STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTAT'ION
PAT MCCRORY
GOVERNOR
October l4, 2015
U. S. Army Corps of Engineers
Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
ATTN: Mr. Steven Kichefski
NCDOT Coordinator
NICHOLASJ.TENNYSON
SECRETARY
Subject: Application for Section 404 Nationwide Permits 13 & 33 and Section 401
Water Quality Certification for the proposed replacement of Bridge No. 39 over
Mitchell River on SR 1328 (Haystack Road) in Surry County; Federal Aid Project
No. BRZ-1328(6); WBS 42330.1.1; Division 11; TIP No. B-5173.
Dear Mr. Kichefski:
The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 39
over Mitchell River on SR 1328 (a 78-foot bridge) with a 100-foot box beam b�•idge. The bridge
will be located on new alignment, approximately 34 feet downstream, and will span Mitchell
River. The project will utilize the existing bridge to maintain traffic while the new bridge is under
construction.
There will be a total of 68 linear feet (lfl of pe►•manent stream impacts from the placement of bank
stabilization, along with 32 lf of temporary impacts associated with the bank stabilization.
Please see enclosed copies of the Pre-Construction Notification (PCN), USFWS Section 7
concurrence letter, stormwater management plan, permit drawings and design plans for the above-
i•eferenced project. The Categorical Exclusion (CE) was completed in December 2014 and
distributed shortly thereafter. Additional copies are available upon request.
This project calls for a letting date of February 16, 2016 and a review date of December 29, 2015;
however, the let date may advance as additional funding becomes available.
MAILING ADDRESS: TE�EPr+oNE: 919-707-6100 LOCATION:
NC DEPARTMENT OF TRANSPORTATION FAX: 919-212-5785 1020 BIRCH RIDGE DRIVE
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS �.yEBSITE: WIMN.NCDOT.GOV RALEIGH NC 2761 O
1598 MAIL SERVICE CENTER
Rn�eicH NC 27699-1598
A copy of this permit application and its distribution list will be posted on the NCDOT Website at:
http://connect.ncdot.gov/resources/Environmental. If you have any questions or need additional
information, please call Bill Barrett at (919) 707-6103.
Sincerely,
- � ....�__� _ .
��i�� Richard W. Hancock, P.E., Manager
Project Development and Environmental Analysis Unit
cc:
NCDOT Permit Application Standard Distribution List
�oF,��,rFRQ Office Use Only:
� � o c Corps action ID no.
� y
i ,, , � � � DWQ project no.
° �` Form Version 1.4 January 2009
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
� Yes ❑ No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Replacement of bridge number 39 on SR 1328 (Haystack Rd.) over Mitchell River.
2b. County: Surry
2c. Nearest municipality / town: Devotion, NC (unincorporated community); Mount Airy, NC
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state g_5173
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if not applicable
applicable):
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6103
3g. Fax no.: (919) 212-5785
3h. Email address: wabarrett@ncdot.gov
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1 b. Site coordinates (in decimal degrees): Latitude: 36.434040 Longitude: - 80.916492
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 0.4 acre
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Mitchell River
proposed project:
2b. Water Quality Classification of nearest receiving water: B;Tr,ORW
2c. River basin: Yadkin-Pee Dee
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Rural area; the development in the area is primarily rural agriculture.
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
285 within project ROW.
3d. Explain the purpose of the proposed project:
To replace a structurally deficient and functionally obsolete bridge.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing a 78-foot bridge with a 100-foot, single-span bridge on new alignment, approximately 34
feet downstream, utillizing the existing structure to maintain traffic while the new bridge is constructed. Standard road
building equipment, such as trucks, dozers, and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact
number — Type of impact Type of wetland Forested Type of jurisdiction Area of impact
Permanent (P) or (if known) (acres)
Temporar T
Site 1❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 2❑ P � T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 3❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 4❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 5❑ P � T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 6❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts X Permanent
X Temporary
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average Impact length
number - (PER) or jurisdiction stream (linear feet)
Permanent (P) or intermitte (Corps - width
Temporary (T) nt (INT)? 404, 10 (feet)
DWQ —
non-404,
other)
Site 1� P❑ T bank Mitchell River � PER � Corps 30 68
stabilization ❑ INT � DWQ
Site 1❑ P� T Bank Mitchell River � PER � Corps 30 32
stabilization ❑ INT � DWQ
Site 3❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 4❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 5❑ P 0 T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 6❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 68 Perm
32 Temp
3i. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of
impact number — waterbody Type of impact Waterbody Area of impact (acres)
Permanent (P) or (if applicable) type
Tempora T
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts X Permanent
X Temporary
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or (acres)
number purpose of pond Flo
Flooded Filled Excavated ode Filled Excavated Flooded
d
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If an impacts require miti ation, then you MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason for impact Buffer Zone 1 impact Zone 2 impact
Permanent (P) or Stream name mitigation (square feet) (square feet)
Tem ora T re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed bridge is 22 feet longer than the existing bridge; the proposed bridge will be at approximately the same
grade as the existing structure; the existing bridge will be used to maintain traffic while the new bridge is constructed; 3:1
fill slopes where practicable.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Best Management Practices via the promotion of sheet flow and infiltration with grassed shoulders; Storm drain in SE
quadrant outlets to a riprap pad; the ditch in the SW quadrant outlets to riprap embankment to prevent erosion; and cross
pipe outlets to pre-formed scour hole (PSH). Additionally, erosion and sedimentation control will adhere to the Design
Standards in Sensitive Watersheds.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
❑ Yes � No
If no, explain: NCDOT does not propose mitigation for the 68
If of permanent bank stabilization impact at Site 1, as it does
2a. Does the project require Compensatory Mitigation for not require fill in the stream bed and therefore, under Section
impacts to Waters of the U.S. or Waters of the State? 404 of the Clean Water Act, does not constitute Loss of
Waters of the U.S. and is not subject to compensatory
mitigation. Furthermore, the proposed bank stabilization is
necessary to prevent erosion and sedimentation by
preventing bank destabilization and thereby minimizing
im acts to the environment.
