferent from owner (Please print): Signature: Date: Ngte: A change in land ownership requires notification or a (if the approved plan is changed) to be submitted to Envirommental Management within 60 days of a title transfer. DE.*? USE ONLY:AC`rE 4 new certification the Division of lo;n!.AL WAS'I.3 MANAGMMM PLAN C3s'� 71CATION FOR NEW OR E=ANDED FEEDLOTS please =etU= the Completed foxes to the Division of Eavi=ormeatal 2iaaagemaat at t.te add. --ass on the reverse aide of t:sis fora. Name of farm (Please print) : A.I. IeioLA-nDtJ - &DL77bogo ►•(Ob FA9fw7, ((�fG . Address: F.C. 'BD% 100OR �Di 1J G 2 32 Phone No.: 0 °I-'77S-31X County: WA NE Farm location: Latitude and Longitude:W 2V &'11f _51'102 (required). Also, please attach a copy of a county road map with location identified. Type of operation (swine, layer, dairy, etc.): SW+N 6 Design capacity (number of animals): 100 fts Average size of operation (12 month population avg.): o boAMs Average acreage needed for land application of waste (acres): I.5 XGie—sS 31333.T 3333-33---J-133'i3333--33-3----J=-i-J 3•J-1333333--333333-333-'333-333333133-3'3333 Tae'�.^.ical Specialist Certification As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005, I certify that the new or expanded animal waste management system as installed for the farm named above has an animal waste management plan that meets the design, construction, operation and maintenance standards and specifications of the Division of Environmental Management and the USDA -Soil Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2114.0217 and 15A NCAC 6F .0001-.0005. The following elements and their corresponding minimum criteria-haue been verified by me or other designated technical specialists and are included in the plan as applicable: minimum separations (buffers); liners or equivalent for lagoons or waste storage ponds; waste storage capacity; adequate quantity and amount of land for waste utilization (or use of third party) ; access or ownership of proper waste application equipment; schedule for timing of applications; application rates; loading rates; and the control of the discharge of pollutants from stor-awater runoff events less severe than the 25-year, 24-hour storm. Name of Technical Specialist (Please Print): C-eOV-" N• s Affiliation: V-9VrRQNMENTAI. " iN - 6ID S (NG. Address (Agency) : Y0. W)c ("4 &OUM52CRO - NG 2-7532 Phone No. �ilol-"77$-31W Signature:- Date: 3------33.--3-- 33 333-333-33712337373=33333-i..3333337333-333-33ii 33-i 3i Owner/Magager A e t I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any additional expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state either through a man-made conveyance or through .runoff from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. Name of band Owner (Please Print) : ��� � I1OCy F*47-M2 We. Signature: Date: f4 OLrgi IIaae of Manager, 3. fferent from owner (Please print): Signature: note: A change in land ownership requires (if the approved plan is changed) to Environmental Management within 60 days of Date: notification or a new certification be submitted to the Division of a title transfer. DMA USE ONLY:ACIEW4 United Slates Sod I_� �•)� Oecar:ment of Conaen,elton Agriculture Service CP ERATOR: 6VLPS60'rt0 J4C& PAT -MS - A.T. SrATIVq . t Please review the attached plan and specifications eare.`ully. Retain this plan for your use and records. It is strongly recommended that you, your contractor, and Soil Conservation Service personnel are in agreement as �to how the waste lagoon is to be constructed. The Soil Conservation Service personnel will meet with all concerned parties and walk over the site to explain all flags and markings. It is important that everyone understand what is -expected so that final construction meets plans and specification and the job can be certified for payment (if cost -sharing is involved). The pad dimensions and grades are the best estimate. The BUILDER or CONTRACTOR is -RESPONSIBLE for final layout and design of the pads. The Soil Conservation Service personnel will assist in a limited capacity, as its major concern is the proper design and construction of the waste trea tment' la oon. The actual amount of material required for pads and dam may vary from the estimates.' The design -.will attempt to balance cuts and fills as close as essible. I.f additional material is required after construction is complete ray SCS on the lagoon,. the contractor and'owner will negotiate on the price and location of borrow area. . r NOTE: Design Requirement: 157fbo /cu.ft. _ cu.yds. Estimate of Excavation: Estimate of Pad L Dike: 1.56: 1 .Ration ' cu. ft. - _ 475q ^cu. yds. _W cu.f t. . 