Loading...
HomeMy WebLinkAbout090176_Permit Renewal Application 2019_20190410State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these pennits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2019. Please do not leave any question unanswered. Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Farm Number: 09-0176 Certificate Of Coverage Number: AWS090176 2. Facility Name: Burne\ Farm 3. Landowner's Name (same as on the Waste Management Plan): Willie L Beard 4. Landowner's Mailing Address: 3281 Rosindale Rd City: Clarkton State: NC Zip: 28433 Telephone Number: 910-520-3749 Ext. E-mail: 5. Facility's Physical Address: 1196 Rosindale Rd City: Clarkton 6. County where Facility is located: Bladen 7. Farm Manager's Name (if different from Landowner): 8. Farm Manager's telephone number (include area code): 9. Integrator's Name (if there is not an Integrator, write "None"): 10. Operator Name (OIC): Dale J. Me% er 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count State: NC Zip: 28433 Murphy -Brown LLC Phone No.: 910-271-4250 OIC #: 16301 Swine - Feeder to Finish 3,672 Operation Types: Swine Cattle Dry Poultry Other T% [peg Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses Wean to Feeder Dairy Heifer Laying Chickens Horses - Other Farrow to Finish Milk Cow Pullets Sheep - Sheep Feeder to Finish Dry Cow Turkeys Sheep - Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poulin Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) i.�LIYrx LI ABK 2 C1i2( Icu CtC+.tt BD ZOO ICI 417612.00 i I O 21! -7 2- Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), shined 131 the owner and a certified technical specialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name: Y V . . f-/ cA-yri Title: 0 Signature: L r"L Date: 1 CI Name: Title: Signature: Date: Name: Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 E-mail: 2019PermitRenewal@ncdenr.gov FORM: RENEWAL -STATE GENERAL 02/2019 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Willie L Beard Burney Farm 3281 Rosindale Rd Clarkton, NC 28433 NORTH CAROL INA Environmental Quality Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: February 27, 2019 Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits, which expire on September 30, 2019. Copies of the new animal waste operation State Non -Discharge General Permits are available at h<<ns://de:r.nc.k:ov/about/divisions/water-resources/water-uualit% regional-operations/afo or by writing or calling: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 In order to assure %our continued coverage under the State Non -Discharge General Permits, you must submit an application for permit coverage to the Division. Enclosed you will find a "Request for Certificate of Coverage Facilit► Currentl► Covered b% an Expiring State Non -Discharge General Permit," The application form must be completed, signed and returned by April 3, 2019. Please note that you must include one (11 coin of the Certified Animal Waste Manaeement Plan ICAWMP} with the completed and signed application form. A list of items included in the CAW/AP can be found on nage 2 of the renewal application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9100. Enclosures cc (w/o enclosures): Sincerely, Jon Risgaard, Section Chief Animal Feeding Operations and Groundwater Section Fa% etteville Regional Office, Water Quality Regional Operations Section Bladen County Soil and Water Conservation District AFOG Section Central Files - AWS090176 Murphy -Brown LLC etE NoK' Cstaa na De sTtrnent of Er r n rraenta gaol Y j p,vs or, of Water Resarro1: r 51-c N. Se?s3 . y St.' 1€3E MS : 'ti is Ce ater Ra ;gh , North C to"'na 27€$3-1n3 5 .�...�` 91.9.7072000 —,err 1/.R'ly Notification of Change of Ownership Animal Waste Management Facility (Please type or print all information that does not require a signature) APR 012019 In accordance with the requirements of 15A NCAC 2T .1304(c) and 15A NCAC 2T .1305(d) this form is ofieialthotification to the Division of Water Resources (DWR) of the transfer of ownership of an Animal Waste Mditgerne"ifi; lity cThis form must be submitted to DWR no later than 60 days following the transfer of ownership. General Information: Previous Name of Farm: C/ f -1 F/"rFacility Previous Owner(s) Name: Ins°) I i L C-'1"Q'fPhone ' o: New Owner(s) Name: (A/,) 1 )L. cfxtd Phone No: New Farm Name (if applicable): ,9 p g--• Mailing Address: Farm Location: Latitude and Longitude: / County: Please attach a copy of a county road map with location identified, and provide the location address and driving directions below (Be specific: road names, directions, milepost, etc.): _ - Operation Description: Type of Swine ❑ Wean to Feeder ❑ Wean to Finish ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish No. of Animals Other Type of Livestock: Type of Swine No. of Animals Type of Cattle No. of Animals ❑ Gilts ❑ Dairy ❑ Boars ❑ Beef Number of Animals: Type of Poultry No. of Animals ❑ Layer ❑ Pullets Acreage Available for Application: Required Acreage: Number of Lagoons / Storage Ponds: Total Capacity: Cubic Feet (ft3) ************************************************************************************ Owner / Manager Agreement I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the Certified Animal Waste Management Plan (CAWMP) for the farm named above and will implement these procedures. I (we) know that any modification or expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a permit modification before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25-year, 24-hour storm and there must not be run-off from the application of animal waste. I (we) understand that this facility may be covered by a State Non -Discharge Permit or a NPDES Permit and completion of this form authorizes the Division of Water Resources to issue the required permit to the new land owner. Name of Previous Land Owner: Signature: }� W- - L Date: 3 -AS- Name of New Land Owner: Signature: Name of Manager (if different from owner): Signature: Please sign and return this form to: Date: Date: Animal Feeding Operations N. C. Division of Water Resources Water Quality Regional Operations Section 1636 Mail Service Center Raleigh, NC 27699-1636 June 12, 2015 2/5/2018 NUTRIENT UTILIZATION PLAN Grower(s): Willie Be rd Farm Name: ABK - 2 B u.Y'Y�2.ta FGi f(Yl County: Bladen �J Permit Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars 3672 Storage Structure: Anaerobic Lagoon Storage Period: >180 days Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. APR 0' 1 2019 This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWR regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more:than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 11 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): Capacity Type 3672 Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars Waste Produced per Animal Total 3203 gal/yr 3861 gal/yr 10478 gallyr 191 gal/yr 776' gal/yr 927 gal/yr 1015 gallyr 2959 gaUyr gal/yr gal/yr gal/yr gal/yr gal/yr 3,403,944 gal/yr gallyr gallyr Total 3,403,944 gal/yr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity 3672 Type Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars Nitrogen Produced per Animal Total 3.84 Ibs/yr 6.95 ibs/yr 18.86 Ibs/yr 0.34 Ibs/yr 1.4 Ibs/yr 1.67 Ibs/yr 1.83 Ibs/yr 5.33 Ibs/yr Ibs/yr Ibs/yr Ibs/yr Ibs/yr Ibs/yr 6,132 lbs/yr lbs/yr Ibs/yr Total 6,132 Ibs/yr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and and utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: Total N Required 1st Year: Total N Required 2nd Year: Average Annual Nitrogen Requirement of Crops: Total Nitrogen Produced by Farm: Nitrogen Balance for Crops: 29.24 8290.83 0.00 8,290.83 6,132.24 (2,158.59) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 11 Reception Area Specifications Tract Field Irrigated Soli 1st Crop Time to _ Areea r e T e --__-- Code A /I T10981 T10981 T10981 1st Crop 1st Crop Lbs N/Ac L /Ac Utilized Yield Ib bs N 7ot Ilb 6� 34.5 ���� s N/Unit Residual a N 2nd Crop lima in Code q f 2nd Crop 2nd Crop Lbs N/Ac Lbs N Yield Ibs N/Unit Residual Total Ibs N Total b ` /Ac Utilized Lbs N/Ac �� NoA b �� 5.0 MOM 3780.855 SeiI A.� ���� --- �� 6.5 34.5 1083.6 Se F �� MEMO ������� 224.25 ����� 1264.5 2g50 WWI ������������'�'a����� 516 Total lbs N Utilized 1599.6 1645.875 8290.83 3(a) of 11 commercial fertilizer. The farm should produce adequate plant available nitrogen satisfy The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers tsnsome parts of North Th s plan only addresses nina to trogen. In a nutrient management plan that addresses all n forage must be removed In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), hay,and/or silage. Where grazing, plants should be grazed when they throughegrazing, be ed to a reach a height of soc to nine inches. here small grain,detc, is toobedr mhen ovedlforh ay or sare ilage, care height of four inches. Infieldsespecially late in the season (i.e. should be exercised not to let small grain reach maturity, ts too high and this will definitely interfere April or May). Shading may result if small grain with stand of bermudagrass. This loss of stand will result in reduced yieldsere heading anitrogen is being utilized. Rather than cutting small grain for hay or silage j the normal ider h situating, you are encouragedgtwo Lh three times during the season, depending on the to cut the small grain earlier. You may want to consider harvesting hay or shag time small grain is planted in the fall. October. Drilling is or early The ideal time to interplant broadcasting. tit stilt g. Bermudagrrass should bn, etc, is late e grazed or cut to a height of recommended over broadcasting. about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop This plan does not include to the requirements of the crops listed above. A B C B/C D E F G J K L M N 0 P S CC SWG Barley Grazed Hybrid Bermudagrass Hybrid Bermudagrass Hay Comb. Hybrid Bermudagrass Corn - Grain Com - Silage Cotton Grazed Fescue Fescue Hay Oats Rye Grazed Overseed Overseed Hay Grain Sorghum Wheat Soybean Pine Trees Small Grain Cover Crop Swithgrass Description -Harvested As Grain Crop Pasture/Grazed Hay Graze/Hay Combination Grain Crop Silage Cotton Lint Pasture/Grazed Hay Grain