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? ❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑ No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If not, explain why.
❑ Yes ❑ No
Comments: If required from 1 a, see attached buffer permit drawings.
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? not applicable
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
4a. Which of the following state-implemented stormwater management programs apply ❑ HQW
(check all that apply): ❑ ORW
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No n/a
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No n/a
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No n/a
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State � Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) � Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes
additional development, which could impact nearby downstream water quality? � No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
� Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
USFWS and NHP websites, and on-site surveys.
Of the three species listed for Surry County, there is habitat for Schweinitz's sunflower. The most recent survey was
conducted October 28, 2013; and no individuals of this species were identified. Additionally, there is no NHP listing of
this species within one mile of the project.
Concurrence from USFWS for NLEB was received on September 17, 2015 (letter attached).
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA Documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA Maps
��� � Richard W. Hancock, P.E. .-__ _ �_�, ,-- �� ��`''� f � : � � s• �
�`} Applicant/Agent's Printed Name ��— (� � �_--- - --. _ Date ��
Applicant/AgenYs Signature
(AgenYs signature is valid only if an authorization letter from the applicant
is rovided.
�
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Asheville Field Office
160 Zillicoa Street
Asl�eville, North Carolina 28801
September 17, 2015
Mr. Richard W. Hancock
North Carolina Department of Transportation
Project Development and Environmental Analysis Unit
1598 Mail Service Center
Raleigh, NC 27699-1598
Subject: Endangered Species Concurrence for the Proposed Replacement of Bridge No. 39 on
SR 1328 over the Mitchell River, Surry County, North Carolina. TIP B-5173, WBS No.
42330.1.1.
Dear Richard:
We have reviewed your concurrence request and supporting documentation regarding impacts to
the federally listed threatened northern long-eared bat (NLEB) (Myotis septentrionalis) for the
subject project. We provide the following comments in accordance with the provisions of
section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act).
The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No 39
over the Mitchell River. Some habitat for the NLEB exists in the vicinity of the project and has
been evaluated for potential impacts from project implementation. According to the information
provided, a search for mines and caves was conducted in the project footprint and within a
quarter mile of the project and none were found. The existing bridge was checked for bat use
and none was observed. Potential summer roosting habitat clearing is estimated at 0.2 acres.
Based on the absence of wintering habitat, no evidence of bat use on the existing structure, and
NCDOT's commitment to restrict tree cutting to the time from August 15 to April 15 (of any
year) we agree that implementation of this project is "not likely to adversely affect" NLEB in the
project area. In view of this, we believe the requirements under Section 7(c) of the Act are
fulfilled. However, obligations under Section 7 of the Act must be reconsidered i£ (1) new
information reveals impacts of this identified action that may affect listed species or critical
habitat in a manner not previously considered, (2) this action is subseguently modified in a
manner that was not considered in this review, or (3) a new species is listed or critical habitat is
determined that may be affected by the identified action.
If you have questions about these comments, please contact Ms. Marella Buncick of our staff at
828/258-3939, Ext. 237. In any future correspondence concerning this project, please reference
our Log No. 4-2-15-403.
Sincerely,
- - o�^iginal signed - -
Janet Mizzi
Field Supervisor
k li,t;h7� E1�' North Carolina Department of Transportation �
:5r1[ltltlbViiTf C M
,.._, Highway Stormwater Program �j
STORMWATER MANAGEMENT PLAN
(Version 2.01; Released December 2014) FOR NCDOT PROJECTS
WBS Element: 42330.1.1 TIP No.: B-5173 County(ies): Surry Page 1 of 2
General Project Information
WBS Element: 42330.1.1 TIP Number: B-5173 Project T pe: Bridge Replacement Date: 5/27/2015
NCDOT Contact: Galen Cail, PE Contractor / Designer. Galen Cail, PE/Craig Lee, PE
Address: 1020 Birch Ridge Dr. Address: 1020 Birch Ridge Dr.