1045: cu. yds. � Job Class • 2. 28 J-u'urz•gy Date Designed By Design Approval t ame 7 Da to ' APR 0 B 2019 pItAU, C V0 C L4 r4 C-S flGTKoz�) e) (/&"Z/r� %�' soft C��( Yut�9io • Sod COn,.t.al.On S=sr*.C• 4—j of A;lKultu.. � w 1 b C \ z' ♦ _ S _ s >n> ,� L Zr G 'e ,tea •L CSX O=NQ CO \ flj 4`.: ■ � � nc 27, r IL LI UNC p_ ol \ 1 4 N `3 svi�ii /,?• .- I�. .y �u ��y� C �/ti P r x Is —UNDARY��\l ♦•� 1 94 171 Ij: L i {:'f 1. s - L� G s CIE _ ' 1'• [ IV J •e F. - 'v a •�. I �o w N u i�L-I_ 'ram ` _Q �•e� p R C O U i IN s G R E E ri ;1 Z Operator:A.I. Station County: Wayne stance to nearest residence (other than owner): 1. AVERAGE LIVE WEIGHT (ALW) Date: 06/28/94 1600.0 feet 0 sows (farrow to finish) x 1417 lbs. = 0 lbs 0 sows (farrow to feeder) x 522 lbs. = 0 lbs 0 head (finishing only) x 135 lbs. = 0 lbs 0 sows (.farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs Describe other : 27.E Px s 0 4Ec2 Lss . 99000 Total Average Live Weight = 99000 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 99000 lbs. ALW x Treatment Volume(CF)/lb. ALW Treatment Volume(CF)/lb. ALW = 1 CF/lb. ALW Volume = 99000 cubic -''feet 3. STPRAGE VOLUME FOR SLUDGE ACCUMULATION ",PwNeR REduEeT5 NO Zwvoa sreFAG-C. Volume = 0.0 cubic feet 64aME WIL4 gE P-ET-WWVFD AS N6FaT?cR." 4. TOTAL DESIGNED VOLUME Inside top length (feet)--------------------- 130.0 Inside top width (feet)---------------------- 200.0 Top of dike elevation (feet)----------------- 56.0 Bottom of lagoon elevation (feet)------------ 45.0 Freeboard (feet)----------------------------- 1.0 Side slopes (inside lagoon)------------------ 3.0 1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 124.0 194.0 10.0 AREA OF TOP LENGTH * WIDTH = 124.0 194.0 24056 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 64.0 134.0 8576 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 94.0 164.0 61664 (AREA OF MIDSECTION * 4) CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 24056.0 61664.0 8576.0 1. Total Designed Volume Available = 157160 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 130.0 200.0 26000.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 26000.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 99000 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 180840 gals. or 24176.5 cubic feet 5R. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculat( the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount, 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 15166.7 cubic feet �'`. Volume of 25 year - 24 hour storm Volume = 7.0 inches / 12 inches per foot * DA Volume = 15166.7 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 24176 cubic feet 5B. 0 cubic feet 5C. 15167 cubic feet 5D. 15167 cubic feet TOTAL 54510 cubic feet ANNEF40 u M_� C A Temporary storage period____________________> 180 days Rainfall in excess of evaporation=====______> 7.0 inches 25 year - 24 hour rainfall__________________> 7.0 inches Freeboard___________________________________> 1.0 feet Side slopes_________________________________> 3.0 : 1 Inside top length________________.___________> 130.0 feet Inside top width____________________________> 200.0 feet Top of dike elevation_______________________> 56.0 feet Bottom of lagoon elevation__________________> 45.0 feet Total required volume_______________________> 153510 cu. ft. Actual design volume________________________> 157160 cu. ft. *� Seasonal high watertable elevation (SHWT)===> 49.5 feet Stop pumping elev.__________________________> 52.4 feet Must be > or = to the SHWT elev.====______> 49.5 feet Must be > or = to min. req. treatment el.