HomeMy WebLinkAbout20151070 Ver 1_Application_20151014 < 4, HANSON LETTER OF TRANSMITTAL TO: NC Division of Water Quality DATE: 10/13/15 PROJECT NO. 15RO114 WBSCP Unit ATTENTION: Roberto Scheller 512 North Salisbury Street RE: Pre-Construction Notification Raleigh,North Carolina 27604 Bridge E.C. 59.3 Bent Replacements WE ARE SENDING YOU ® Attached ❑ Under separate cover via the following items. ❑ Shop drawings Prints ❑ Reproducible Sketches Specifications ❑ Copy of letter Change order ❑ Calculations Other COPIES DATE - `R't«9­"_NO:, DESCRIPTION ACTION aT 5 10/13/15 Pre-Construction Notification Permit Applications 2 10/13/15 Bridge E.C.59.3 Bent Replacement 11 x 17 Plans 1 10/13/15 Bridge E.C.59.3 Bent Replacement 22 x 34 Plans 1 10/13/15 Minor Water Quality Permit Fee THESE ARE TRANSMITTED as checked below: A ® For approval F ❑ No exceptions taken J � Rejected-see remarks B ❑ For your use G ❑ Furnish as corrected K F—] Submit ❑ Copies for distribution C ❑ As requested H Revise and resubmit L ❑ Return El corrected prints D ❑ For review and comment j Submit specified item M ❑ Other-see remarks E ❑ FOR BID DUE N El RETURNED PRINTS AFTER LOAN TO US REMARKS The following attachments include Pre-Construction Notifica 'on Permit Applications,Bridge E.C. 59.3 Bent Replacement Plans (11 x 17 and 22 x 34),and a Minor at r Quality P rm' ee. COPY TO: File, SIGNED: If enclosures are not as noted,please notify us at once. Hanson Professional Services Inc. 13801 Riverport Drive, Suite 300 •St. Louis, MO 63043 • Phone (314) 770-0467 Fax (314) 770-0428 Hanson Professional Services Inc <O! HANSON 13801 Riverport Drive,Suite 300 St Louis,Missouri 63043 Engmeenng I Planning I PAW Services (314)770-0467 Fax (314)770-0428 www hanson-inc corn October 13, 2015 2 0 7 5 0 7 Tom Stevens Roberto Scheller Washington Regulatory Field Office NC Division of Water Quality U.S. Army Corps of Engineers WBSCP Unit 2407 West 5th Street 512 North Salisbury Street Washington, North Carolina 27889 Raleigh, North Carolina 27604 Re: Pre-Construction Notification L: m n I Bridge E.C. 59.3 Bent Replace e is Norfolk Southern Railway New Bern, Craven County, North Carolina S Dear Mr. Stevens and Mr. Scheller: Norfolk Southern Railway (Norfolk Southern) requests Section 404/401 permit authorization for minor impacts to waters of the United States associated with the replacement of eight (8) bents within the existing railway Bridge E.C. 59.3 south of New Bern in Craven County, North Carolina. Bridge E.C. 59.3 is a swing span bridge with 55 steel bents crossing the Trent River. Norfolk Southern plans to replace the five (5) bents south of the swing span and three (3) bents north of the swing span as part of long-term maintenance of the bridge. Hanson Professional Services Inc. (Hanson) is serving as the authorized agent for Norfolk Southern, the applicant. The following sections and attachments, including the Pre-Construction Notification, provide notification for the minor impacts to the Trent River associated with replacement of the eight (8) bents within Bridge E.C. 59.3. Attachment A—Pre-Construction Notification Attachment B—Bent Replacement Plans Attachment C—Figures Attachment D— USFWS IPac Report PROJECT DESCRIPTION The purpose of the project is to replace eight (8) deteriorated bents on Bridge E.C. 59.3. The new bents will be placed within the same footprint as the existing bents. Bridge E.C. 59.3 is located at Latitude 35.099673 and Longitude -77.041407 south of New Bern in Craven County North Carolina. The bent replacement plans are included in Attachment B and the project location can be seen on figures in Attachment C. Bridge E.C. 59.3 crosses the Trent River and is composed of 55 bents and a swing span. The proposed bent replacement will replace the five (5) bents south of the swing span and three (3) bents north of the swing span. The existing bents will be cut off as close to the surface as possible. The bents being replaced were installed in 1989. Installation of the new bents will impact less than 0.001 acre of the Trent River. 15R0114 - 2 - All construction materials will be hauled by rail cars to the site and will be stored in upland areas along the Norfolk Southern right-of-way. Installation of the new bents and removal of the existing bents will occur from barges to further minimize the overall impact of the project. Due to the methods of construction, impacts to waters of the United States will be minimal. THREATENED AND ENDANGERED SPECIES INQUIRY Hanson collected information from the U.S. Fish and Wildlife Service (USFWS) IPaC web site regarding species of concern in the area of Bridge E.C. 59.3. The IPaC database listed nine species potentially within the range of the bridge. Due to the methods of construction the project will have a minimal impact to the Trent River. Construction activities will also occur between October 1 st and February 13th to avoid impacts to anadromous fish species. The IPaC correspondence is included in Attachment D. REQUEST FOR AUTHORIZATION On behalf of Norfolk Southern, we respectfully request Section 404/401 permit authorization for impacts to waters of the United States associated with replacement of eight (8) bents within Bridge E.C. 59.3. The Pre-Construction Notification is included in Attachment A to initiate the permit process. Thank you for your time and attention regarding this project. Please contact me at 314-942-5287 if you have questions or need additional information. Sincerely, HANSON PROFESSIONAL SERVICES INC. qeNL�f --.)