Raleigh, N.C. 27610 Raleigh, N.C. 27610
Phone: 919.707.6711 Phone: 919.707.6711 /919.707.6708
Email: cail ncdot. ov Email: cail ncdot. ov/c'lee ncdot. ov
CitylTown: Devotion, NC Count ies : Sur
River Basin s: Yadkin-Pee Dee CAMA County? No
Wetlands within Project Limits? No
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.16 Surrounding Land Use: Fields
Proposed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 0.4 ac. 0.3 ac.
Typical Cross Section Description: 9' Travel Lanes, 4' Grass Shoulders. 2:1-4:1 Side Slopes 9' Travel Lanes, 2' Grassed Shoulders, 2:1-4:1 Side Slopes
Annual Avg Daily Traffic (veh/hr/day): Design/Future: 254 Year: 2036 Existin : 174 Year: 2016
General Project Narrative: The project consists of replacing Bridge# 39 on SR 1328 (Haystack Road) over Mitchell River. The approach work will consist of providing grass shoulders and guardrail.Bridge
(Description of Minimization of Water #39 existing single span structure (77.5' total length) will be replaced with 1@ 100' - 39" Box Beam.
Quality Impacts)
Best Mgmt. Practices:
-Promotion of sheet flow and infiltration with grassed shoulders.
-Storm Drain in SE quad outlets to rip rap pad.
-Ditch in SW quad outlets to rip rap on embankment to prevent erosion.
-Cross pipe outlets to preformed scour hole
Waterbody Information
Surface Water Body (1): Mitchell River NCDWR Stream Index No.: 12-62-(1)
NCDWR Surface Water Classification for Water Body Primary Classification: Class B
Supplemental Classification: (ORW) Trout Waters (Tr)
Other Stream Classification:
Impairments: None
Threatened/Endangered Species? No Comments:
NRTR Stream ID: Mitchell River Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
1 31�;31�t'�lw° North Carolina Department of Transportation
�'���.117��"���� Highway Stormwater Program
'�';,I
STORMWATER MANAGEMENT PLAN
(Version 2.01; Released December 2014) FOR NCDOT PROJECTS
WBS Element: 42330.1.1 TIP No.: B-5173 Count ies : Surry Pa e 2 of 2
Preformed Scour Holes and Energy Dissipators
Drainage Pipe/Structure BMP
Sheet Station (Road Projects) or Surface Energy Dissipator Area Conveyance Dimensions Q10 V10 Associated w/
No. Coordinates (Non-Road Projects) Water Bod Type Riprap T pe ac Structure (in) (cfs) (fps) Buffer Rules?
4 -L-STA.19+35RT (1)Mitchell pSH Class'B' 9.4 Pipe 30 17.0 1.7 N/A
River
Additional Comments
' Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for
Culverts and Channels (July 2006), as applicable, for design guidance and criteria.
�
s
�
�
�
�
�
�
�
�
�
�
�
�
�
z
C7
�
��
��
� �,
��
�u�
��
�
�� z
��
�W
tA t�
��
�»�
��
��
[» i»
�
�
�
�
.�
�
V
�,�
O
�C
�
�
�
�
�
�
V
� �
�
V
�
�
O
V
/
See Sheet 9-A For Index of Sheets
See Sheet 9-E7 For Conventional Symbols
�See Sheet 9-C i= or Survey Control Sheets
Lens Knob Mtn. �,
Elev. 2188
>� END PROJE T SR
V`�`�� � � �,� Bs
�,�� �
��er
DEVOTION
BEGIN PROJECT s�,
��, S�
o� ,
����� �� ����� ��1������
�������� �� ��������
SURRY COUI�TY
LOCATION: BRIDGE 11to. 39 0111 SR 1328 (HAYSTACK RD) OVER
MITCHELL RIVER
TYPE OF WORK: GRADI11tG, DRAI11lAGE, PAVIIVG, STRUCTURE
�,� Mill SR 133�
� � 0�
1325 '��j 5���
� �rP �322 � I �
�wol SR ,� Pi o„ �/�/ETLAN D AN D�� U RFAC E WATE R
1 V�0 UNTAIN PARK y I$
� �,A � � �
�315 � �R ���s � ZEPHYR � �
T�ICI11tITY MAP �� '
,�
/-� I I � I� -L ES D BR+DGE
_ , � � � � � �_ - -
� _ ' � �
� �
_� �-
�
/
. �R� �,� A d�
� ,,��' �T��K� T
" r 1
� � u�Y��
-
; , , ,
�� —
J _ � - ;i," �— �
IIV�P�CTS
,�
i �
i �
��,
,'o'" �
o�
1 z�
i�
i��
i �
� o�
i �'�
,�, /��
�'
J°
,,--_ , -, =, � , ��.
BEGI11t T.I.P. PROJECT B-5173 � � � � � � �� � �
—L— STA.11 + 94.53 �
� ��
i ���
/ ��� i
/ � � �' �
� � �
/ � � �
�
I i� �
� , �\
� �pNi� \
� /ip�J�i�`�\� �\�
� � .�0� � �
������ �\ �
� ��
/ ��
/
BEGIN BRIDGE
-L- STA.16 + 70.88
PERMIT
�� �
� \ .