=> 51.0 feet Required minimum treatment volume=====______> 99000 cu. ft. Volume at stop pumping elevation=====_______> 100853 cu. ft. Start pumping elev._________________________> 54.3 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 141993 cu. ft. Volume at start pumping elevation=====______> 140784 cu. ft. Required volume to be pumped________________> 39343 cu. ft. Actual volume planned to be pumped=====_____> 39932 cu. ft. Min. thickness of soil liner when required==> 1.6 feet 7. DESIGNED BY: APPROVED BY: DATE : 6.DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: 16'PA I`CS W,u_ Mrtku wAera unorA-rvN pi.". .-- .bnhhT 1 Vr, L OPERATION AND MAINTENANCE PLAN ------------------------------- This lagoon is designed for waste treatment (permanent storage) and 180 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary storage consists of 180 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also included is storage for the 25 year - 24 hour storm for the location. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building-(s). If the outlet pipe is not installed at the elevation to begin pumping, a permanent marker must be installed at this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain lagoon treatment depth. •Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out: I. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the .lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump -out of the lagoon when fluid level reaches the elevation 54.3 as marked by permanent marker. Stop pump - out when the fluid level reaches elevation 52.4 . This temporary storage, less 25 yr- 24 hr storm, contains 39343 cubic feet or 294287 gallons. 0 SHEET 2 OF 2 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. Refer to the waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. Waste shall be applied in a manner not to reach other property and public right-of-ways. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. U. S. Department of Agriculture Soil Conservation Service NC-ENG-34 September 1980 ",HAZARD CLASSIFICATION DATA SHEET FOR LAGOONS Landowner ��p( s1i�� " AR Y1 (A •I. 57, rl-od ) County WAYNE Community or Group No. Lagoon Estimated Depth of Water to Top of ftm Conservation Plan No. Ft. Length of Flood Pool 20 4 Ft. Date of Field Hazard Investigationtlz �� 9 Evaluation by reach of flood plain downstream to the point of estimated minor effect from sudden dam failure. . Est..Elev. :Est. Elevation Kind of :Improvements: of Breach Reach: Length: Width: Slope: Land Use Improvements Above :Floodwater Above Flood Plain: Flood Plain Ft. Ft. % Ft. Ft. T la o opS 2 . 3 Describe potential for loss of life and damage to existing or probable future downstream improvements from a sudden breach AlpAlr. Stn� ,J 13��i4.['!-� P 6T Na �kr�fC�C7? 7 ar .1 [gGout Hazard Classification of -Dam ( b, c) (see NEM-Part 520.21) Dam Classification (I, II III, IV, V) By _ Id, name title Concurred By z j ,Oc (name) title NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. Date 7/ %4/ Date `% S %'y 1Z SOUTHEAST GOLDSBORO QUADRANGLE NORTH CAROLINA — WAYNE CO. 7.5 MINUTE SERIES (TOPOGRAPHIC)o�,� SW14 GOLDSBORO 15' QUADRANGLE \� ` 55, '36 237 12 330 000 FEET 238 77, 52' 30" ! 1 _ 35°22'30" \ ° f 35.9 tv ID 1lAr 13 4 �> 590 000 FEET 37- - c' \t % Qa I BM . \ l 40.3 \ 1 1 \ 1 2` 10-1 m \ (3916 ---- / / Walnut o� o •�� 1122 I I '��'- � pOCOSi/1 IC • j 1113 •l� � I � � ] 1 ��, Junction I i 11 I • 70 1723 l ; ' �� 2915 .[Elroy -f, py .CONVEJ I l / Ce`m .\ 1722 \ o \ SCAT jp Casey 0 Fee[ 1725 J! 'Ch. 0 15000 3914 Daniel �Cem .' -mil' r/\\ ! 1000 1726 ,� _ �-`Lo,� ', ✓" l.\ �., Cem: / 20' 37 30- 120DO � Cem1I 13 I D000 35,6 �... '350 u,,, , u,.., j ��,.�:+.r t�� ' ��-!� =I• �' L �- Creek Z • _� s 9000 RON ■■■ ME�':��SCC10 .:%■::.. ■ .■■.. 111111 .■..�..■■■■■. ................. ='\ United States [ DeOar.ment Of �► � Acrrcultur• CPERATOR: Sod Con :i *rvatfan Servic e 601-P$ 30RD 140& FARnMs, ruc. A. r. I5DLAnot4 Rcv't, r 2 (<U. L1( q ?lease review the attached plan and specifications carefully. Retrain this plan for your use and records. 