HomeMy WebLinkAboutNCC240372_Site Plan or Location Map_20240214 1
ro
ABBREVIATIONS: 1
LEGEND
AWWA - AMERICAN WATER WORKS ASSOCIATION
SYMBOL (NEW) SYMBOL(EX.) DESCRIPTION BFE - BASE FLOOD ELEVATION
CL - CENTERLINE
0 UTILITY PEDESTAL(SIZE/SHAPE VARIES) CB - CATCH BASIN m j j o
CMP - CORRUGATED METAL PIPE I N
TREE/SHRUB(DIA.&TYPE SOMETIMES / / 1
NOTED) CONC - CONCRETE (\
C/O - CLEANOUT I m n
0 DO SEWER CLEAN-OUT CPP - CORRUGATED PLASTIC PIPE I
CT - COURT
100 — —100— — CONTOUR DI - DUCTILE IRON / \
DIP - DUCTILE IRON PIPE I I / \ \ /
100 +100 SPOT ELEVATION DR - DRIVE n N N
EX - EXISTING I '1A9999Arr
�.� —CL— nJ WOODS LINE,CLEARING LIMIT EOP - EDGE OF PAVEMENT I \'c),\ / / ^ m o
SEWER,sioRMWATER,&FIBER OPTIC FM - FORCE MAIN Q 1 0 $
O SO SD FO MH FW - FLOODWAY \%\
® iii ® CATCH BASIN/GRILL BASIN GV - GATE VALVE _ ,qc�
HDPE - HIGH DENSITY POLYETHYLENE — I \",{L i
®W WELL INV - INVERT I �ly�
IP - IRON PIPE - -�__ I \ 111
`Q+ `O., POWER OR TELEPHONE POLE LOD - LIMITS OF DISTURBANCE -�, /
,L LSE - LANDSCAPE EASEMENT
(} FIRE HYDRANT ASSEMBLY LF - LINEAR FEET
T T MIN - MINIMUM /
N 1 GATE VALVE MH - MANHOLE
MJ - MECHANICAL JOINT
—E — —0HE— UNDERGROUND/OVERHEAD POWER NIC - NOT IN CONTRACT
OC - ON CENTER /
�—UT UNDERGROUND TELEPHONE NTS - NOT TO SCALE
PE - PLAIN END
•o TEL OVERHEAD TELEPHONE PJ - PUSH-ON JOINT
PL - PROPERTY LINE \GAS LINE PP - POWER POLE BAILEY, FRANKLIN D JR BAILEY, RALEIGH CITY OF
PSI - POUNDS PER SQUARE INCH DONNA J PIN: 1619762696
—w—w— WATER LINE PIN: 9429PG1845 DB. 012224 PG. 00149
PV - PLUG VALVE DB. 007942 PG. 00922
PVC - POLYVINYL CHLORIDE p
ss ss SEWER LINE PVMT - PAVEMENT 43
^^ FM SEWER FORCE MAIN R/W or ROW - RIGHT-OF-WAY U \\\\IIIIII11111,11
R or RAD - RADIUS
iY N OARO(i,'',
sioRMWATER PIPE RCP - REINFORCED CONCRETE PIPE ^ TEMPORARY _fa �F QjE
REQ'D - REQUIRED CONSTRUCTION ENTRANCE -- EA
r0—r0— UNDERGROUND FIBER OPTIC LINE RD - ROAD ; = 046286
RJ - RESTRAINED JOINT - OS-V7-23 /
s x * x FENCE STA - STATION - ___ •fNGINEE
SR - SECONDARY ROAD (STATE) - '/ 'xirfFFREYRP `
PROPERTY LINE THK - THICK r ✓ y" ``
/llllllllllll\\\\\\
SEAL NOT VAUD UNLESS SIGNED AND DM
TOS - TOP OF SLAB
— — — — PERMANENT EASEMENT OR R/W TS&V - TAPPING SLEEVE AND VALVE DE BENTON MAINTENANCE BUILDING
TYP. - TYPICALL
I I STRUCTURE OUTLINE(SHAPES VARY) U/G - UNDERGROUND _
U.N.O. - UNLESS NOTED OTHERWISE 1.4e;0 TEMPORARY BENCH MARKUT - UNDERGROUND TELEPHONE® ® WATER METER W/ - VERTICAL /W/ WITHLWL - WATER LINE �'���
4*,
® SEWER ABANDONMENT _ 3-VB��
WWF - WELDED WIRE FABRIC OR FENCE _ �/ •/
LIGHT POLE # or LB - POUNDS GARNER CHURCH OF GOD 5, / / \ HIGHFILL
5/SD-1 - DETAIL CROSS-REFERENCE (DETAIL 5 ON SHEET SD-1 IN THIS EXAMPLE) PIN: 1619660695 ,,, \ INFRASTRUCTURE
�O PROPERTY OR VW MONUMENT DB. 010250 PG. 01857 3
w� 'Y /' ENGINEERING, P.C.