� ��� �
\� \ ����
\ � �
� � ��,�; � � � END T.I.P. PROJECT 8-5173
' ���'<< ��� _ � ��o —L— STA. 20 + 25. 00
� ��� � � �F �
������
� � \ � �A
THIS IS NOT A CONTROL OF ACCESS PROJECT. �� � �\\
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES, BUT LIES WITHIN ' � \� \
THE BOUNDARIES OF DEVOTION RURAL HISTORIC DISTRICT (SR 859). \ �
** DESIGN EXCEPTION REQUIRED FOR DESIGN SPEED OF 25 MPH. \ , �lE��b,II�IN.�1I8� ]�]LAN�
DO NOT [1SE FOR CONSTRUCTION /
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
�
� HYDRAULICS ENGINEER
GRAPHIC SCALES DESIG11l DATA PROJECT LENGTH PrePo�ed in tne office ot:
ADT 2016 = 174 DIVISI0111 OF HIGHWAYS
50 25 0 50 l0o ADT 2036 = 254 LENGTH ROADWAY T.I.P. PROJECT B-5173 = 0.138 MI i000 s,.�n Ridge nr., aate�gh xc, z�6io ���� ��w����
� DHV = �O % � 2012 STANDARD SPECIF7CATIONS �a�° "�e
PLANS � �
D = 6O % I P.E. � <
LENGTH STRUCTURE T.I.P. PROJECT B-5173 = 0.019 MI s,cxAronE: �� �
50 25 0 50 loo T— 5 ��a * RIGHT OF WAY DATE: JASON MOORE, PE °
** V= 55 MPH FEBRUARY 27, 2015 rnorECZ sxc�,vEEa ROADWAY DESIGN ���� ����
PROFILE (HORIZONTAL) * TTST =2% DUAL 3% ENGINEER �� p���as�
TOTAL LENGTH OF T.I.P. PROJECT B-5173 = 0.157 MI LETTING DATE: NYA K. BOAYUE, PE
�O S O �O ?O FUNC CLASS = RURAL LOCAL PROJECT DESIGN ENGINEER
FEBRURAY 16, 2016
� PROFILE (VERTICAL) SUB REGIONAL TIER `'E
S/GNATURE:
olK
�
�
�
�
EN
�
�
�
�
�
�
�j
z
SKETCH SHOWING BRIDGE /ROADWAY RELATIONSHIP
APPROACI-I SLAB APPROACH SLAB
L- STA, 16+59088 -L- STA� R+84e13
� �
� TYPE-III N TYPE-III �
�
� BEG'N BRIDGE
-_- S f A� 16+70,88
� �
\+ �
\+ s�
�+ � _
� �
� �� � � �,s�
�� � � � � �
I GRASS
\
� y� +
I�\\ \}. GRASS
� � �V �+
� ���+
� a a �—� � \k,
I /C� � fJ�\ �\
I / � tt � \�E
II /� � GftASS �
IGg
I I �pN� /
� / /VY
I C7 /
�` J�/ �
�
� / �
� /
� ..•.
/ �( ��v TIE TO
/�� �"� E%ISTING DITCH
� M`�
\ p� �
� � �� � � �
� / /—��cqq� ���`;A
�� � /sR �%� � � 1
� � �p, � � ��
� � � � �STP�K� � \
�� � j/ �� �
� lo j A \
� j/ • \ �
/ � ��
��A
� \
\ \
� �
� �
� �
� �
� �`4Y
\
�DENOTES IMPARS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
;� n
�
�? TYPE—I I I
N
END BRIDG�
—L— STA, 17+73,13
—�— � S�O. 17f8%E
S ITE 1
� 15' � _
/ 15 / /
�-
SEE DETAIL A
100' 0' 100'
■ � ■ ■ ■
�_..�� .� � � .
GRAPI-�tL SCALE
�
�l \
�
�
y�
�
I
I
,y
GRASS �i il
/.. ..
/�S �
� � I
/
�� �
�.
� DRAI � �
� _ � F � ,� �
� AD - DRA�� � � i
� j�.�
`x
� �� � �� ,
� «.
�� a �
� E
E
SEE DETAIL B
CLA55 II RIP RAP
to Appron. Elev. - 1351.1'
STRUCTURE PAY /TEM -
DETAIL G
RIP RAP AT EMBANKMENT
, �o„o =�e�e,
s.