1t is strongLy recommended that you, your contractor, and Soil Conservation Service personnel are in agreement as •to how the waste lagoon 'is to be constructed. The Soil 1 Conservation Service personnel wilt meet with all concerned parties and walk over the site to explain all flags and markings. It is important that everyone understand what is expected so that final construction meets plans and specification and the job can be certified for payment (if cost -sharing is involved). The pad dimensions and grades are the best estimate. The BUILDER or CONTRACTOR is -RESPONSIBLE for final layout and design of the pads. The Soil Conservation Service personnel will assist in a limited capacity, as its maicr concern is the proper design and construction of the waste treatment" lagoon. The actual amount of material required for pads and dam may vary from the estimates. The design.will attempt to balance cuts and fills as close as GiE ^essible. I.f additional material is required after construction is eom lete -r5 on the lagoon, the contractor and' owner wi l 1 negotiate on the p location of borrow area, price and NOTE: Design Requirement: �x588 �cu. f t. � cu. ds. Estimate of Excavation; y _,Cu.ft. x 16Z$ cu.yds.•K Estimate or gad L Dike: cu.f t. S60 �cu.yds. 3� � f � „p 1• q 8 : 1 Ration DIP Nor IZ41% e1-600tJ r: (.VVp�naN6, TO T-Ay IN SG MATr-RtA L . Job Class T ty . UL`f 44 Date Designed By r am Design Approval t Name as �� Date YaCaYA-%oT! �rnC� , �5 7��� S�/L • CG�SG�a�-y�J s� c� 0 r. 30+COn,.rf+ban 58'r. t •s +n a,�ncy el :n• v �•CueT.nl of A�r.Cv�l yr• ,rator:A.I. Isolation County: Wayne Date: 07/14/94 Distance to nearest residence (other than owner): 1. AVERAGE LIVE WEIGHT (ALW) 1800.0 feet 0 sows (farrow to finish) x 1417 lbs. = 0 lbs 0 sows (farrow to feeder) x 522 lbs. 0 lbs 0 head (finishing only) x 135 lbs. = 0 lbs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs Describe other :_ SD L`ra-S aV�, ZSa 1135. 20000 Total Average Live Weight = 20000 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 20000 lbs. ALW x Treatment Volume(CF)/lb. ALW Treatment Volume(CF)/lb. ALW = 1 CF/lb. ALW Volume = 20000 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION ��Qu6StS h10 5utc� 5TG6E- .. Volume = 0.0 cubic feet '1O0NERSLLA*C- W1LJ, De V-6vvt/EV AS N�FPr�v, ' TOTAL DESIGNED VOLUME Inside top length (feet)--------------------- 100.0 Inside top width (feet)---------------------- 100.0 Top of dike elevation (feet)----------------- 46.0 Bottom of lagoon elevation (feet)------------ 36.0 Freeboard (feet)----------------------------- 1.0 Side slopes (inside lagoon)------------------ 3.0 : 1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 94.0 94.0 9.0 AREA OF TOP LENGTH * WIDTH = 94.0 94.0 8836 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 40.0 40.0 1600 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 67.0 67.0 17956 (AREA OF MIDSECTION * 4) CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 8836.0 17956.0 1600.0 1. Total Designed Volume Available = 42588 CU. FT. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 100.0_ 100.0 10000.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL, DA 10000.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Feces & urine production in gal./day per 135 lb. A.LW 1.37 Volume = 20000 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 36533 gals. or 4884.1 cubic feet 5B. Volume of wash water This is the amount of fresh water:.used for washing floors or volume of fresh water used. for a flush system. Flush systems that recircula, the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallon! Volume = 0.0 cubic feet per CF 5C. Volume of rainfall -in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 5833.3 cubic feet 41 5D. Volume of 25 year - 24 hour storm Volume = 7.0 inches / 12 inches per foot * DA Volume = 5833.3 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6. SUMMARY 7. 5A. 4884 cubic feet 5B. 0 cubic feet 5C. 5833 cubic feet 5D. 5833 cubic feet TOTAL 16551 cubic feet Temporary storage period====================> 180 days Rainfall in excess of evaporation===========> 7.0 inches 25 year - 24 hour rain 7.0 inches Freeboard===================================> 1.0 feet Side slopes_________________________________> 3.0 . 