Crop Grain Crop Pasture/Grazed (Seeded in Bermudagrass) Hay (Seeded in Bermudagrass) Grain Crop Grain Crop Grain Crop Pine Trees Grain Crop/ Hay (After Grain Crop) Not Harvested; Burned/Disked In Biomass Crop be the usable acres ushown int the precedingripditches, odd areas unable to be irrigated, and perimeter areas notrequired ner fittapplication strips along not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 11 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications Fan -ow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish 3672 Feeder to Finish Gilts Boars PAN/yr/animal Farm Total/yr 0.8 0.96 3.9 0.07 0.27 0.34 0.39 0.55 1248.48' The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1248.48 pounds of plant available nitrogen per year and will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 6242.4 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 20 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 49.9392 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The applicationamountshould not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5 of 11 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr * inches T10981 1 GbA b 0.5 1 T10981 unc2 Dr b 0.5 1 T10981 unc3 NoA b• 0.5 1 6 of 11 Additional Comments: 7 of 11 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: ABK - 2 Owner: Willie Beard Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. 1/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWR before the new animals are stocked. 1/we understand that I must own or have access to equipment, primarily -irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWR upon request. Name of Facility Owner: Willie Beard Signature: / a" ER Date Name of Manager (if different from owner): Signature: Name of Technical Specialist: Affiliation: Address: Signature: Date Becky Spearman Bladen County Cooperative Extension POB 249 Eliazabethtown, NC 28337 Telephone: (910) 862-4591 \A9did f aili-naw�w 8of11 zipi8 Dat NUTRIENT UTILIZATION PLAN 1 2 REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, "allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding Tess than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See 'Weather and Climate in North Carolina" for guidance). 7 8 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. Animal waste shall not be applied to saturated. soils, during rainfall events, or when the surface is frozen. 9 of 11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 10 of 11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH.shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 11 of 11 Updated Crop Management Practices for Bermuda Winter Overseed This document, as approved by the Interagency Nutrient Management Committee on October 10, 2017, hereby modified the July 13, 1998 Memorandum "Crop Management Practices for Select Forages Used in Waste Management". This modification updates the application window protocol for the 100 lb Nitrogen PAN rate for both Cereal Rye and Annual Ryegrass, as well as winter small grains. • Farms utilizing the 100 lbs./ac PAN rate for the overseed are allowed to apply no more than 50 lbs./ac PAN from October 1 through December 31 and no more than 50 lbs./ac PAN from January 1 through March 31. • Applications made during the months of December and January cannot exceed the combined total of 25 lbs./ac PAN for the two -month period. • The last application of animal waste is to be applied to the bermuda crop prior to September 30. • The PAN rate for grazed systems must be reduced by 25%. All other requirements of the July 13, 1998 Memorandum continue to apply. Those requirements include but are not limited to: • Cereal rye and annual ryegrass should be planted by October 15 to provide the best opportunity to get winter growth. • A harvest is required prior to heading or April 7, whichever comes first, for both cereal rye and annual ryegrass. This is necessary to minimize the potential for shading of emerging bermuda and reducing its yield. To favor the production of bermuda, additional harvest of annual ryegrass will be required when the ryegrass canopy reaches 12-15 inches height. • These management requirements shall also apply to overseeded winter small grain. Nov 16, 2017 Go gle Maps 1194 Rosindale Rd Imagery ©2019 Google, Map data ©2019 Google 200 ft t— (k) �,. ( \ o \ 49.2 TOTL ACRES Vt I'NO1� WEIL4NDS A 1 49.2 NONWET - 7.4 EXIST. SITE - 2.6 PROP. SITE 39.2 AVAILABLE DALE MEYER SITE SCALE: 1 "= 400' 1 Qcre-s Go✓akd .nder -, EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWG.) r 0 9%-14,4 EMERGENCY MANAGEMNET SERVICES (EMS) 9p9/ R , ' /o SOIL AND WATER CONSERVATION DISTRICT (SWCD) ,+r77 gioa NATURAL RESOURCES CONSERVATION SERVICE (MRCS) coalg0:,-(093c. COOPERATIVE EXTERSION SERVICE (CES) reift)scv - 4q This- plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should nor wait until wastes reach surface- waters or leave you property to consider that you have a problem. You should make: every effort -to ensure that this does not happen. This plan should be posted in an accessible - location for all* employees at the facility. The following are some action items you, should. take. 1. Stop the release of wastes. Depending on the situation, this may ore may not be possible. Suggested responses to some possible problems are -listed belwa.. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that cause the runoff. e. Evaluate the application rates for the fields where runoff -occurred. C. Leakage from the waste pipes and sprinklers -action include: . a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. E Leakage from base or sidewall of lagoon. Often this is seepage as opposed. to flowing leaks -possible action: a. Dig a small sump or ditch from the embankmenrto catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals- and fill holes and compact- with a clay type soil. c. Have a professional evaluate the condition of the:side-walls-and_lagoon- bottom as soon as possible. 1' Z Assess the extent of the spill and note any obvious damages. a. Did the waste• reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off -the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours- call your DWQ regional office; Phone --. After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of - the spill, weather and wind conditions. The corrective measures thathave been under taken, and the seriousness of the sitution. b. If spill leaves property or enters surface waters, call local EMS phone number. c:• Instruct EMS to contact local Helath Department d. Contact CEs, phone number - , local SWCD office phone number - -, and local NRCS office for advice/technical assistance phone number - -. 4. if none of the above works call 911 or the Sheriff's Department and explain you problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize off - site damage. a. Contractors Name: b. Contractors Address: c. Contractors Phone: 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) W C�vw .5 `}1 f.-II ,1 a. Name: b. Phone: a✓F Fargo,", le 11 II �sY 1 T. Implement procedures as -advised by DM/ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste managment plan to keep problems with release of wastes from happening again. 2: INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Sp ecific Practices Flush Gutters Accumulation a solids: (Liquid Systems) ()f Flush system is designed and operated sufficiently to remove. accumulated soilds from gutters as designed. (remove- bridging of accumulated solids. at discharge Lagoons and Pits. Crusted Solids Excessive -Vegetative- Decaying vegetation •Growth • (WMaintain lagoons. settling basins and pits where pest breeding is apparent to minimize -the crusting of solids to a depth of no more than 6-8 inches over more than 30% of surface. hj Maintain vegetative control along banks of lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage ()Design, operate and maintain feed systems (e.g.. bunkers and troughs) to minimize the accumulation - of decaying wastage. () Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulations of feed residues 4 nima( Holding Areas. Accumulations of animal wastes and feed wastage- () Reduce moisture accumulation within and around. immediate perimeter of feed storage areas by insuring drainage away from site and/or providing_ adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). () Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed.. IR , —November 11, 1996 () Eliminate low area that trao moisture along fences' andother locations where waste accumulates and and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal. holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solids as needed). L7ry Manure Handling vstems Accumulations of animal -wastes. () Remove spillage- on a routine- basis (e.g. 7110 day interval during.sumrner; 15-30 days intervakduring winter) where- manure is loaded for land application or disposal. () Provide for .adequate• drainage. around_ mmriresto ies. O Inspect for and remove or break .up-accurre atedwastes in.filter stripes around. stockpilesand manure handrustt areas.as- needed_ he: issues checked ( ) pertain to this operation. The landowner/integrator agrees: to use sound judgment- inapplying :.Sect control measures as practical. certify the- aforementioned: insect -control Best Management- Practices have beery reviewed with me.. I-` l V ([anwner Sign ( r more information aantacr he Cooperative -Extension Service; Department of Entomology, Box 7613,.North Carolina State University, Raleigh, NC BSS-7613. CC —November 11, 1996 Source SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Cause BMP's to Minimize Odor Site: Specific Practices Farmstead Animal body surfaces Swine production Dirty manure -covered animals ( ) V getative or wooded buffers; Recommended best management practices; (:Komi judgment and common sense- (LYDry floors Floor surfaces: Wet manure -covered floors (-ed floors; (iV"terers located over slotted floors (pJ..;eders at high end of solid floors; ( Scrape manure buildup from floors; () Underfloor ventilation -for drying. Manure collection pits Urine Petital micorbiel decomposition - Ventilation exhaust fans Volatile gases; Dust Indoor surfaces Dust () Frequent manure removal. by flush,pit recharge,or scrape ( ) Underfloor ventilation ( ) Fan maintenance; () Efficient air movement () Washdown between groups of animals ( ) Feed additives; () Feeder covers; ( ) Feed delivery downspout extenders to feeder covers h tanks Flush alleys Agitation of recycled lagoon liquid whiles tanks are filling Agitation during wastewater conveyanance () Flush tank covers () Extend fill lines to near bottom of tanks with anti -siphon vents () Underfloor flush with underfloor ventilation Pit recharge points Agitation of recycled lagoon liquid while pits are filling () Extend rechard lines to near bottom.of pits with anti -siphon vents Lift stations Agitation during sump tank filling and drawdown () Sump tank covers Outside drain collection Agitation during wastewater or junction boxes, conveyance . () Box covers End of drainpipes at lagoon Agitation during wastewater () Extend discharge point of pipes underneath lagoon liquid level _agoon surfaces Volatile gas emissions 3iological mixing Agitation (Ei'P oper lagoon liquid caoacity ()Correct lagoon startup procedures ()/Minimum surface area -to -volume ratio It Minimum agitation when pumping () Mechanics! aeration () Proven biological additives r gation sprinkler nozzles High pressure agitation Wind draft M )C—November 11, 1996 legate on dry days with little or no wind- (IMinimum recommended operation pressure- () Pump intake near lagoon liquid surface- ( Pump from second -stage lagoon :orage tank or basin surface cittling basin surface Partial microbial decomposition Mixing while filling Agitation when emptying Partial micobial decomposition Mixing while filling Agitation when emptying () Bottom or midlevel loading () Tank covers () Basin surface mats of solids () Proven biological• additives or oxidants () Extend drainpipe outlets underneath liquid level ( ) Remove settled solids regularly manure, slurry or sludge spreader outlets Agitation when spreading Volatile gas emissions Jncovered manure, slurry sludge on field surfaces lead animals () Soil injection of slurry/sludges () Wash residual. manure from spreader after use () Proven biologicaladditives or oxidants Volatile gas emissions whiledrying () Soil infection of slurry/sludges () Soil incorporation within 48 hours- () Spread in thin uniform layers for rapid drying ( ) Proven biological additives or oxidants Carcass decomposition Proper disposition of carcasses .eed animal disposal Carcass decomposition () Complete covering of carcasses in burial pits "' () Proper location/construction of disposal pits ,cinerators Incomplete combustion 0) Secondary stack burners :ending water around ciiities Improper drainage Microbial decomposition of organic matter (,a'lirade and landscape such that water drains away from facilities -Rare tracked onto public Poorly maintained access roads arm access road maintenance 3 from farm access ditionai Information: +ire Manure Management. 0200 Rule/BMP Packet me Production Farm Potential Odor Sources and Remedies, ESAE Fact Sheet a Production Facility Manure Management: Pit Recharge —Lagoon Treatment; ESAE 128-88 me Production Facility Manure Management: Underfloor Ruse —Lagoon Treatment EBAE 129-88 con Desig and Management for Livestock Manure Treatment and Storage; ESAE 103-83 oration of Manure and Wastewater Application Equipment EBAE Fact Sheet :trolling Odors from Swine Buildings; PIH-33 ironmental Assuranc Program: NPPC Manual ions for Managing Odor, a report from the Swine Odor Task Force :erica Concerns in Animal Manure Management Odors and Flies; PRO1 O7, 1995 Conference Proceedings Available From: NCSU-County Extension Canter NCSU-BAE NCSU-BAE NCSU-BAE NCSU-BAE NCSU-BAE NCSU-Swine• Extension - NC Pork Produces Assoc NCSU Agri Communications. Ronda Cooperative Extension issues checked ( ) pertain to this operation. The landowner/integrator agrees to use sound judgment in applying control measures as practical. -rift' the aforementioned odor control Best Managment Practices have been reviewed with me. = November 11, 1996 Version —November 26, 2018 1_ Mortality Management Methods C , 1 ! W Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality ❑ ❑ ❑ ❑ I I ❑ ❑ ❑ ❑ ❑ Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. ❑ El In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). ❑ El Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. Signature of Farm Owner/Manager Date p 116 sect �c Signat re of Technical Specialist Date g Operator:DALE MEYER County: BLADEN Date: 09/21/94 Distance to nearest residence (other than owner): 1750.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish ) 0 sows (farrow to feeder) x 1417lbs. — 0 lbs 3672 head (finishing only) x 522 lbs. — 0 lbs 0 sows (farrow to wean) x 135 lbs. = 495720 lbs 0 head (wean to feeder) x 433lbs. = 0 lbs Describe other : 30 lbs. = 0 lbs — — 0 Total Average Live Weight = 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 495720 lbs. ALW x Treatment Volume(CF)/lb. ALW Treatment Volume(CF)/lb. ALW = Volume = 495720 cubic feet 1 CF/lb. ALW 3., STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet)----- Inside top width (feet)---------- 356.0 Top of dike elevation (feet) 287.0 Bottom of lagoon elevation (feet)-- ~l 104.7 Freeboard (feet)— -----.