Dit<h — 1.5'
Grode Georextile J�
o'
Type o! Liner� Closs I Rip-ROp � IS Tons
Geotex'ile 35 s
FROM STA.16+65 TO STA.17+Od RT
�
�
�
�
�
canss
�TEMPORARY SURFACE
WATER IMPACTS
�i� r—��� SEE DETAIL A
/ �` k \
RAI\
�— �\ \
—_� .\G� - (c
���� � _
�� �� ,
-\ — �
E F
�, TEMPO RY SURFAC�EE
��, WATER IMPACTS DETAIL O�,
I R4P R
9etil F \ PSH �
� P �
�� �
"� ���\ �
� � �oRN F�E�o
��S
CL B RIP RAP -1 TON \ \
Geotexfile -5 SY ���
15" Ali. Pipe w/El6ows \ \
�
\
coRN Fie�o �
Pipe or �i�ch
owiei
L
Sq�ore Preloi
Scour Hole (F
^R'ip Rap in bosin
shawn For <lori
�
���
�P�
�
i
i� � o �
�j' D�P
i �0/s"�
/�
k ��
� � �����/
I � /�
x /
� ��
_�
�io , ,�
^\"�i �
�
� �1
' � .
� � .
/ / .
/ /I .
,�
� `l`s�
` \\
E �'��_ A
u� �,c
��. �
\\.
;r\
PREFORMED SCOUR HOLE
'NOT TO SCALE
PLAN VIEW
RM' SHEET NO.
DWAY DESIGN HYDRAULIC
ENGINEER ENGINEER
PERMIT DRAWING
SHEET 2 OF 6
INSTALL LEVEL AND FLUSH
WITH NATURAI GROUND
J
SECTION A-A
�� PIPE �d = 30")
S�� F D
PSRM �
INFIOW NAT RAL
_ ���I 1 R U
LINER: CLA55 B RIPRAP -- � 9�1
WIiH FILTER FABRIC 1...�� 7UCK
STA. 19 + 33
B=5 �
D=1fl
W_o �
iD8
\ \ �
s� � �
^ \ �
� � \\ \\
\ �
\ \\\ \
\ ✓�\ �
�S �
\ ��
��� �s
\J \
S\
�'��'s
�\ \
\
\
\ \
� PAVEMENT��tEI�OVAL
\ �
SEE SHEET b FOR\PRGIFILE
Z `
O �
w �
� 5
�
�
c�
�
�
EN
�
�
�
u>
cv
�
�j
�
Z
�
SKETCH SHOWING BRIDGE /ROADWAY RELATIONSHIP
APPROACI-I SLAB APPROACH SLAB
L- STA, 16+59088 -L- STA� R+84e13
�\ �
TYPE-III N TYPE-III
s -� - �
°, �J
_� � _
�l
�
�
�3
�
���
�P�
�
RM' SHEET NO.
DWAY DESIGN HYDRAULIC
ENGINEER ENGINEER
YPE—III �� � TYPE—III � � � i
`� � � � �} ; E�o�" PERMIT DRAWING
END BRIDG�
�- STA� ��+73,�3 � k,'�°%�� SHEET 3 OF 6
� .. . - . I„ / .
BEGW BRID�E
_ L- STA, 16+70 88
� ' � � / l ' � i �,�� � i � � � - - S�O.O�g7�6 r �� ! � � ,� �k / e`' � � ��. � � V�\�, '
— _. - � �, �
�-.,,, i — � . � _,� , ,; � � � � �3<, Q � ,�
/_ _' / � � � � � � -- �' � �' " � - = , � � �� A� �i V��\ � � � , �\.`, �A �. ��.��A�����v�
/ � :6
,
, \
� �,�� � � , , , , I , � y �� � � �� �:� � �
— � '--�.i�
� � I � — 1
' � ' � � � / � � ) - � � � a, ��� �" �� , � � � ��s - � � � � � � � \ \ A �A\\\\\\\ �� I \�A=�aVA\\\\°;� A
� - .,,,
� ��� ( �
_i- �u,e I \� � / l � r/.�: J j. � �. �� � � � �� " � � I �.�' i�'� W TEOR MPAC SRFACE 9 � �, � � '�'iI I ` .�. \\ \'�\ ����\��\"' \\ \ � ` \ .
/_ � � / ,- !��J �� �� � ���%° r° / - - � ��''� 4'��r� , � �i ��� ` . � \�° \\\� ��
� � —�'�! �� _��.� / � ��i ! � �Rass � � 1 � ; o q � �' ' �\ V � V� �A\\���� \\ �mA �� \:
--- ��-- — � , � � � � - SITE��� � �--� =� � �,�� , � � �� ���s,�����������a����� �
�. — __,� I
� 1 � `="' V .� � ,s / �1 � —, ! �)5' ... E SEE DETAIL � I _ � � \ �
( . � A �� � � o � y ��' ,. ' / � v � � 1 � ��9 v � � � '' � � �� ���, ' I � � � X-= �F � � l � /� I \ �� � �' \ � � �� � � � �\\\V����� ���� � ��
,
�\v /� � '�� ��, �,.: _��/ \ I / ` 1 I $. / / — \ I ` �.. I `� •/ - — . �.. 'U -_=� � RA,N..�.�\\.., � _ . \�°, I �I';r � I�III�, 1,�.,; \ �l, � \ � \\ \\ \\\\\ \\\\\c\\\\\\\\ \�\ \�
i � � '
� _ �
' I ) {^ 1
� 1 / J / }��� � �, \ � I \ � I ` � \ ( . . ; / , , )5 ' � � , � ' � � � � _ � \ G R4 " � I I / � � / \', � � � � � \ � \ � \ � \� \\\ \\ \ ''\ \\ \`\ 1 .