�t-- Jennifer A. Sunley Biologist Attachments 15RO114 ATTACHMENT A PRE-CONSTRUCTION NOTIFICATION 15R0114 13 V4 waL'."? Office Use Only: Corps action ID no. ®� : < DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s)of approval sought from the Corps: ❑X Section 404 Permit ❑X Section 10 Permit 1 b. Specify Nationwide Permit(NWP)number: 3 or General Permit(GP)number: 1c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s)of approval sought from the DWQ(check all that apply): ❑- 401 Water Quality Certification—Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification—Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit: because written approval is not required? 401 Certification: ❑Yes ❑X No ❑Yes ❑X No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank ❑ Yes ❑X No or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑x Yes ❑No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑X Yes ❑ No 2. Project Information 2a. Name of project: Norfolk Southern Bridge EC-59.3 2b. County: Craven 2c. Nearest municipality/town: New Bern 2d. Subdivision name: N/A 2e. NCDOT only,T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s)on Recorded Deed: North Carolina Railroad Company 3b. Deed Book and Page No. 0068 0312, recorded 10/02/1867 3c. Responsible Party(for LLC if applicable): 3d. Street address: 2809 Highwoods BLVD Suite 100 3e. City, state,zip: Raleigh, North Carolina 27604 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form—Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other,specify: Owner/Norfolk Southern Railway 4b. Name: Jackson Owens 4c. Business name Norfolk Southern Railway (if applicable): 4d. Street address: 1200 Peachtree Street, NE 4e. City, state,zip: Atlanta, Georgia 30309 4f. Telephone no.: 404-527-2533 4g. Fax no.: 404-527-2589 4h. Email address: jackson.owens@nscorp.com 5. Agent/Consultant Information (if applicable) 5a. Name: Jennifer Sunley 5b. Business name Hanson Professional Services (if applicable): 5c. Street address: 13801 Riverport Drive, Suite 300 5d. City, state,zip: Saint Louis, Missouri 63043 5e. Telephone no.: 314-942-5287 5f. Fax no.: 314-770-0428 5g. Email address: jsunley@hanson-inc.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 7-RAILRD-NCRR 1 b. Site coordinates(in decimal degrees): Latitude: 35.099673 Longitude: -77.041407 1 c. Property size: 195 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Trent River 2b. Water Quality Classification of nearest receiving water: Trent River 2c. River basin: White Oak 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Bridge EC-59.3 is an active rail bridge that crosses the Trent River just south of New Bern,North Carolina See location maps included in attached report. 3b. List the total estimated acreage of all existing wetlands on the property: 0.0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial)on the property: 1,900 3d. Explain the purpose of the proposed project: The purpose of the project is to replace 8 deteriorated sections of bridge EC-59.3 to maintain reliable rail service 3e. Describe the overall project in detail, including the type of equipment to be used: Five bridge sections south of the swing span and three bridge sections north of the swing span will be replaced within the alignment of the existing brad 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ❑Yes ❑X No ❑ Unknown Corps or State been requested or obtained for this property/ project(including all prior phases)in the past? Comments: 4b. If the Corps made the jurisdictional determination,what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes,who delineated the jurisdictional areas? Agency/Consultant Company: Name(if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑Yes ❑No ❑X Unknown this project(including all prior phases)in the past? 5b. If yes, explain in detail according to"help file"instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form—Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project(check all that apply): ❑ Wetlands ❑ Streams—tributaries ❑ Buffers ❑X Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site,then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps(404,10)or impact Permanent(P)or DWQ(401, other) (acres) Temporary T W1 Choose one Choose one Yes/No W2 Choose one Choose one Yes/No W3 Choose one Choose one Yes/No N/4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g.Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts(including temporary impacts)proposed on the site,then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER)or Type of Average Impact number intermittent(INT)? jurisdiction stream length Permanent(P)or width (linear Temporary(T) (feet) feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h.Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form—Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds,estuaries,tributaries,sounds,the Atlantic Ocean, or any other open water of the U.S.then indivii ually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact(acres) Permanent(P)or type Temporary T 01 P Trent River Bridge Other 0.001 O2 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f.Total open water impacts 0.001 4g. Comments: Eight(8)deteriorated sections of the existing rail bridge will be replaced. The new bridge sections will be replaced along the same alignment as the existing structures. Please see the attached letter and project plans for additional information. 