Loading...
HomeMy WebLinkAbout20150916 Ver 2_SAW200901699permitverification1_20151016U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action id. SAW-2009-01699 County: Randolph U.S.G.S. Quad: NC-FAIR GROVE GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: NC Department of Transportation Richard Hancock Address: 1598 Mail Service Center Ralei�h, NC 27699-1598 Telephone Number: 919-707-6000 Size (acres) 1 acre (approximately) Nearest Town Nearest Waterway Little Uwharrie River Rivcr Basin Lower Yadkin USGS HUC 03040103 Coordinates Latitude: 35.7582 Longitude: -80A164 Location descriprion: The site is located along SR 1404 (Fuller Mill Road) over an unnamed tributary to the Little iJwharrie River at NCDOT Bridge #58 in Randolph County, North Carolina. The site is approximately 2500 feet north of the US Highwav 64, Fuller Mill Road intersection. Descnption of projects area and activity: This authorization is for the permanent and temporarv discharge of clean fill material associated with an existing brid�e replacement 8-5128) proiect as follows: Site #1: Permanent impacts within 871inear feet of stream associated with the replacement of the existing two span, 36 foot long brid�e with a 58 foot long, double barreled, 7 foot x 6 foot Reinforced Concrete Box Culvert (RCBC) on the existing allignment. These impacts are authorized under NWP #23; Site #1: permanent stream impacts for the placement of rip rap within 56 tinear feet of stream channel for bank stabilization. These impacts are authorized under NWP #13. Site #1: Temporary impacts to 95 linear feet of stream channel are associated with dewatering activities. These impacts are authorized under NWP #33. Site #2: Temporary impacts to 15 linear feet of stream channel. These impacts are authorized under NWP #33. Utility Site #1: 0.01 acre of temporary impacts for the relocation of a utility line. This impact is authorized by NWP #12. Applicable Law: � Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 23 Approved Categorical Exclusions; NWP 33 Temuorarv Construction, Access, and Dewaterin�; NWP 13 Bank Stabilization; NWP 12 Utilitv Line Activities. SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated 09/03/2015. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until thc cxpirarion date identified below unless thc nationwide authorization is modified, suspended or revolced. If, prior to the expiration date idcntified below, the nationwide permit authorization is reissucd and/or modified, this verification will remain valid unril the expiration date identified bclow, provided it complics with all requircments of thc modificd nationwide permit. If the nationwide permit authorization expires or is suspcnded, revokcd, or is modificd, such that the activity would no longer comply with the terms and conditions of the nationwide permit, acrivities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you mList contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, ar the Corps of Engineers regulatory program, please contact Andrew Williams at 919-554-4884 x26 or Andrew.E.Williams2(a�usace.armv.mil. Special Conditions: 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. 2. This USACE permit does not authorize you to take a threatened or endangered species, io particular, the Northern Long- eared Bat (NLEB) (Myotis septentrionalis). In order to legally take a listed species, you must have separate authorization under the Endangered Species Act (ESA) (e.g., a Biological Opinion (BO) under the ESA, Section 7, with "incidental take" provisions with which you must comply). The U.S. Fish and Wildlife Service's (USFWS's) Programmatic BO titled "Northern Long- eared Bat (NLEB) Programmatic Biological Opinion for North Carolina Department of Transportation (NCDOT) Activities in Eastern North Carolina (Divisions 1-8)," dated March 25, 2015, and adopted on Apri110, 2015, contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with "incidental take" that are speci�ed in the BO. Your authorization under this USACE permit is conditioned upon your compliance with all the mandatory terms and conditions (incorporated by reference into this permit) associated with incidental take of the BO. Failure to comply with the terms and condifions associated with incidental take of the BO, where a take of the listed species occurs, would constitute an unauthorized take, and would also constitute non-compliance with your USACE permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its BO and with the ESA. Digitalty signed by W ILLIAMS.ANDPE W.E1244561655 /, j�� DN: r-U5, o=U.S. Govemment, ou=DoD, �jy�{�{�t�% l��l/ ou=PKl,ou=USA, C��S ��gU1�1,0� O1�1C1�1. c^-WILLIAMS.ANDREW.E.1244561655 T��P. I O/I �/�oI � Date:2015.10.i50B:19�51-04'00' ll., 1 1 1 Expiration Date of Verification: 03/18/2017 Determination of Jurisdiction: A. ❑ Based on preliminary infonnation, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Secrion 10 of the Rivers and Harbars Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. � Thc jurisdictional arcas within the