A GUY WIRE /� A fib \
r^ 2703 Jones Franklin Rd,Suite 201
_0— SIGN
Cary,NC 27518
0 DE BENTON WATER TREATMENT PLANT \i/ / j8
3 �'' L'e" ` Tel M19-481-4342
I I PIPE CASING 0.
K
MAILBOX m\ \ B\ www.hiepo.00m
Fir�`mm License No.C-2586
PLANT MAIN ENTRANCE / \\ \
1
-- TEMPORARY CONSTRUCTION EASEMENT
1 / Engineering is our profession.
WETLANDS BOUNDARY BUFFALOE ROAD ----/ / / m AU
�R_2711 _ /f'/� "��\ Service is our passion.
SUBSURFACE TEST BORE /\ J
X / 0 33e—f 3JB N� m
ITEM TO BE REMOVED _l / /�y13/ / /3UB
I////� ASPHALT/CONCRETETORA REMOVAL& ' r+r // �8\ \1 \\ eJ
RESTORATION / �� / p 6� 0 \\\\"\ -,
—000—000— LIMITS OF DISTURBANCE LINE ,,,\,
/
B
�� / I am 0
—iM—iM— —Tcn—Tco— TREE CONSERVATION AREA LINE B\. I
'� \\ Z
\y/ MAUS CREOPERMIT/RECORD BOX LOCATION ro I / \ J
�❑ CONCRETE WASHOUTz''(
\� .jj9 / I \ CO 0
—sr—.— SILT FENCE / �p �ru �F / m \\ L1_I Q
k 0 \ O = 0
—rP—m— TREE PROTECTION FENCE \�� / \ / ) \\ z 0 O
—sr/m—srnP— PARALLEL SILT FENCE&TREE l/ //\7 1 '�l m z a z J
PROTECTION FENCE
�a 30__3+3 /3J6 \ w d W
„ SILT FENCE OUTLET / 3jB I 1 L�
� I T I I I I T I I I z oZ
'•IC
PIPE INLET PROTECTION / / 1 1/ I In I I I
`� CHECK DAM \`k / _ - OREGON TRAIL _ - I z U Q
7 / / / 1 I 0 0
El INLET PROTECTION �. I / >
CWATTLE \ FW / / / " - _ / / I I w O
EROSION CONTROL MATTING \ \ / 120
17--.., LJ
IT
�����ieel TEMPORARY CONSTRUCTION ENTRANCE \ \ / / 4 /m`
' -Z-I- fl
_P�A�I RIP-RAP BANK STABILIZATION
V;///21 SITE LOCATION
STREAM STABILIZATION
SCALE: 1" = 200'
-EWE-EWE- BASE FLOOD ELEVATION
-rw-rw- FLOODWAY EXTENTS PROJECT SD.
RAL21 02
C-0.1