5. Pond or Lake Construction If pond or lake construction proposed,the complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts(acres) Stream Impacts(feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f.Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts(for DWQ) If project will impact a protected riparian buffer,then complete the chart below. If yes,then individually list all buffer impacts below. If any impacts require mitigation.then vou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑Tar-Pamlico ❑ Catawba ❑ Randleman ❑Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number— mitigation impact impact Permanent(P)or required? (square (square Temporary T feet) feet B 1 Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h.Total Buffer Impacts: 6i.Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The eight(8)bridge sections will be replaced within the same alignment as the existing sections. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The eight(8)bridge sections will be replaced within the same alignment as the existing sections minimizing impacts to the Trent River. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ❑X No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by(check all that apply): ❑ DWQ ❑Corps ❑ Mitigation bank 2c. If yes,which mitigation option will be used for this ❑ Payment to in-lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: Type: Choose one Quantity: 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested(DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal)wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A Page 6 of 10 PCN Form—Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules)—required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes ❑X No buffer mitigation? 6b. If yes,then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f.Total buffer mitigation required: 6g. If buffer mitigation is required,discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan(required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes,then is a diffuse flow plan included? If no, explain why. ❑Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0.0 % 2b. Does this project require a Stormwater Management Plan? ❑Yes 0 No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The proposed replacement of eight(8)sections of the existing bridge will not increase the overall imperviousness of the existing bridge structure. 2d. If this project DOES require a Stormwater Management Plan,then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply(check all that apply): F]E]❑Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state-implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑Yes ❑ No Page 8 of 10 PCN Form—Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation(DWQ Requirement) 1 a. Does the project involve an expenditure of public(federal/state/local)funds or the ❑Yes ❑X No use of public(federal/state)land? 1 b. If you answered"yes"to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑No (North Carolina)Environmental Policy Act(NEPA/SEPA)? 1c. If you answered"yes"to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Yes F1 No Comments: 2. Violations(DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules(15A NCAC 2H .0500), Isolated Wetland Rules(15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, F1 Yes ❑X No or Riparian Buffer Rules(15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑Yes ❑X No 2c. If you answered"yes"to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts(DWQ Requirement) 3a. Will this project(based on past and reasonably anticipated future impacts)result in F1 Yes ❑X No additional development,which could impact nearby downstream water quality? 3b. If you answered"yes"to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered"no,"provide a short narrative description. 4. Sewage Disposal(DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge)of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form—Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ®Yes ❑No impacts? 5c. If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPac database. An official species list is included in Attachment XX in enclosed report. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as essential fish habitat? ®Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Spoke with Shawn Staples with the Division of Marine Fisheries. Construction activities will occur after October 1 st. 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a. Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ®No status(e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The eight(8)bridge sections being replaced were installed in 1989. 8.Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain? ®Yes ❑No 8b. If yes,explain how project meets FEMA requirements: The bridge opening will remained unchanged after construction. The new bridge sections will be installed within the footprint of the existing bridge. 8c.What source(s)did you use to make the floodplain determination? Jackson Owens 10/9/2015 Applicant/Agent's Printed Name icant/Agent's Signature Date (Agent's sl6nature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 ATTACHMENT B BENT REPLACEMENT PLANS 15R0114 28'-,,. ,T•-6 • INDEX OF SHEETS SHEET SHEET TITLE NO EXISTING SWING SPAN 1 EXISTING PROFILE 2 PROPOSED PLAN d PROFILE 3 STEEL BENT REPLACEMENT 4 CONCRETE ENCASEMENT d MISC DETAILS NORTH TO NEW BERN. NC SOUTH TO JAEfS CITY. NC NOTES THE DESIGN LIVE LOAD IS COOPER'S """'-'-"-""--- EBO WITH DIESEL IMPACT DRAW PILES ARE TO BE DRIVEN TO 100 TON CAPACITY T ENDERS EXISTING AND PROPOSED BENT LOCATIONS ARE TO BE VERIFIED BEFORE DRIVING PILE H O U S E AN ACCURATE LOG OF ALL DRIVEN PILE IS TO BE KEPT AND FURNISHED TO THE OFFICE OF CHIEF ENGINEER -------- -------------------- BRIDGES d STRUCTURES WORKMANSHIP SHALL BE IN ACCORDANCE WITH CURRENT AREMA ................ -----, GUIDELINES FOR CONCRETE AND STEEL STRUCTURES AND FOUNDATIONS ALL STEEL PILE SURFACES BENEATH PROPOSED CONCRETE ENCASEMENTS SHALL BE CLEANED AND PAINTED USING INTERZONE 954 IN ACCORDANCE NORMAL MATER SURFACE WITH MANUFACTURER'S Li WATER o.s' ACE RECOMMENDATIONS EXISTING PROFILE NORTH APPROACH SCALE 'Yz = 1' u 0 AFE NO: F-02096 STORE N0: 8045 NORMAL WATER SURFACE ELEV 0.5' N- ^_ I REV BY OATS DESCRPTION _ NORFOLK SOUTHERN - PIEDMONT DIVISION EDBU DISTRICT OFFiCC OF CHEF ENGNEER.BROGES 4 STRUCTURES ATLANTA,GA EXISTING PROFILE EXISTING PROFILE SOUTH APPROACH BRIDGE EC-593 NEW BERN,NC SCALE ',s' = 1' OVER TRENT RIVER DON JBO VA-REG HM NVRTO 03694 A own WEFosT EC-59 3 cHK FEE BROO13916 DATE JULY 17,2015 SHEET No 1 OF 4 ORAWNG No EC 59 3 15 01 : DRAW TENDERS HOUSE _ 2B•_',' ---- -t-- T— PIERS B'- ......::::::::::SO:-C L'::::.::........ q•_1 I I -- ' 1 I wt 6x51 -9'-2" - w16x51-10-4" wt 6x51 -t0'-4" F E F E: E Flu u 2-0 5-z z•o z -0 6-A 1 T -B 9 9-3 �.IFFENER PLATE __ I EXISTING�—Ii NORNASUWATER I EXISTING III I II ACE ELEV 0.5' 4/- I ^ 11 -r--T li 1 1 1 1 1 1 I i I I i SEE BENT CONCRETE ENCASEMENT ADDITION DETAIL I I I I PROPOSED PROFILE NORTH APPROACH SCALE ',z• = 1' 12-2'" PIERS I 1 DIA x 6'AST,A325 BOLTS NEW TOP OF STEEL ELEVATION wI TN SS 63 NUTS 6 F<36 WASHERS TO MATCH EXIST INO TOP OF STEEL �'�STIFFENE fDR HE w TIE DECK LATE ST I 1 W16%5T -12'-2' W16x57-12'-2' W16x5T-12'-2" W16x51 -12'-2' — I 1 I NORMAL WATER I =1= 1 u u I F E F ELEV OSSRFA%E E F E E F - -, 2-o a*z z-0 2-o B -z z-o z-o a-z z- I AFE N0: F-02096 — 11 -2" B il'-6q R 11 -6� B 11 -3,a r FISTING I I IEXISTINGI ' t o STORE N0: 8045 EX I i ill I I I u REV By DATE I DESCRPTOH NORFOLK —t— &JVkiQP SOUTHERN PIEDMONT DIVISION I--� --I EDBU DISTRICT SEE BENT CONCRETE ENCASEMENT ADDITION OFFICE OF CHEF ENONEER-BROGES L STRUCTURES ATLANTA GA DETAIL I i I i i i EXISTING PROFILE ' BRIDGE EC-59.3 - NEW BERN,NC PROPOSED PROFILE SOUTH APPROACH OVER TRENT RIVER SCALE 1'Z' = 1' DON J80 I vAL REC Nw 1vRN1 D11"1.0— MLEPOST EC-59.3 cra FLE BR0013916 DATE JULY 17. 2015 SHEET NO 2 OF 4 1 ORAwWw No EC-59.3 15 01 _ FABRICATED STEEL REQUIREMENTS 2L3',{x3'4*xLv' WORKMANSHIP SHALL BE IN ACCORDANCE WITH CURRENT AREMA GUIDELINES FOR STEEL STRUCTURES ST fFENF3R PLATE ST — — THE FABRICATOR SHALL BE CERTIFIED 3�F'x 4 x 1'-3' UNDER THE AISC DUALITY CERTIFICATION DRAW ALL STRUCTURAL OSTEEL MEMBERS AND TENDERS irP A L COMPONENTS SHALL CONFORM TO ASTM ANGLE TD A992 OR A709 GRADE 50 AS APPLICABLE WEB CDNN. TRACK a BRIDGE k THE W16x57 BEAMS ARE FRACTURE HOUSE CRITICAL MEMBERS (FCM) AND SHALL W16x57 STRINGERS MEET THE IMPACT TEST REOUIREMENTS AS SET FORTH IN AREMA CHAPTER 15. W12z35 DIAPHRAM -5 SECTION 1.14: NOTCH TOUGHNESS AND BE To STIFFENER TESTING REOUIREMENTS SHALL BE BASED SOLE PLATE PLATE ST ON A MINIMUM SERVICE TEMPERATURE OF SECTION C—C -30 DEGREES FAHRENHEIT (ZONE 2) CiL 3'•' t -sS,. t-V-5-V-5- 3-6' 1 -5 -5 11 SCALE'•i=1" AS L NOTED AOTHERWISE; AILL HOLES EXCEPT S71FF�NER PLATE BA 11 o SHALL BE DRILLED FULL-SIZE OR 1 I / SUBDRILLED AND REAMED 2'•'2'•' " FASTENERS SHALL BE 7" DIAMETER ASTM A325 BOLTS WITH A563 NUTS AND F436 WASHERS: BOLTS SHALL BE I L3,n x3,,.xyr. TIGHTENED USING THE TURN-OF-NUT / METH DO TO OBTAIN A MINIMUM TENSION OF 39 KIPS CLEAN A PAINT ALL P ANCHOR BOLTS SHALL BE 1" DIAMETER E%POSED STEEL SURFACES ti [ _ I I I ASTM A325 BOLTS WITH A563 NUTS AND u51NC INTERZONE 954 9 F436 WASHERS A xP1iING SHALL WELDS MEEETA THE WREOUIIREMENTSDOFE THE NEN 12 L BRACING OD PIPE PILE � ISEE PILE TD AWS BRIDGE WELDING CODE Dt.S DETAIL 2-D L, ONLY THE SUBMERGED ARC WELDING (SAW) PROCESS OR SHIELDED METAL ARC WELDING (SMAW) PROCESS MAY BE USED. A D LINE I ' I I ' I I I CONCRETE ENCASEMENT D I APHRAM CONNECTIONS AND WELDERS SHALL BE AWS-CERTIFIED ELEV-10.0' +i- 1 I I I 1 I I I I ' I , DETAIL SCALE '•, -1' IN ALL WELDING POSITIONS 1 ALL FABRICATED STEEL SHALL BE SHOP-PAINTED IN ACCORDANCE WITH CURRENT NORFOLK SOUTHERN LONGITUDINAL VIEW SPECIFICATIONS USING AN APPROVED INORGANIC ZINC-ACRYLIC SYSTEM WITH PROPOSED ELEVATION OF BENTS BLACK FINISH SCALE''e=1' ALL WELDS AND WELDING PROCEDURES SHALL MEET THE REOUIREMENTS OF THE AWS BRIDGE WELDING CODE D1.5 ELECTRODES FOR SHIELDED METAL ARC WELDING SHALL MEET THE REQUIREMENTS OF AWS A5.1 AND SHALL BE OF THE LOW HYDROGEN CLASSIFICATION THE CAP BEAMS AND BEAM SPAN SHALL �L ATEE PA 3'-0' BE SHIPPED FULLY ASSEMBLED. AND SOLE PLATES AND LOOSE STIFFENER PLATES SHALL BE SHIPPED ON PALLETS •1 _ -I—- —_ - - - TNIBRSE PLA ESS a TOP FLANGES MATERIAL REQUIRED 1-2-q, 2-T 1 -2'z 1 -2'z 1 -9'i OTY ITEM 123,4" DO x •B" WALL THICKNESS x 60' PIPE CAP BEAM PLAN 30 PILE. ASTM A252 GRADE 2. 1.5 TONS EA 45 TONS SCALE ''4" = 1' 20 APF P13006 CONICAL POINT FOR 123," PILE 20 APF S-20000 SPLICER RING FOR 123 " PILE 24 20' REBAR CAGE FOR 123'" OD PILE 200 LB EA 2'-0' 2'-0' 6'-4• 2'-0• QQ W12x35 PIPE PILE CONCRETE. 5000 PSI 36 CU.YD. AFE NO: F-02096 DIAPHRAM HP12x53 BRACING, ASTM A572 GRADE 50 100 LF STORE NO: B045 INTERZONE 954 18 GAL 5 W14x159 x 11'-0" CAP BEAM DIAPHRAM f NER PLATE BA1 7" x ,"CONNECTION W16z51 Sifl INGER } I 4 W16x57 x 9'-2" STRINGER. 523 LB EA 2090 LB (V' DETAIL 8 W16x57 x 10'-4" STRINGER. 