1 Inside top length===== -------------------- __> 100.0 feet Inside top width============================> 100.0 feet Top of dike elevation=======================> 46.0 feet Bottom of lagoon elevation==================> 36.0 feet Total required volume======== --------- 36551 cu. ft. Actual design volume=====_____ -------- ______> 425.88 cu. ft. Seasonal high watertable elevation (SHWT)===> 37.8 feet Stop pumping elev.--------------------------> ----------------------- �1-feet VZ.o Must be > or = to the SH`WT elev.==========> 37.8 feet Must be > or = to min. req. treatment el.=> 42.0(feet * Required minimum treatment volume===========> 20000'cu. ft. Volume at stop pumping elevation============> 2� cu. ft.ao23Zj Start pumping elev._________________________> .44.3 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 36755 cu. ft Volume at start pumping elevation===========> 36675 cu. ft. Required volume to be pumped================> 10717 cu. ft. Actual volume planned to be pumped==========> _yC� cu. ft. Min. thickness of soil liner when required==> 1.5 feet DESIGNED BY:APPROVED BY: G t - TLcS , GOI i�RlJ we, j✓Av m5 DATE: jet �c�y DATE : 7/a NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: Lf':`'A:�a�/uI ML E166 ►/u�[.�✓r�:= fF��G' h(c�7 C(,�Grl1C� /.3y��. SHEET 1 OF 2 OPERATION AND MAINTENANCE PLAN ------------------------------ This lagoon is designed for waste treatment (permanent storage) and 180 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary storage consists of 180 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also included is storage for the 25 year - 24 hour storm for the location. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed at the elevation to begin pumping, a permanent marker must be installed at this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain lagoon treatment depth. Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out: I. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump -out of the lagoon when fluid level reaches the elevation 44.3 as marked by permanent;�marker. Stop pump - out when the fluid level reaches elevation : r This temporary storage, less 25 yr- 24 hr storm, contains 10717 cubic feet or 80167 gallons. SHEET 2 OF 2 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. Refer to the waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. B. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. Waste shall be applied in a manner not to reach other property and public right-of-ways. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. U. S. Department of Agriculture NC-ENG-34 Soil Conservation Service September 1980 HAZARD CLASSIFICATION DATA SHEET FOR XM LAGOONS Landowner ,g County WAYNE Community or Group No. Conservation Plan No. Lagoon Estimated Depth of Water to Top of kxm Ft. Length of Flood Pool o o Ft. Date of Field Hazard Investigation 7-/ z- Evaluation by reach of flood plain downstream to the point of estimated minor effect from sudden dam failure . Est. .Elev. .Est. Elevation Kind of :Improvements: of Breach Reach: Length: Width: Slope: Land Use Improvements : Above :Floodwater Above : Flood Plain: Flood Plain Ft. Ft. Ft. Ft. f�.l oaIDS _ 2 .. 3 Describe potential for loss of life and damage to existing or probable future downstream improvements from a sudden breach No1•[C . S AA61 f3 c�cA fbS6-s x(o &Xfq �C�Z %o f Ro E4L & A-1�1RgV1)mA7'L boo' Hazard"Classification of 1�a+ Ga b, c) (see NEM-Part 520.21) Dam Classification (I� II,.III, IV, V) LIM name title Concurred By �C '(name)title NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. Date Date^ 7 `fig l9X )7. SOUTHEAST GOLDSB ' ORO QUADRANGLE NORTH CAROLINA-WAYNE CO. 7.5 MINUTE SERIES (TOPOGRAPHIC) SWM GOLDSBORO 15' QUADRANGLE 236 237 12330000 FEET '38 77',52'30- f, '77 35*22'30' '18 cl "a OD 35A -',*'Substa 590000 FEET 3117 11,�37, 34 oo Bm 40.3 4 K "l 6 IL c--c — — — — — — — .4 Walnut 1722 Pocosin • I "ce 1723 Ch i'1713 I? .7 Ju 70 .-@2D3 j 1,15 . . . . . . . . .... Ch Cem... Elroy, laroy c( 1722 Ur . .5�. Feet Casey •*.". 