---- -- __ 93.7 Side slopes (inside lagoon) 1.0 3.0 : 1 495720 lbs Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 350.0 281.0 10.0 AREA OF TOP LENGTH * WIDTH = 350.0 281.0 AREA OF BOTTOM LENGTH * WIDTH = 290.0 221.0 AREA OF MIDSECTION LENGTH * WIDTH * 4 320.0 251.0 98350 (AREA OF TOP) 64090 (AREA OF BOTTOM) 321280 (AREA OF MIDSECTION * 4) CU. FT = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] DEPTH 6 98350.0 321280.0 * / 64090.0 1.7 l"mn A,»;1mkln — i2(h/',,j(hn (^II FT • 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 356.0 287.0 102172.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 102172.0 square feet Design temporary storage period to be 180 days. SA. Volume of waste produced Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 495720 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 905515 gals. or 121058.2 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = gallons/day * 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 59600.3 cubic feet 50. Volume of 25 year — 24 hour storm Volume = 7.0 inches / 12 inches Volume = 59600.3 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 121058 cubic feet 5B. 0 cubic feet 5C. 59600 cubic feet 50. 59600 cubic feet TOTAL 240259 cubic feet 6. SUMMARY per foot Temporary storage period Rainfall in excess of evaporation--- --> 25 year — 24 hour rainfall > Freeboard > Side slopes Inside top length Inside top width Top of dike elevation Bottom of lagoon elevation Total required volume — Actual design volume Seasonal high watertable elevation Stop pumping elev. Must be > or = to the SHWT elev.= =======) (SHWT) ==> * DA 180 7.0 7.0 1.0 3.0 356.0 287.0 104.7 93.7 735979 806200 100.0 100.9 100.0 days inches inches feet : 1 feet feet feet feet cu. ft. cu. ft. feet feet feet Must be > or = to min. req. treatment el.=> 99.7 feet Required minimum treatment volume— ------> 495720 cu. ft. Volume at stop pumping elevation --> 545398 cu. ft. Start pumping elev. > 103.0 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.— 24 hr. rainfall==> 746600 cu. Volume at start pumping elevation--------- ) 738278 cu. Required volume to be pumped > 180659 cu. Actual volume planned to be pumped > 192881 cu. Min. thickness of soil liner when required==> 1.6 feet 7. DESIGNED BY: APPROVED BY: DATE: DATE: of 23/9¢ NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: * ft. ft. ft. ft. * * SHEET 1 OF 2 OPERATION AND MAINTENANCE PLAN This lagoon is designed for waste treatment (permanent storage) and 180 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary, storage consists of 180 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also included is storage for the 25 year — 24 hour storm for the location. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed at the elevation to begin pumping, a permanent marker must be installed at this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain lagoon treatment depth. Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out. 1. It is strongly recommended that the treatment lagoon be pre — charged to 1/2 its capacity to prevent excessive odors during start—up. Pre —charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump —out of the lagoon when fluid level reaches the elevation 103.0 as marked by permanent marker. Stop pump — out when the fluid level reaches elevation 100.9 . This temporary storage, less 25 yr— 24 hr storm, contains 180659 cubic feet or 1351326 gallons. SHEET 2 OF 2 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. Refer to the waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a -vigorous stand. 5. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. Waste shall be applied in a manner not to reach other property and public right—of—ways. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ— mental Management, has the responsibility for enforcing this law. OPERATION Sc. MAINTENANCE PLAN Proper -lagoon liquid management should be a year-round priority. It is especially important to rriarmge levels so that you do not have problems during extended: rainy and wetperzodr Maximum storage capacity should be available fir the lagoon forpetiods when the receiving crop- is dormant (such as wintertime for beaaudagrass) or wires there arc exreaded:razny spells. sucir.as the thunderstorm season_ fir the summertime:. Thi= tharar first, signs of plant growth is the later. winter/eariyspring.,irrigation ar. gttr afar= waste mar gementplait should be done wheneverthe:lanctis dry enougirtos receivelagoon liquid_ This wilt. make storage space available is thelagoon: farfmmtiweta periods_ Dr the latesummerleatty fait the lagoon should: bepumped: dowry to thelovx mariter'(seePiigTreZ-1) to allow forwinterstorage_ Every effort shouid:be rnadetcr mainravz the -lagoon close to the m:hamurrr liquid level_ as long= as the weatherand waste: ,it iiir7tictrr pi= wilLallow it. Waiting until the lagoon has reached its maximum storage capacity beforestartingtcr irrigate. does not leave roam for storing excess. water during extended. wetpeziods. Overflow: from the -lagoon for any reason except a. 25--year, 24-hour storm- is: a:.vioiatiosof statelaw- and subject to penalty action_ The routine maintenance of a.lagoorr involves the following: .