589 LB EA 4710 LB REV aY DATE OESCRPTIOH 'i SMOCK PAD z SOLE PLATE 1 T SOLE PLATE x 16 W16x57 x 12'-2" STRINGER. 694 LB EA 11096 LB ° r14x159 ' •i BASE PLATE PA '.z BASE PLATE PA II '"SHOCK 112 STIFFENER PLATE ST1 33'" x 3'" x 1'-3" NORFOLK 11'-O'CAP BEAM I II PAD 28 l'-5" W12x35 DIAPHRAMS. ASTM A36 SOUTHERN g si IFFE R MATE BA 14 3'-5" W12x35 DIAPHRAMS. ASTM A36 T••' •.,•- PIEDMONT DIVISION 3.:x 1'-3' 1 168 L4x4 x'," x 1'-0" CONNECTION ANGLE 123,.]'OD PIPE PILE STIFFENER I I 8 1," x 15" x 2'-9" SOLE PLATE EDBU DISTRICT INSTALL REBAR CADS PLATE ST A FILL WITH CONCRETE 1 I 20 '," x 7" x 2'-9" SOLE PLATE 1 •, OFfMI OF CHEF ENGrEER-BROpES A STRUCTURES ATLANTA W :;€AN R, I I ;e PREFORMED FABRIC sloe PAD PLATE PA STEEL BENT REPLACEMENT 1 DIA x 6'ASTM A325 BOLT. 1•CIA z 1B-ASTM A36 FULL , -3~ x z'-9~ x 3•" THICK BRIDGE EC 59.3 NEW BERN,NC A563 NUT d f436 MASHER xEAVYRHEX NUT ANCHOR WASHER 40 1" DIA x 6" ASTM A325 BOLT, A563 NUT Q F436 WASHER OVER TRENT RIVER CAP BEAM AND STRINGER ASSEMBLY 1" DIA x 18" ASTM A36 FULLY THREADED DGN JBO vn ate NN rvRNx0394 A 03695 MAEPOST EC-59 3 SCALE '�a' = 1' 16 ANCHOR ROD. HEAVY HEX NUT 8 WASHER DHK FAE BR0013916 DATE JULY 17,2015 SHEET No 3 OF 4 1 ORAWra HD EC-59 3 15 01 SCHEDULE OF REINFORCING STEEL FOR SCHEDULE OF REINFORCING STEEL DRAWHOUSE PILE CONCRETE ENCASEMENT FOR BENT CONCRETE ENCASEMENT ADDITION Q B p Q A ' ¢1'•j DIA y 1.j DIOi TED A ROLES - I a J TYP •1'SI „ ROLES N TYPE 1 TYPE 2 TYPE 1 TYPE 2 2 2-5 2 NO PC TYPE EST NO PC TYPE EST PCs SIZE LENGTH MARK NO A B WEIGHT PCs SIZE LENGTH MARK NO A B WEIGHT COPE WEB OF SOLE PLATE 1 SE BASE PLATE PA 32 #5 5'-3" 501 2 5'-3" 176 37 tt5 15'-33,i' 503 1 4'_1��j' 7'-3,4" 592 BRACE TO CLEAR PILE ¢t',i DIA 32 4 B'-3'�j' 502 1 t'-105's"1'-105,8" 277 6 42'-4" 504 1 17'-7" 7'-2" 265 ¢t'.NOOES HoLEs MATERIAL REOUIRED FOR 1 40'-814' 505 1 4'-1" 32'-634" 43 123"4" OD ^ DRAWHOUSE PILE ENCASEMENT 2 32'-63i' sob 2 32'-63;' 68 PIPE PILE 4„ 'z z-S'2 z 2•-s z CONCRETE. 5000 PSI 4 CU YO MATERIAL REQUIRED FOR BENT HP12x53 BRACE SOLE PLATE 1 SF 3�a' SHOCK PAD REINFORCING STEEL. ASTM A615 GRADE 60 453 LB CONCRETE ENCASEMENT ADDITION PILE TO BRACE CONNECTION DETAIL CONCRETE, 5000 PSI 16 CU YD REINFORCING STEEL. ASTM A615 GRADE 60 968 LB %JLt'li DIA ¢t'•i DIA SLOTTED ROLES HOLES 2 2-5 2 2 2-5'2 NOTES SOLE PLATE 2 SE SOLE PLATE 2 SF CONCRETE SHALL HAVE A MAXIMUM SLUMP m OF 4" AND A MINIMUM COMPRESSIVE 501 ' t Sot 10 o STRENGTH OF 5000 PSI AT 28 DAYS ALL SURFACE EDGES SHALL HAVE A 3,4" CHAMFER 4 CONCRETE COVER OVER REINFORCING STEEL SHALL BE 11,j' REINFORCING STEEL SHALL CONFORM TO a ASTM A615 GRADE 60 ° FABRICATION. BENDING. AND PLACEMENT tt8 BAR x 1'-4 OF REINFORCING STEEL SHALL BE IN ^ r, ACCORDANCE WITH CURRENT AREMA Sox 6 s z I B GUIDELINES FOR CONCRETE STRUCTURES AND FOUNDATIONS 123,q' 00 PIPE PILE m CONCRETE SHALL HAVE A WATER-CEMENT RAT10 OF 0.40. AMA%]MUM SLUMP OF PREFABRICATED REBAR 3". AND A MAXIMUM AGGREGATE SIZE CAGE SIX u6 BARS DRAWHOUSE PILE OF 3'4 WITH u3 TIES CONCRETE ENCASEMENT SECTION B-B — CUT 1" x t j' DEEP DIA SCALE 1' SCALE '.j t' NOTCH IN PILE AT CUTOFF GUY WIRE I I ------ _�L z I ' sos III 1 PLACE THREE 3" DIA SNAP-ON PLASTIC ^' so3 RINGS EVERY 4TH TIE ,� TO MAINTAIN 11,j' CLEARANCE 4R B 2-1.2 7 0 9 2 -Z 7 8 9 2°B 7 a 9 2-2 1 0 9 '-1.r 4.j 504 506 I I I BAR LAPIN I I I I I I I 0 I _— REBAR CAGE BENT CONRETE INSTALLATION DETAIL ENCASEMENT ADDITION SECTION D-D CAGE TO EXTEND 10' MIN AFE NO: F-02096 SCALE j--t' SCALE ',j-t' BELOW GROUND LINE STORE N0: B045 REV By DATE DESCRIPTCH MARK ALL TIES THIS END NORFOLK 10'-0 SOUTHERN x•_y,- e•-S z'-9'- INSIDE NO PC SIZE HORIZONTAL DIMS BOLT LENGTH PIEDMONT DIVISION SHOULDER PCS MARK ROUGH q D LEFT RIGHT FOR PRE EDBU DISTRICT - PLATED TIES 32 1 9" x 10" 1'-31,j' 8'-8''j' OFEEZ DE 04Ef ENG4EER-BROCES L STRUCTURES ATLANTA CA 9" x 10" t'-3"j' 8'-8',j' 13" 13"STD HOOK CONCRETE ENCASEMENT & MISC DETAILS A D BNL;VHULES BRIDGE EC-59.3 - NEW BERN,NC NOTE OVER TRENT RIVER TIE FRAMING OAK TIES TO MEET CURRENT NORFOLK SOUTHERN DcN JBO v&REc"t~om"A om% uEEPoST EC-59 3 DETAIL SPECIFICATIONS DATED MARCH 2005 CHR FEE BROO13916 DATE JULY 17,2015 SCALE '"i' = 1' SHEET Ho 4 OF 4 mAmHC No EC-59.3 15 01 ATTACHMENT C FIGURES 15R0114 ATTACHMENT D USFWS IPAC REPORT 15R0114 United States Department of the Interior SU`VIOR�' FISH AND WILDLIFE SERVICE t* Raleigh Ecological Services Field Office,. 551 PYLON DRIVE,SUITE F RALEIGH,NC 27606 PHONE: (919)856-4520 FAX: (919)856-4556 Consultation Code: 04EN2000-2016-SLI-0001 October 01, 2015 Event Code: 04EN2000-2016-E-00005 Project Name: Bridge E.0 59.3 Subject: List of threatened and endangered species that may occur in your proposed project location, and/or may be affected by your proposed project To Whom It May Concern: The species list generated pursuant to the information you provided identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service)under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. Section 7 of the Act requires that all federal agencies (or their designated non-federal representative), in consultation with the Service, insure that any action federally authorized, funded, or carried out by such agencies is not likely to jeopardize the continued existence of any federally-listed endangered or threatened species. A biological assessment or evaluation may be prepared to fulfill that requirement and in determining whether additional consultation with the Service is necessary. In addition to the federally-protected species list, information on the species' life histories and habitats and information