1500, 3114 1725 14W cem m 'r Daniel =N 1726 + e__ 1300 "0 q 1200 m AF ce .rry IlDC zu 34 3&5 901 .3&0 reek Emergency Action Plan This plan will be implemented in the event that wastes from you operations are leaking, overflowing, or running off the site. You should NOT wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make very effort to ensure that this does not happen. This plan should be available to all employees at the facility, as accidents, leaks, and breaks can happen at any time. 1) Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to problems are listed below: a) Lagoon overflow: ■ add soil to the berm to increase the elevation of the dam i pump wastes to fields at an acceptable rate 0 stop all additional flow to the lagoon (waterers) 0 call a pumping contractor i make sure no surface water is entering the lagoon Note: These activities should be started when your lagoon level has exceeded the temporary storage level. b) Runoff from waste application field: • immediately stop waste application 0 create a temporary diversion or berm to contain the waste on the field ■ incorporate waste to reduce further runoff c) Leaking from the waste distribution system: pipes and sprinklers: © stop recycle (flushing system) pump © stop irrigation pump OO close valves to eliminate further discharge ® separate pipes to create an air gap and stop flow Page 1 e flush system, houses, solids separators: OO stop recycle (flushing system) pump OO stop irrigation pump OO make sure no siphon effect has been created ® separate pipes to create an air gap and stop, flow d) Leakage from base or sidewall of the lagoon. Often these are seepage as opposed to flowing leaks: • dig a small well or ditch to catch all seepage, put in a submersible pump, and pump back into the lagoon ® if holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. O other holes may be likewise temporarily plugged with clay soil. Note: For permanent repair measures, lagoon problems require the consultation of an individual experienced in their design and installation. 2) Assess the extent of the spill and note any obvious damages. a) Did the waste reach any surface waters? b) Approximately how much was released and for what duration? c) Any damage noted, such as employee injury, fish kills, or property damage? 3) Contact appropriate agencies. a) During normal business hours, call your DWQ regional office: 9By 946-6481; after hours, emergency number: 800-858-0368 or 19-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident, the exact location of the facility, and the location or direction of movement of the spill, weather and wind conditions, what corrective measures have been taken; and the seriousness of the situation. b) Your integrator: Goldsboro Hog Farms Division, Maxwell Foods, Inc. 919-778-3130 extension 1430 c) If the spill leaves the property or enters surface waters, call the local EMS: 919-731-1413 . Page 2 d) Instruct EMS to contact the local Health Department: 919-731-1174. e) (For technical assistance) Contact CES: 919-731-1520 Local NRCS office: 1-731-1532 4) Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 5) Contact contract pumping and/or irrigation equipment companies: 6) Contact dirt moving and/or heavy equipment companies: a) b) c) wayne Page 3 Insect Control Checklist for Animal Operations Source Cause v I3MPs to Control Insects Site Specific Practices Liquid Systems Flush Gutters • Accumulation of solids O Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. CI Remove bridging of accumulated solids at discharge Lagoons and Pits `• Crusted Solids ff Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 - 8 inches over more than 30% of surface. Excessive Vegetative • Decaying vegetation Er Maintain vegetative control along banks of Growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. Dry Systems Feeders • Feed Spillage O Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. M' Cleanup spillage on a routine basis (e.g., 7 - 10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulations of feed residues 0 Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., n covered bin for brewer's grain and similar high j: moisture grain products). e : v O Inspect for and remove or break up accumulated NZ solids in filter strips around feed storage as ^� needed. AMU' -November 11, 1996, Page 1 Source Cause HMPs to Control Insects. Site Specific Practices Animal Holding Areas Accumulations of animal wastes O Eliminate low areas that trap moisture along and feed wastage fences and other locations where.' waste accumulates and disturbance by animals is minimal. O Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed). Dry Manure Handling • Accumulations of animal wastes O Remove spillage on a routine basis (e.g., 7 - 10 Systems day interval during summer, 15-30. day interval during winter) where manure is loaded for land application or disposal. O Provide for adequate drainage around manure stockpiles. 