abovc described project arca havc becn identificd under a previous action. Please refcrence jurisdictional detcrmination issucd 8/25/2015. Action ID: SAW-2009-01699. Basis Fot' Detet'mination: The stream is a tributary to the Little Uwharrie River, which is a tributary to the Uwharrie River, a traditionally navigable water (TNW). The Uwharrie River is a tributary to the Pee Dee River, a navigable water of the United States. The Ordinary High Water Mark (OHWM) of the unnamed tributary was indicated by the following physical characteristics: bed and banks, clear natural line impressed on the bank, shelving, and the destruction of terrestrial vegetation. The wetlands meet the hydrophytic vegetation, wetland hydrology, and hydric soil criteria of the 1987 Corps of Engineers Wetland Delineation Manual and the Eastern Mountains and Piedmont Regional Supplement and are bordering/contiguous with the unnamed tributary. RemaYkS: Applicant may request an administrative appeal under Corps regulations at 33 CFR Part 331 prior to October 25, 2015. Administrative appeal form was provided with the jurisdictional determination dated August 25, 2015. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation ul USDA programs, you should request a certificd wetland detcrmination from the local officc of the Natural Resourccs Conscrvation Servicc, prior to starting work. F. AppealS Inf01'matlOn (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determinaYion for the above described site. If you object to this determination, you may request an administrarivc appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact shcet and request for appeal (RFA) form. If you r�quest to appeal Yhis determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Geargia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has bcen received by the Division Office within 60 days of the date of the NAP. Should you decidE to submit an RFA fonn, it must be received at the above address by 10 / 2 5/ 2 O l 5. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** qqq � `�fr Di9ltallysignedbyWILL1AM5ANDFCWS.12445 61 65 5 �� l , �A � DN�.r—US,o=U.S.Govemment,ou=DO�,ou=PKl,ou=llSA, Corps Regulatary Official: �='"�""' `" �de'«'"'"snNOaewE�znnse�ess O 15 08:19'.13 ��04'aa' Andrew Williams Date of JD: 08/26/2015 Expiration Date of JD: August 26, 2020 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our customer Satisfaction Survey online at http://re�ulatory.usacesurve. .�. Copy furnished: NCDOT Art King P.O. Box 1057 Aberdeen, NC 28315 Action ID Number: SAW-2009-01699 County: Randolph Permittee: NC Department of Transportation Richard Hancock Project Name: NCDOT/B-5128/Bridge No. 58 on SR 1404 (Fuller Mill Road North) over unnamed tributary/Div. 8/Randolph County Date Verification Issued: 10/15/2015 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams 3331 Heritiage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: NC Department of Transportation File Number: SAW-2009-01699 Date: 08/26/2015 Richard Hancock Attached is: See Section below 1NITIAL PROFFERED PERMIT PROFFERED PERMIT (Standarc PERMIT DENIAL Permit or Letter of permissi Permit or Letter of permissi APPROVED JURISDICTIONAL DETERMINATION PRELiMINARY JURISDICTIONAL DETERMINATION � C 0 0 � SECTION I- The following identifies yo�ir rights and options regarding an administrative appeal of the above decision. Additional information may be found at or htt��://wu�w.usace.army.mil/Missro��s/CivilWorizs/Regulatorypro�ramandPermits.as�x or the Corns re�ulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you inay sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Pennit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional detenninations associated with the pennit. OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. Yon must complete Section II of this fonn and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, ar(c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirery, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the fonn to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal ihe denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to norify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirery, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form inust be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision ar your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental infonnation that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: lf you have questions regarding this decision and/or the lf you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Attn: Mr. Jason Steele, Administrative Appeal Review Officer Andrew Williams CESAD-PDO 3331 Heritiage Trade Drive, Suite 105 U.S. Army Corps of Engineers, South Atlantic Division Wake Forest, North Carolina 27587 60 Forsyth Street, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For Permit denials, Proffered Permits and approved.Iurisdictional Determinations send this for�n to: Division Engineer, Commander, iJ.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137