on completing a biological assessment or evaluation and can be found on our web page at http://www.fws.gov/raleigh. Please check the web site often for updated information or changes If your project contains suitable habitat for any of the federally-listed species known to be present within the county where your project occurs, the proposed action has the potential to adversely affect those species. As such, we recommend that surveys be conducted to determine the species' presence or absence within the project area. The use of North Carolina Natural Heritage program data should not be substituted for actual field surveys. If you determine that the proposed action may affect (i.e., likely to adversely affect or not likely to adversely affect) a federally-protected species, you should notify this office with your determination, the results of your surveys, survey methodologies, and an analysis of the effects of the action on listed species, including consideration of direct, indirect, and cumulative effects, before conducting any activities that might affect the species. If you determine that the proposed action will have no effect (i.e., no beneficial or adverse,direct or indirect effect) on federally listed species, then you are not required to contact our office for concurrence (unless an Environmental Impact Statement is prepared). However, you should maintain a complete record of the assessment, including steps leading to your determination of effect, the qualified personnel conducting the assessment, habitat conditions, site photographs, and any other related articles. Please be aware that bald and golden eagles are protected under the Bald and Golden Eagle Protection Act (16 U.S.C. 668 et seq.), and projects affecting these species may require development of an eagle conservation plan (http://www.fws.gov/windenergy/eagle—guidance.html). Additionally, wind energy projects should follow the wind energy guidelines (http://www.fws.gov/windenergy[) for minimizing impacts to migratory birds and bats. Guidance for minimizing impacts to migratory birds for projects including communications towers (e.g., cellular, digital television, radio, and emergency broadcast) can be found at: http://www.fws.gov/migratorybirds/CurrentB irdlssues/Hazards/towers/towers.htm; http://www.towerkill.com; and http•//www fws gov/migratorybirds/CurrentBirdlssues/Hazards/towers/comtow.htmi. Not all Threatened and Endangered Species that occur in North Carolina are subject to section 7 consultation with the U.S Fish and Wildlife Service. Atlantic and shortnose sturgeon, sea turtles,when in the water, and certain marine mammals are under purview of the National Marine Fisheries Service. If your project occurs in marine, estuarine, or coastal river systems you should also contact the National Marine Fisheries Service, http://www.nmfs.noaa.gov/ We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Tracking Number in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. If you have any questions or comments, please contact John Ellis of this office at john_ellis@fws.gov. Attachment 2 United States Department of Interior +� Fish and Wildlife Service Project name: Bridge E.0 59.3 Official Species List Provided by: Raleigh Ecological Services Field Office POST OFFICE BOX 33726 RALEIGH,NC 27636 (919)856-4520 Consultation Code: 04EN2000-2016-SLI-0001 Event Code: 04EN2000-2016-E-00005 Project Type: TRANSPORTATION Project Name: Bridge E.0 59.3 Project Description: The purpose of the project is to replace 8 deteriorated sections of bridge EC- 59.3 to maintain reliable rail service. Five bridge sections south of the swing span and three bridge sections north of the swing span will be replaced within the alignment of the existing bridge. Please Note: The FWS office may have modified the Project Name and/or Project Description, so it may be different from what was submitted in your previous request. If the Consultation Code matches, the FWS considers this to be the same project. Contact the office in the 'Provided by' section of your previous Official Species list if you have any questions or concerns. http://ecos.i'ws.gov/ipac, 10/01/2015 12:33 PM 1 '° United States Department of Interior Fish and Wildlife Service Project name: Bridge E.0 59.3 Endangered Species Act Species List There are a total of 9 threatened or endangered species on your species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area.For example,certain fish may appear on the species list because a project could affect downstream species. Critical habitats listed under the Has Critical Habitat column may or may not lie within your project area. See the Critical habitats within your project area section further below for critical habitat that lies within your project. Please contact the designated FWS office if you have questions. Birds Status Has Critical Habitat Condition(s) Red Knot(Calidris canutus rufa) Threatened Red-Cockaded woodpecker(Picoides Endangered borealis) Population:Entire Fishes Atlantic sturgeon(Acipenser Endangered oxyrinchus oayrinchus) Population:Carolina DPS Shortnose sturgeon(Acipenser Endangered brevirostrum) Population:Entire Flowering Plants rough-leaved loosestrife(Lysimachia Endangered asperulaefolia) sensitive joint-vetch(Aeschynomene Threatened virginica) Mammals http://ecos.fws.gov/ipac, 10/01/2015 12:33 PM 3 United States Department of Interior +� Fish and Wildlife Service Project name: Bridge E.0 59.3 West Indian Manatee(Trichechus Endangered Final designated manatus) Population:Entire Reptiles American alligator(Alligator Similarity of mississippiensis) Appearance Population:Entire (Threatened) Leatherback sea turtle(Dermochelys Endangered Final designated coriacea) Population:Entire http://ecos.fws.gov/ipac, 10/01/2015 12:33 PM 4 United States Department of Interior .