17 Inspect for and remove or breakup accumulated wastes in filter strips around stockpiles and manure handling areas as needed. For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC, 27695-7613. ' AM IC - November 11, 1996, Page 2 IRRIGATION SYSTEM DESIGN PARAMETERS Landowner/Operator Name: 3041zW rAv A.1. d (4;vjAA-n p14 Address: Pd SOX to00q County: WAYnI r �ebst3otz0 . Telephone: 'IM-178,31349 Date: tq 4-AN of TABLE 1 - Field Specifications ZTotal field acreage minus required buffer areas. 3Refer to N. C. Irrigation Guide, Field Office Technical Guide, Section H G. Annual application must not exceed the agronomic rates for the soil and crop used. EXHOrr D-1 MRCS, NC JUNE, 1996 ,7 a Y- �`�— �+�.►�•—�`�•� �. �� fir, ,•��,-:y„'': `-�'•"�'' j • �+"'tom _ �; j �erT ,-Nr ` ♦r�j�,T�•`tirz: 1��:�"t% ,.' '` � , 't waSii�ra `` a ry � r�,a+ � � + '�'��-hT�^ Si,t 1 , �,,, . l'•I < s �•�� i.1 ,. �-rtr'-.-'t 1 � tarn sEt /: f t a �• ♦ � 5�. 1 �) •` ��'� f { � t'n'?, �• � a � �". !:•'ems ,��.1ff.:� w� ~''!s ':� .,; .1 't r `o •,�..4^ tr t i t4�'kktl,=iC ,. �+ .c•��4:/l~ S � wr.f r_ 1 is Q �'�r Y a '� i it 11 � 1 ��►. d r 1'. •` fif T ��a• � •'i''tf) * aity�l fi } < aaa'i t- .� � {�'�� .. 1t 1♦ rr ii /}� f - ' }dy.lt ► �r 'ytMrr r\:� afar a•♦� ; S i C< n� �L. ��•7 • s ) f'. — tl', +,a+:= � ��N'?Y.t''Y� � ,�j; �'Lrv.4 d, ,,;•C ��., ,t , , ...��:t►�,ai� f , r a, ,,� I � C ^ �. is • ,! :j-{.�•y��- C _ Y� T1�`�M �'Lj' 'n T�'� tJ�i•�♦\, '�i! ifJ � r F �i-�•/d�7• ) 7 1 t� 1. _ ^Ri � a �' '� •f���e' ^�e .� t � � � ` � L''.�'rd }, ~► 7 e ����+ � a T 1tt ;- t-fit 'a'?'•=;�; • . __�a+ •, -rt •a as r.l.4 . + 'a`` r'�'1 •?��','' , • s + t 10 ■t�� L �d,�'ai i, .,Y,a:' �r -r� r: ti.t sa •- <1 `r t y r, .y kJ1 �` tiTy t � �a tu� . �•,�q��i� { T,i' 9, .,�.s s T air .'. �qr ` i /- .E�'Ci��dr'J,i'J' � � >:za 7 ♦} _ t .s +r3} - �':"� , tr i -. t tee• t w a'Ja. ,� ' i" t. �- t - 5-- '-N.��ciii;sh �y 1� S,i.•`t :':f4t�•. 1. a ty i�l�p' ` , i .t A . SSA ♦ +��, a:' :•l::- mil \ `� �~,_ []t �'t. i::;y.�dyt' rrra ] - _ C i •-• -:% .' j' )a y , i �x• � f. �• t,���y,�•�'y[[l�s. s) T; IV.tl. `_ "r'Tr.`ai�� .Y Ij'�/�y::1�7'"i%ij� 1�•A:r ria`�j:iti, yyt i-� ;`4R ,--'�• ���r•4,;,•'�s'�! -4r3�•,'� t •`a�•`¢ • .Za ti f - +f L ; _ f,`�1. �t••--�s.�.�� ��Y +�. je`t i, �F r k� A a t� ` 1 ..�a :� a •�'� -r1c.. r 134 44 ' a�� t , i. ��;k P�. { ,.;.i i� •• : �T,ra a >ty3 - f - wi,'�•� 4 ti 1 S: •• .: � .• ��i � �x ,r.�, r`st Y•': ; to 4: s r +� .fr dam• y ,u �* .� 'a � 1t` t a� t3 ��i t f ro �•� ] � t r, f. :. d + r i] } -y�G f ^} .1 yta •••,t1��1},It.<rf�-Iey♦ � - at-_� _t '�{+fi. rs�-_ dT il'tiy�.���!•.:� rji;: 'd'•'-`' YiC.�: 'a�i. t -r • 't, S �••at ��iat . arc+C-;��, ♦ !3 • � . Wii 't�. ` '- ` F Cry,,' r 1 r • ,may. • �. fciK `�- • c1 22` ` Version —November 26, 2018 Mortality Management Methods Indicate which methods) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. ni Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. a � A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. ` �tl PO S gnature of Farm Owner/Manager n�tur f Technical Specialist Date ( tq Date Swine Farm Waste Manage' ment Odor Control �I Source . ^ - _T Ca Farmstead • Swine product Animal body surfaces • Dirty Floor surfaces • Wet Manure collection pits • Urine; • Partial in Ventilation exhaust fans • Volatile gases; Dust Indoor surfaces • Dust to Minimize f3 Vegetativ¢ or wooded buffers; 2 Recommended best management practices; 9 Good judgment and common sense Is D' Dry floors _T :red floors Ca' Slotted floors; f klist Site Specifle Practices W Waterers located over slotted' floors; Cl Feeders at high end of solid floors; W Scrape