� � m J / � � � s` ;. , �� ,�'� , �39"S � / �� � � � � � ��� ��� `\
, � , .,, �,� , 1 � , ,— �`, I ` ��� \
_
� �
�, , � :
,
,
= ( \ / + � � � `, f5— p� � , � ,� �,�.�� r I�; �� �, �� �� ���\��� \\ �1\1�
; � � � i � — �" ` '`'', ' . - � ��� � � �� �� � A : � v . `
� � � � � �� � �i �' � � �- A . � A � � \ � �
/ � \ � \ � � : l, �i'' _ _ _ �-„�" /� /� REM�Q`/E ( '� \ \
� s :
� `' ` � ' � 1 ; �-- _ �w ,_ — ,—�'`�" .�., —� 4 <;e\�l _, � — � \ � ����m \�\ �x����� ������q
� \
/ � ` f 1 rrSi� / � "` / .
i � � ` j / X v ��. � / /r � -�". ' � �4VC v�,,,� � � — � `� v � � � � � � �� � �� � ���
V � � ���-�V�� � \
�a =
� � _ t ,.
� �� � �� �� �3 -
� � � ,
1.i ��s , � � �, , �� � � ,� � i �� �i��� -��= �� � � �
_ - � ; � �� '� � � � � ���
`�� --- � , \
- `� e �� � � � \ ������ ���������A���A� ��
� ��� � � � � � ��I � �� � � O ` -T � � � � v �, A � � � �
j �. GR S � , � � - � � . . 1�M ARY SURFACSEE \• � \ �\ � � � \ \ \ \\ \ `\ �
\
Y I � / . .. ' ./ / : � . �. �-` . WATER I PACTS ��� � \ � `.. ��.. \ \\ \ \ \ � ` \ � \ \\\ \ � .
�-<'���3 � —� � +.*� � � � � � � �� � i E ss �kae B � � �'� °rsrAia O�' �� �;� � � � � � �s � � � �
�`,!I /, �\�, , cRa'ss x ,/ /�; � �,/� E E � ��\\ \ � � \ �� � � \� �� 11 \1�`��\\\\ �
� � % z�� , "�� ",.. � � ;r��� 1����� � � � � � � � � � � � �
� � �
� �� / � � � ' ,�� i .� � � \�- �. ���' �� , �v � __ . ���� 1 ���� 1� V �
� � :
� � "�'� _� � '�'� ' � ,, � -- � .._ F � .x i l �A
� � �/ .� . � �� \ \
��� \ �\
` \� � a � � �' � �+ '' ��� � � / � /�� '' � `�,� � ` � � �. �� \ � F � �,„� � �'!� , � � � ��� `.� V�
yj I � � �\k I �� Z� / �, E ! . .. hEE DETAIL B � `,. - - � a\ �� � >` � `` \,\ , `� � � \\ �� � \\ �
�f �7 f/ . {3>� �� \. / � � � .� r ' - CLA55 II RIP RAP ��� � . � �f � � � , . \ r � \\ \ �
t�����, /b � d �� X X � � � � coRN Fie�� � � � ' � � � �„�
I � �;;�"' ,� - / � .., i toAppron.Elev � 73511 I \� .\ \�\ .\..\\\ -' � � \\
� ��} 0j� � >
� \ � , ' � � �/ -a STROCTURE PAY /TEM , \ � � �� � - \ � � 1 _ � � �\ \ \\\\
� I �� ' / � � �� � � `��/j E / 1 / ' — — c� s Rld ana —i toni \ `\ � ` � `:'�� �� � _ I � � ` ���.1 � \P
'�II i i \ esr ` � / / � / ' cor�N FiE�o 'S�ea�Pfde s sv � \ \ �\ , �\� �\ ��� � �\ _ --- � �\ \ � '\��1
III / � GRASS ' �3 /� � �� �' SEE�DETAI��R � . !�! pe w/EI6ow5 . \ ��� .... • � \\ \\ ' �\�� � _� �� � � \ �m, \ m I
S/� TIE TO \
I ON� % i E%ISTING DIiCH / � \ ��
� J _
� �„II � � l � �� � ��� � ��� i � / i � � � � �� ��'�� � _ � � �' ���� �, � � — = �� ���V�\\V� \�`� �
�� ° � � 5 � � � �
4 �� �a�� � ' � � � / f '_ - � ' `�`�, � _ ' A � � V A��� � � � \ �\\ ���
� � t�� � / � A � � � �A � �� � � � \ �� \
I ' II I� � � l f �i�� ����� � � �) V � , � � � � � � � � �—� j � �e ��.,� / � �� � � �\ � � �� � �s,� � ' �� ���� � � � \� A\���� �
� �� � �
��''' � r � � _ � � ��'�w � � r�'� ,� / � / 1 i `� �� � � 1 � •�`��� V`� � ��� ,��o� \ �
� _ � ��—�
� �� , � � R ;j � , :4`F ' � � �\ l �� �� � ,,. - , � — � � � �� '` � � \��� �� � \`' � � � \ � � ��`� � ��� �� \\ � ��� �' ' �
, ,
-� ;� � . ����j.: �.� t� � � � V� - �� , �'1 � i, . A� �V' �, `, � �� ��;A��A V��:A �
� �
, �� � `+�r' _ ���K � � � � � � � � VV�_ � � �RN RE� �� � � �\ , � � � �� � � � �� �� .