� Fish and Wildlife Service Project name: Bridge E.0 59.3 Critical habitats that lie within your project area There are no critical habitats within your project area. http://ecos.fws.gov/ipac, 10/01/2015 12:33 PM 5 47•_65. INDEX OF SHEETS SHEET SHEET TITLE NO EXISTING SWING SPAN I 1 EXISTING PROFILE 2 PROPOSED PLAN & PROFILE 3 STEEL BENT REPLACEMENT 4 CONCRETE ENCASEMENT & MISC DETAILS NORTH TO NEW BERN. NC SOUTH TO JAMES CITY. NC NOTES THE DESIGN LIVE LOAD IS COOPER'S - - -- -- - - -- -- - - - - - - - - EBO WITH DIESEL IMPACT DRAW PILES ARE TO BE DRIVEN TO 100 TON CAPACITY AND PROPOSED BENT CITY TENDERS EXISTING ARE TO BE VERIFIED BEFORE DRIVING PILE HOUSE AN ACCURATE LOG OF ALL DRIVEN PILE IS TO BE KEPT AND FURNISHED - - - - - - - - -- - - - - -- -- -- - - - - - - - - - -- - TO THE OFF[CE OF CHIEF ENGINEER - BRIDGES 8 STRUCTURES WORKMANSHIP SHALL BE IN ACCORDANCE WITH CURRENT AREMA - - - - - - - ---- - - - - - - ,. GUIDELINES FOR CONCRETE AND STEEL STRUCTURES AND FOUNDATIONS ALL STEEL PILE SURFACES BENEATH PROPOSED CONCRETE ENCASEMENTS SHALL BE CLEANED AND PAINTED USING INTERZONE 954 IN ACCORDANCE NORMAL WATER SURFACE WITH MANUFACTURER'S I I I I ; ElEV 0.5' +i- RECOMMENDATIONS I 'F- 'F I U Li EXISTING PROFILE NORTH APPROACH SCALE NZ' = 1' u u L 1 4 2015 ;���RE_"'PERAAI h-ING ) 4) AFE NO: F-02096 STORE NO: 8045 NORMAL ELEVROSSRFACE REV BY DATE DESCRIPTION I l r ^I I I NORFOLK WATE I _T - -I I SOUTHERN PIEDMONT DIVISION u u EDBU DISTRICT OFFICE OF CHIEF ENGINEER -BRIDGES 5 STRUCTURES ATLANTA.GA EXISTING PROFILE EXISTING PROFILE SOUTH APPROACH BRIDGE EC-59.3 - NEW BERN, NC SCALE N z' = 1' OVER TRENT RIVER DGN JBO VAL REC NUM(VRN):03694 6 03695 MILEPOST EC-59.3 CHX FILE BROO13916 DATE JULY 17.2015 SHEET NO 1 OF 4 1 DRAWING NO EC-59.3 15 Oi -- -- --- - - - - - - - - -- - - - -- DRAW TENDERS HOUSE 28'-I-' PIERS . . . . . . . .. .. . . - - - - - - -- - - I I 1 W16x57 -9'-2' - W16x57 - 10'-4' y WI6x57 - 10'-4' \ 1 I ' F E F I E: E I F1 I u u _ 2 -0 5-2 2';0 2'-0' '-0 6'-4- I � 9 -831Z 8, 9'--337 It 5 STIFFENER .� PLATE I EXISTIN—TIII NORMAL WATER I EXISTING SURFACE I I I I I I i I ELEV 0.5' +/- I I^ l F ^I I 1 11 I 1 SEE BENT CONCRETE ENCASEMENT ADDITION DETAIL I I I I PROPOSED PROFILE NORTH APPROACH SCALE ',2' = 1' 47'-6S,J' 1 1 1 1'-6' 12'-231' 12'-2314' 11'-7',j' PIERS 1' DIA x 6' ASTM A325 BOLTS NEW TOP OF STEEL ELEVATION WITH 5563 NUTS d F436 MASHERS TO MATCH EXISTING TOP OF STEEL QQ 3�i STIFFENE FOR NEW TIE DECK ALATE ST I ——— II I W16x5T - 12'-2' W16x57 - 12'-2' W16x5T - 12'-2' W16x57 - 12'-2' I — 1 u u I F E F NORMASURFACE E F E E F ELEV 0.5' +/- 2'- - e -z 21-0 2'-0' V-2' 2'-1' 2'-0 8-2 z -o 2'-0' 8'-2' z - I A F E NO: F-02096 1 1 -2 B 11 -6 8 11 -6'4 EXISTING I 11 IEXISTINGI I I STORE �NO: B045 I 1 I I I I I Z REV By DATE DESCRIPTION !�• t_ NORFOLK SOUTHERN I I 1 I U EDB DISTRICT -_I PIEDMONT DIVISION SEE BENT CONCRETE ENCASEMENT ADDITION \ \ , \ , \ , \ , OFFICE OF CHIEF ENGINEER -BRIDGES 1.STRUCTURES ATLANTA GA DE TA I I EXISTING PROFILE BRIDGE EC-59.3 - NEW BERN, NC PROPOSED PROFILE SOUTH APPROACH OVER TRENT RIVER SCALE ' z' = 1' UGN JBO VA REC NUM(VRN)•03694 6 03695 MLEPOST EC-59.3 CHIC FILE BR0013916 DATE JULY 17,2015 SHEET NO 2 OF 4 1 DRAWING NO EC-59.3 15 01 FABRICATED STEEL REQUIREMENTS 21­31'{x3',2"x3R" WORKMANSHIP SHALL BE IN ACCORDANCE WITH CURRENT AREMA GUIDELINES FOR STEEL STRUCTURES THE FABRICATOR SHALL BE CERTIFIED STj,FFENF3R"PLATE ST — — UNDER THE AISC QUALITY CERTIFICATION DRAW 3 j x , x 1'-3" PROGRAM. CATEGORY I ALL STRUCTURAL STEEL MEMBERS AND TENDERS TYP ALL COMPONENTS SHALL CONFORM TO ASTM ANGLE To A992 OR A709 GRADE 50 AS APPLICABLE WEB CONN. TRACK d BRIDGE HOUSE k k _ THE W16x57 BEAMS ARE FRACTURE W16x57 STRINGERS 1'-6°1'-9" 1'-9'1'-6° CRITICAL MEMBERS (FCM) AND SHALL ¢ MEET THE IMPACT TEST REQUIREMENTS AS " SET FORTH IN AREMA CHAPTER 15, W12x35 DIAPHRAM I I SECTION 1.14: NOTCH TOUGHNESS AND BEAM To STIFFENER TESTING REQUIREMENTS SHALL BE BASED SOLE PLATE PLATE ST ON A MINIMUM SERVICE TEMPERATURE OF SECTION C-C -30 DEGREES FAHRENHEIT (ZONE 2) STIFFENER 3'." x 1 LATE SCALE ''z' = 1 HOLES S NOTEDAOTHERWISE; DIAMETER EXCEPT STIFFENER PLATE BA tt 1 -5 1 -5 3 -6 1 -5 t'-5 tt , t1 -o SHALL BE DRILLED FULL-SIZE OR I / SUBDR[LLED AND REAMED 1 2''"2''" FASTENERS SHALL BE 1" DIAMETER ASTM 12f I I 11' A325 BOLTS WITH A563 NUTS AND ILL I F436 WASHERS: BOLTS SHALL BE L3',x3'•jxyti TIGHTENED USING THE TURN-OF-NUT / METHOD TO OBTAIN A MINIMUM TENSION - - - - - I I CLEAN d PAINT ALL ANCHOR BOLTS SHALL BE 1" DIAMETER EXPOSED STEEL SURFACES _ _ - F436 WASHEROLTS W[TH A563 NUTS AND USING INTERZONE 954 , ALL WELDS AND WELDING PROCEDURES NEW 123'; HP12x53 SHALL MEET THE REQUIREMENTS OF THE OD PIPE PILE BRACING AWS BRIDGE WELDING CODE D1.5 (SEE PILE TO BRACE CONN. 2 -0 ONLY THE SUBMERGED ARC WELDING (SAW) DETAILI / / " PROCESS OR SHIELDED METAL ARC SEE DRAWHOUSE PILE WELDING (SMAW) PROCESS MAY BE USED. MUD LINE I �I I I I I CONCRETE ENCASEMENT DIAPHRAM CONNECTIONS AND WELDERS SHALL BE AWS-CERTIFIED ELEV -10.0' +/- I DETAIL SCALE '•{ = 1' IN ALL WELDING POSITIONS ALL FABRICATED STEEL SHALL BE SHOP-PAINTED IN ACCORDANCE WITH CURRENT NORFOLK SOUTHERN LONGITUDINAL VIEW SPECIFICATIONS USING AN APPROVED INORGANIC Z[NC-ACRYL[C SYSTEM WITH PROPOSED ELEVATION OF BENTS BLACK FINISH SCALE ',.7 ALL WELDS AND WELDING PROCEDURES SHALL MEET THE REQUIREMENTS OF THE AWS BRIDGE WELDING CODE D1.5 ELECTRODES FOR SHIELDED METAL ARC WELDING SHALL MEET THE REQUIREMENTS OF AWS A5.1 AND SHALL BE OF THE LOW HYDROGEN CLASSIFICATION k BASE 5'_0- BEESHIPPEDAF FULLY DASSEMBLED. AND LL LATE PA SOLE PLATES AND LOOSE STIFFENER PLATES SHALL BE SHIPPED ON PALLETS IHtBf SE PLA ES S d TOP FLANGES MATERIAL REQUIRED 1"-9'z 1 -2'z 1 -2'x 2' 1 -2'z I -2 OTY ITEM 1234' OD x 3,B' WALL THICKNESS x 60' PIPE CAP BEAM PLAN 30 PILE. ASTM A252 GRADE 2. 