manure buildup from floors; ❑ Underfloor, ventilation for drying Frequent manure removal byl flush, pit recharge, decomposition or scrape;i ❑ Underfloor ventilation T4 W Fan maintenance; 17 Efficient air movement (9 Washdowo between groups of animals; Er Feed additives; ❑ Q' Feeder covers; Feed delivery downspout extenders to feeder eevefs - - - - - -- _ — Flush tanks • Agitation of recycled lagoon O Flush tanklcovers; fill lines to near bottom of tanks with liquid while ks are filling p' Extend anti -siphon vents Flush alleys • Agitation during wastewater ❑ Underfloor flush with underfloor ventilation conveyance Pit recharge points • Agitation of reccled lagoon la' Extend recharge lines to near bottom of pits 11 liquid while p�s'arcfilling with anti=siphon vents Lift stations • Agitation during sump tank r l7 Sump tank covers tilling and dra down A itation durifsg wastewater 0 Box covers Outside drain collection • g or junction boxes conveyance Source End of drainpipes at lagoon Lagoon surfaces nozzles Storage tank or basin surface + Agitation during wastewater conveyance • Volatile gas emissions; • Biological mixing; • Agitation • High pressure agitation; • Wind drift BMPs to Minimize Odor Site Specific Practices ❑ Extend dischazge point of pipes underneath lagoon liquid level _ -- - - - - - - - - - - - -- - -- Proper lagoon liquid capacity; W Correct lagoon startup procedures; ar minimumsurface area -to -volume ratio; Crl'• Minimum agitation when.pumping; ❑ Mechanical aeration; ff Proven biological additives ft3' Irrigate oh, dry days with little or no wind; Cal' Minimum recommended operating pressure; L7' Pump intake near lagoon liquid surface; O Pump from second -stage lagoon + Partial microb'.al decomposition; O Bottom or midlevel loading; . ` Mixing while filling; O Tank covers; Agitation whet emptying CI Basin surface mats of solids; ❑ Proven biological additives or oxidants I� • • • • d th li uid Settling basin surtace • ra,s,uI ,,,.. ■..� �•-_ ••_� ___ - . • Mixing while filling; level; A •tation when emptying O Remov me outlets un . eea q solids regularly • gi Manure, slurry or sludge • Agitation whe spreading; O Soil injection ofslurry/sludges; spreader outlets • Volatile gas emissions O Wash residual manure from'spreader after use; O Proven biological additives or oxidants Uncovered manure, • Volatile gas emissions while l7 Soil injection of slurry/sludges slurry or sludge on field drying [I Soil inc Irporation within 4$ hrs.; layers for rapid drying; surfaces O Spread m;thm.uniform biological additives or oxidants ❑ Proven Dead animals • Carcass decomposition 8 Proper disposition of carcasses el covering of carcasses in burial pits; Dead animal disposal + Carcass decomposition O O Comple Proper I tation/construction of disposal pits pits incomplete cdmbustion O SecondE stack burners incinerators .. —Ale n--- A Source Standing water around facilities Manure tracked onto public roads from farm access improper Microbial organic m Poorly m, Additional Information: Swine ManureManagement ; 0200 Rule/Bl Swine Production Farm Potential Odor Sour Swine Production Facility Manure Managen Swine Production Facility Manure Managen Lagoon Design and Management for Livest( Calibration of Manure and Wastewater Appl Controlling Odors from Swine Buildings; 1 Environmental Assurance Program; NPPC Options for Managing Odor; a report from Nuisance Concerns in Animal Manure Man; use B_MPs to Minimize Odor iage; D Grade and landscape such that water drains omposition of away from facilities o ined access roads IT Farm access road maintenance Olt Available From: Center -- — - --- _.._ NCSU, County Extension �P Packet es and Remedies; EBAE Fact She t' EBAE 128-88 NCSU-BAE NCSU - BAE `nt: Pit Recharge - Lagoon Treatment Int: Underfloor Flush - Lagoon Treatment; ; EBAE 129-89 NCSU - BAE NCSU - BAE ^k Manure Treatment and Storage; EBAE 103-83 NCSU -BAE ation Equipment; EBAE Fact Sheet NCSU -'Swine Extension H-33 � NC !Pork Producers Assoc �Ranual he Swine Odor Task Force ement: Odors and Flies; PRO 101,11995 Conference Proceedings NCSU Agri Communications Florida Cooperative Extension P A UnC - November 11. 1996, Page 5