�� � ���� H�S � ' � � �e � e � � ��� � � � � V . � ��. ������ � ��� ����� �� � ��V I ���-
- i � _
3- I p �
. �
� v '� �� � /�� � A ^� '� f � / � � _��� � / 3,� � � � � � : 'I � � � s \\ � � �� 1 \\� � ` \��� ��� ��� � ���� � .
��� s� i< < \ \ �, / ' � � � /,�"/ � , V A � A � � �woaos,� �� A� \
� � ��, �, ���� � , ��, � � � i� � � � � � �� � �'�' — �'� � � � � � ' ���'�� ,� '�� �� � � �� ���� �,�. �, � �.s,�� �
��✓�� � l � � � '- �'�� \ V� l I I �e � - -,_�-� �:- � �� �,L � �,�.,�� ���� � � � � l� � 1 \,�� �:, s� � ��� , � ��'� `'��V'�y� ��V� � ���.�;
.
- / � 1 � � � 1 � l � �� �� � � ) � �`l �_ � � � � � -- � — � � 1 � � � v v � =�� ,�� � �� � � y v �
( � � � ��I � PREF.ORM�D SCQUR H
� \ �
�
,
�
�
� � � ����� � � 1 � � aM'�/� � �� j � , � �_ A � � ���A �•�; A��������
, . � � � V A, � � � � � � � OlE � � � �� �� � � \ � � � � �� �`� ���
*NOT TO SCALE s \ \
� \ PLAN VIEW J� \ " \ � -
\ \ � WITH LNATURAIGROUND \ � \ \
VA / \ �
V A i R r�. � \ ��
s �'� � �
� � �"t DETAIL C oP�i�o`oi��n� :.s� �
� RIP RAP AT EMBANKMENT '\
, �o„o =�e�e� � J JS\
s
Dit<h
—�5 \
� Grode Georextile J� �
DENOTES IMPARS IN sq�a,e r.elo,med �
SURFACE WATER 100' 0' 100' �� s�o��Hole (asH� \\ \J`
(R'ip Rap in bosin '�S\\
.: �� � ■ , Type olLiner� Closs IRip-ROp � IS Tons notshawn For<lorify� Se w �
� DENOTES TEMPORARY ceo+e.��le as 5 e.
IMPACTS IN SURFACE WATER GRAPI-i4C SCALE FROM STA.16+65 TO STA.17+Od RT B=5 H
\
D=1fl \
W=0 H \� \
SECTION A-A �J'
�� PIPE �d = 30'� �, \
(
S�� F D
PSRM �
INFLOW NAT RAL �
_ ... 1 R U �
LINER: CLA55 B RIPRAP -- � 9�1 1/ �\ \
WIiH FILTER FABRIC MIN 1' iUCK N
aa � PAVEMENT��tE/�OVAL
5TA19+33 SEE SHEET b FOR\PRbFILE
. . . . . . . . . . . . . . . . . . . .
:CC�CC�CCC:�CC:C::::
:���E�Ee6:::::::� :
.� ... :...::::::::::
. . . . . . . . . . . . . . . . . . . .
:::::::::�C::::::::�
E ��;;'�uuu���
C°'u'C7�CC�C7►.id'r
...,...�■��v■■.�.■■
.v.:..�w. �:� I�v:
CC5 :C�CCS;�� n��::
- �.�.
iiu�u�w�c�i3i7iu ■
�������u����� i iu���
�������������GII�����
�Onnn���74e:Jr'���
IS�Rl��L4f.I.lEO �U�J V ���
��r�rr��aA�������
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L- 16+90-17+10 Bank Stabilization < 0.01 < 0.01 68 32
TOTALS*: < 0.01 < 0.01 68 32 0
*Rounded totals are sum of actual impacts
NOTES:
2013 10 24
�
�
�
�
T
-o
�
rv�
ti
m
/
o•o
�,
��
o�
�
��
O 3
N �
� O
Q�
��
-�
�
�
�
�
.,
�
V
W
O
QC
�
�
�
�O
�
0
V
� �
�
V
�
�
O
V
See Sheet 9-A For Index of Sheets
See Sheet 9-B For Conventional Symbols
See Sheet 1-C For Survey Control Sheets
�.