1.5 TONS EA 45 TONS SCALE 14' = 1' 20 APF P13006 CONICAL POINT FOR 123," PILE 20 APF S-20000 SPLICER RING FOR 123" PILE 24 20' REBAR CAGE FOR 123,1(' OD PILE 200 LB EA PIPE PILE CONCRETE. 5000 PSI 36 CU.YD. AFE NO: F-02096 2'-0" 2'-0" 6'-4" 2 -D" gIAPHRAM HP12x53 BRACING. ASTM A572 GRADE 50 100 LF STORE NO: 8045 INTERZONE 954 18 GAL 5 W14x159 x 11'-0" CAP BEAM SEE DIAPHRAM tt f 60 STIFFENER PLATE BA: 7" x 4' x 1'- CONNECTION W16x57 STRINGER f + I 4 W16x57 x 9'-2" STRINGER. 523 LB EA 2090 LB 3 DETAIL l 8 W16x57 x 10'-4" STRINGER. 589 LB EA 4710 LB REv BY DATE DESCRIPTION 16 W16x57 x 12'-2" STRINGER. 694 LB EA 11096 LB >< 3'i SHOCK PAD �= SOLE PLATE 1 �= SOLE PLATE 2 ,, 3 3�.. NORFOLK ° BASE PLATE PA I PAD SHOCK 112 STIFFENER PLATE 5T: 3 " x x 1'-3" SOUTHERN a W14x159 z z ''{ BASE PLATE PA a 11'-0.'CAP I� �I 2811'-5" W12x35 DIAPHRAMS, ASTM A36 STIFFENER PLATE BA I 14 3'-5" W12x35 DIAPHRAMS. ASTM A36 PIEDMONT DIVISION 7'x'o x 1,-5j, ,, I 168 L4x4xl " x l'-0" CONNECTION ANGLE 123'° OD PIPE PILE xSTIFFENER I I 8 Imo" X 15" x 2'-9" SOLE PLATE EDBU DISTRICT INS�ALL REBAR CAGE PLATE ST d FILL WITH CONCRETE I I 20 I�" x 7" x 2'-9" SOLE PLATE OFFICE OF CHIEF ENGINEER -BRIDGES 6 STRUCTURES ATLANTA,GA 1" CHAI6ER 18 I�" x 15" x 2'-9" BASE PLATE PA AT CORNERS I 18 PREFORMED FABRIC SHOCK PAD STEEL BENT REPLACEMENT ,- DIA x 6" ASTM A325 BOLT. 1" DIA x 18' ASTM A36 FULLY 1'-3" x 2'-9" x 3," THICK BRIDGE EC-59.3 - NEW BERN, NC 1563 NUT d F436 WASHER HEAVY RHEX NUT HdRWASHER 40 1" DIA x 6" ASTM A325 BOLT, A563 NUT 8 F436 WASHER OVER TRENT RIVER CAP BEAM AND STRINGER ASSEMBLY 1" DIA x 18" ASTM A36 FULLY THREADED DON JBO VAL REC Nw CVRN):03694 6 03695 MILEPOST EC-59.3 SCALE I'4' = 1' 16 ANCHOR ROD. HEAVY HEX NUT 8 WASHER C,a< IRLE BR0013916 JDATE JULY 17,2015 SHEET NO 3 OF 4 DRAWING NO EC-59.3 15 01 SCHEDULE OF REINFORCING STEEL FOR SCHEDULE OF REINFORCING STEEL DRAWHOUSE PILE CONCRETE ENCASEMENT FOR BENT CONCRETE ENCASEMENT ADDITION B a A QI I A ¢ t'•e DI - ti U aa I DIA H0LE5 B x 2"tSLOTTED r ' � TYPE 1 TYPE 2 TYPE 1 TYPE 2 I,4' TYP HOLES NO PC TYPE EST NO PC TYPE EST PCS SIZE LENGTH MARK NO A B WEIGHT PCS SIZE LENGTH MARK NO A B WEIGHT COPE WEB OF SOLE PLATE 1 SE BASE PLATE PA BRACE TO 32 u5 5'-3" 501 2 5 -3" 176 37 u5 15'-33.4' 503 1 4'-11.2' 7'-3.4' 592 CLEAR P ILE ¢ 1'•{ DIA � 32 8'-31.2' 502 1 1'-105.8' 1'-1058' 277 6 42'-4" 504 1 17'-7" 7'-2" 265 ¢ 1''6 DIA HOLES HOLES MATERIAL REOU I RED FOR 1 40'-83,4' 505 1 4'-1" 32'-63.4' 43 123.4' OD - DRAWHOUSE PILE ENCASEMENT z 32"-63'4"" 506 z 32'-63'4' 68 PIPE PILE 4 r z z -s z ' z z -s z M CONCRETE. 5000 PS[ 4 CU YD MATERIAL REQUIRED FOR BENT HP12x53 BRACE SOLE PLATE 1 SF 3/4" SHOCK PAD REINFORCING STEEL. ASTM A615 GRADE 60 453 LB CONCRETE ENCASEMENT ADDITION PILE TO BRACE CONNECTION DETAIL CONCRETE. 5000 PSI 16 CU YD REINFORCING STEEL. ASTM A615 GRADE 60 968 LB I 1'•B DIA ¢ 1'•e DI x 2" SLOTTED HOLES HOLES n 2 -5"2 NOTES SOLE PLATE 2 SE SOLE PLATE 2 SF CONCRETE SHALL HAVE A MAXIMUM SLUMP m OF 4" AND A MINIMUM COMPRESSIVE 501 t °t 501 to 0 STRENGTH OF 5000 PSI AT 28 DAYS ALL SURFACE EDGES SHALL HAVE A 3,4' o. o. CHAMFER CONCRETE COVER OVER REINFORCING _ I STEEL SHALL BE 11'2" REINFORCING STEEL SHALL CONFORM TO a a I ASTM A615 GRADE 60 FABRICATION. BENDING, AND PLACEMENT #8 BAR x 1'-4 OF REINFORCING STEEL SHALL BE IN ACCORDANCE WITH CURRENT AREMA 5oz 6 502 1 6 GUIDELINES FOR CONCRETE STRUCTURES AND FOUNDATIONS 123.4' OD PIPE PILE m CONCRETE SHALL HAVE A WATER-CEMENT RATIO OF 0.40. A MAXIMUM SLUMP OF PREFABRICATED REBAR 3,411 3". AND A MAXIMUM AGGREGATE SIZE CAGE SIX u6 BARS DRAWHOUSE PILE OF WITH ss3 TIES CONCRETE ENCASEMENT SECTION B-B SCALE '•6" = 1' SCALE '•e = t• CUT 1" x 11.2' DEEP 3 e' D 1 A NOTCH IN PILE AT CUTOFF GUY WIRE I I 3'-6° 3'-6° Z I I 505 I PLACE THREE 3" DIAL I 1 I I 1 I SNAP-ON PLASTIC tiw 503 RINGS EVERY 4TH TIE e TO MAINTAN N 11.2' CLEARANCE 4•z 8 2 -t•z 7 a 9' W2 - 7 a 9° 2 0 a- 7 a 9 2'-2° 7 0 9 '1'z 4'z" 504 506 I I I I BAR6LAPIN I I 1 I I I 1 I I—j 1_1 REBAR CAGE BENT CONRETE INSTALLATION DETAIL ENCASEMENT ADDITION SECTION D-D CAGE To EXTEND 10' MIN AFE NO: F-02096 SCALE '•o = t' SCALE '•6° = 1' BELOW GROUND LINE STORE N0: 8045 1 1 REV By DATE OESCRIPTION MARK ALL T[ES THIS END _ NORFOLK 1 o'-o 3W SOUTHERN 2 -9'•" 4'-5"• ' z'-9'•"' INSIDE NO PC SIZE HORIZONTAL DIMS BOLT LENGTH SHOULDER PCS MARK ROUGH PIEDMONT DIVISION FOR PRE A D LEFT RIGHT EDBU DISTRICT o+ o+ PLATED TIES 32 1 9" x 10" 1'-31.2' 8'-81'2' OFFICE OF CHIEF ENGINEER -BRIDGES 6 STRUCTURES ATLANTA,CA 1'2' 1'2 3z ,V 9" x ,o" 1'-31.2' 8'-a1,2' ,3" ,3" CONCRETE ENCASEMENT & MISC DETAILS STD HOOK A D BOLTVHOLES BRIDGE EC-59.3 - NEW BERN, NC NOTE OVER TRENT RIVER T I E FRAMING OAK TIES TO MEET CURRENT NORFOLK SOUTHERN ocN JBO VAL REC NW(VRN)03694 6 03695 MILEPOST EC 59.3 DETAIL SPECIFICATIONS DATED MARCH 2005 SCALE A = 1' CHx FILE BROO13916 DATE JULY 17,2015 SHEET NO 4 OF 4 DRAWING NO EC-59.3 15 01