• Maintenance of a. vegetative- cover for the dam_ Fescue or common bermudagrassare the most: common vegetative covers_ The vegettion should be fertilized_ each year, if:needed, to. maintain- a_vigorous stand.. The amount of fertilizes applied shouldbe based on a_ soils test,. butitr the event that iris notpracticaL to obtain a. soils test each year, the lagoon- embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent_ Brush and trees on the embankment must be- controlled_ This- may be done by mowing; spraying, grazing, chopping; or a combination of these practices. This should be done arleast- once a_ year and possibly twice in years thr weather conditions are favorable_ for heavy vegetative- growth.. NOT If vegetation- is- controlled by spraying, the herbicide rnust not be allowed to enter thelagoorr waxer Such chemicals could harm the bacre ia..ur the lagoon thatare treating the•waste Mainrmmn = inspections of the entire lagoon- should be -made dining- the•initiaL filhngof thelagooir and at least monthly and after- major-rainfall_and storm events_ Items to be - checked; should include, as. a_ minimum, the following. WastelnletPipes;. RecyclingPipess,. and. Overflow Pipes—lookforr 1_ separation- of j oints- Z cracks or brew 3 _ accumulation- of salts: or. minerals: 4 overall condition- of pipes Lagoon surface --look for. L_ undesirable -vegetative growth ? floating or lodged debris Embankment—lookfor. L settlement, cracking, or "Jug" holes Z_ side slope stability —slumps or bulges 3. wet ordamg areas on the back slope: 4 . erosion due to lade of vegetation or as aresult of waveactuos 5. rodent damage Largerlagoons may be subject to liner damagedue: tcr wave action caused: by strong winds_ These waves can- erode the lagoon sidewails;„y weakening the lagoon dam A.good: stand_ ofvegetationwilireduce thepotential 0=17n caused.bywave:actiom. if wave action causes: serious damage to. a.lagoorr sidewall,. baffles in thelagoorr may be: usecLta reduce the waveimpacts.. Any of these features- could lead to erosion and weakening of the: dam-L. If yourIagaoirhas: any of these features, you should call an appropriate expert familiar -with design and constzuctioa of waste lagoons. You. may need to provide a temporary.fucif thereisa_tbrear of a -waste discharge. However, &permanent solution should. be reviewed by the techcn1 exper Any digging into a.lagoon darn with: heavy eguipmentis.a.serious undertaking_ witdpotentinily serious consequences and should not be conducted unless recommended by an appropriate tet hnicaL TransferPumos---check.forproper operatiorr of: 1_ recycling -pumps_ 2. irrigation pumps Check for leaks, loose fittings, and overall pump- operation_ Art unusually loudorginding: noise,. ora a amount ofvibratiorr, may indicate that - the -pump is in. need orreaairor NOTE: Pumping systems should be-inspected_and. op=ated_freauently enough: so thatyou are not completely "surprised" by equipment -failure. You should perform you . pwii system• maintenance at a time when your lagoon is. at its low level. This will allow some safety time should majorrepairs be required_ Saving_ a.neariy fail lagoon is notthetime: to•think about- switching-, repairing, or borrowing: pumps_ Probably, ifyourlag000ris.full,. yourneighbot s lagoon is full also. You_ should cone- g an inventory- of spare parts orPumPs- Surface water diversion features are -designed: to carry a1Lsurface drainage- waters (such as rainfall runoff, roof riminage; gutteroutletsr and parking lot runoff) away frorrr your- lagoon and other waste treatment or storage -structures . The only watartharshould be- corning front- your lagoon isthat whiclr comesfroinr yourflushing: (washing) system pipes: and therairzfalL thatitits the-lagoorr directly: You_ should inspect yourdiversion system- for -the following= 1. adequatevegetatiorr 2. diversion capacity 3. ridge. berm height Identified problems should be corrected promptly. It is advisable to inspect during or immediately following a heavy your system determine proper solutions, consult with �r � is needed to experts_ You. should record the level of the lagoon. just prior to when rain is predicted, and ther. record. the level again 4 to 6 hours after the- rain (assumes there is no pumping). gave you. an idea of how much your lagoon level will rise with a. certain p gl This will (you must also be recording your rainfall for this to work). Knowing this should t Planning irrigation applications and storage. If your lagoon rises excessivel iny as inflow problem from a surface water diversion or there maybe s Y' You into lagoon from the surrounding land. seepage the Lagoon: Operation Startup: 1 _ Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 3. Drainpipes into the lagoon should have a. flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during filling or another means of slowingthe incoming g initial the lining. water to avoid erosion of 2. Fill new Iagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 4_ When possible. begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full.lagoon liquid volume. This seeding should occourat least two weeks priorto the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 feet of lagoon liquid volume until the pH rises above 7.0. Optimum1000rc lagoon liquid_ pH is between 7.5 and 8.0. ?• A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a. technical specialist is recommended_ if these conditions occur for prolonged periods,. especially during the warm season. Loading. The more frequently and regularly that wastewateris added to a lagoon, the better -the. lagoon will function. Flush systems that wash waste into the es dailare optimum for treatment. Pit recharge systems, in which one olagoon more buildings are drained_ and aged each day, also work well. Management Practice water conservation —minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon Maintain lagoon liquid level between the permanent storage level. and_ the full temporary storage level. Place visible markers or stakes on the lagoon bank to show the - minimum liquid level and the maximum liquid. lever (Figure 2-1). Start irrigating at the earliest possible itt in the spring based on nutrient requirements and soil moisture so film -temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer/early fall to provide maximum lagoon storage for the winter. The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. Do not pump the lagoon liquid level lower that the permanent storage level unless you are removing sludge. Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. Prevent additions of bedding materials, long-stemmed forage orvegetation,. molded feed, plastic syringes, or other foreign materials into the lagoon_ Frequently remove solids from catch basins at end of confinement houses.or wherever they are installed. Maintain strict vegetation, rodent,and varmint control near lagoon edges_ Do not allow trees or large bushes to grow on lagoon dam or embankment Remove sludge from the lagoon either when the sludge storage capacity is - full or before it fills 50 percent of the permanent storage volume. If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a_ pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: proper lagoon sizing, mechanical solids separation of flushed waste, gravity settling of flushed waste solids in an appropriately designed basin, or minimizing feed wastage and spillage. 'Lagoon sludge that is removed annually rather than stored long term will: have more nutrients, have more odor, and require more land to properly use the nutrients. Removal techniques: Hire a custom applicator. Mix the sludge and lagoon liquid with a chopper -agitator impeller pump through large -bore sprinkler irrigation system onto nearby cropland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator, h n1 and spread onto cropland or forageland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragiine or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can dram back -- into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient- and metal values from the liquid. The application of the sludge to fields will. be limited by these nutrients as well as any previous waste applications to that field and crop requirement Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge lcnioved from the lagoon has a much higher phosphorus and.heavy metal content than. liquid_ Because of this it should probably be applied to land with low phosphorus and metal levels. as indicated by a soil test, andincorporated to reduce the chance of erosion.. Note that if the sludge is applied to fields with very high soil -test phosphores; it should. be applied only at rates equal. to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. The application of sludge will increase the amount of odor at the waste application site.. Extra precaution should be used to observe the wind direction and other conditions which - could increase the concern of neighbors. Possible Causes- of Lagoon Failure Lagoon failures -result in the unplanned discharge of wastewater -from the structure:. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam- Assuming proper design and construction, the owner -has the responsibility for ensuring structure safety. Items which may lead, to lagoon. failures include: Modification of the lagoon structure. —an example is: the place:neat of apipe in the dam without proper design and construction. (Consult an expertin lagoon design before placing any pipes is dams.) Lagoon liquid levels—highlevels_are a. safety risk Failure.to inspect and_ maintain the dant Excess surface water flowing into the: lagoon_ Liner integrity —protect from inletpipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater- table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon came gItilies to form in the dam. Once this damage starts, it can quickly. cause a large discharge of wastewater and possible dam failure.