� \
� � --__ r_�
BEGIN T.I.P. PR�
-L- STA. Il + 94.53
�
�
�
�— —���
/ ��� i
��
/ �, �' �
� � �
� � � ��
I i ���
/ �
� � �V���� �
� /���IDi�\�\�
� � .�0� � �
� ��� �� �
� � \\
i
� � \
�
����� �� �� ���� ��������
����5�� � `� �II� ���������YS
SURRY COUI�TY
LOCATION: BRIDGE No. 39 ON
MITCHELL RIVER
1328 (HAYSTACK
TYPE OF WORK GRADING, DRAINAGE, PAVIIVG, STRUCTURE
� , �,
, �, .
!��
. _ � ; ,�,
,�- - � � - ; �� ,� !
_ - � �, �: �
, - - , ��
� - ' � Rp
_> ��K � • � -c
, � � Nays� �
'R 32a'
� s ,
,� , �
—L— STA.16 + 70.88
\ \\� ,�'Q
\ � � �
. „ �,
: \ � , ��
�
'\.�, �
.�
•\ , � �
\
� \ E111D T.I
. , \ ��TCy \ \
���
. \ �� 92�� \ �O �
' � �,o�
'. PROJECT B-5173I
-L- STA. 20 + 25.00
. \ � � ��j��S'���
'�� '. \\ �
THIS IS NOT A CONTROL OF ACCESS PROJECT. -, � \�\
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES, BUT LIES WITHIN � �. \� \
THE BOUNDARIES OF DEVOTION RURAL HISTORIC DISTRICT (SR 859). � \ �
** DESIGN EXCEPTION REQUIRED FOR DESIGN SPEED OF 25 MPH. \ , PRELIMINARY PLANS
DO hOT USN, F'OR CONSTRUCTION
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. '
Prepared in Me Office of: HYDRAULICS ENGINEER
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH
ADT 2016 = 174 DIVISION OF HIGHWAYS
50 25 0 50 l00 ADT 2036 = 254 LENGTH ROADWAY T.I.P. PROJECT B-5V3 = 0.138 MI �aoo a�r�n xzage Dr., nare�gh ,vc, z�e�o 4E�F NOBppC�
DHV = 10 % 2012 STANDARD SPECIFICAT70NS op 9p'
PLANS � �
D = 60 % P'E' y .
SIGNATURE: aa
50 25 0 50 loo T= 5 %* LENGTH STRUCTURE T.I.P. PROJECT B-5173 = 0.019 MI RIGHT OF WAY DATE: JASON MOORE, PE '. a
** V= 55 MPH FEBRUARY 27. 2015 rao�scr ExcrxEEn ROADWAY DESIGN �RgP Q�.!
PROFILE (HORIZONTAL) * TTST =2% DUAL 3% ENGINEER OF TpAy�9e
TOTAL LENGTH OF T.I.P. PROJECT B-5173 = 0.157 MI LETTING DATE: NYA K. BOAYUE, PE
�O rJ O �O 2O FUNC CLASS = RURAL LOCA PROJECT DESIGN ENGINEER
FEBRURAY 16, 2016
PROFILE (VERTICAL) SUB REGIONAL TIER PE
SIGNATURE:
Note: Not to Scale
*S. U.E. = Subsurface Utility Engineering
BOUNDARIES AND PROPERTY.•
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Corner
Property Monument
Parcel/Sequence Number
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
Known $oil Contamination: Area or $ite —
Potential Soil Contamination: Area or Site —
�
0
EiP
�
O
i23
—X x x—
e
e
�
— — — — x L B — — — —
wLB
EeB
EPB
� �
� �%
BUILDINGS AND OTHER CULTURE.•
Gas Pump Vent or WG Tank Cap O
Sign �
Well °
Small Mine 'SZ�
Foundation �
Area Outline 0
Cemetery 0
Building �
School �
Church �
Dam
HYDROLOGY.•
Stream or Body of Water
Hydro, Pool or Reservoir
Jurisdictional Stream
Buffer Zone 1
BufFer Zone 2
Flow Arrow
Disappearing Stream
Spring
Wetland
Proposed Lateral, Tail, Head Ditch
False Sump
�----J
—�s —
BZ 1
BZ 2
�... —
�... —
O�_...�, �
�
�
� F�
m
����� �� ����� ��������
�������� �� ��������
CONVENTIONAL PLAN SHEET SYMBOLS
RAILROADS.•
Standard Gauge �sX ,R�
RR Signal Milepost MILEPo T 35
Switch 0
SWlrCH
RR Abandoned � � �- �-
RR Dismantled --------
RIGHT OF Wf1Y.•
Baseline Control Point O
Existing Right of Way Marker �
Existing Right of Way Line
Proposed Right of Way Line �
Proposed Right of Way Line with �
Iron Pin and Cap Marker
Proposed Right of Way Line with �
Concrete or Granite R�W Marker
Proposed Control of Access Line with �
Concrete GA Marker
Existing Control of Access � A;—�—
Proposed Control of Access �
Existing Easement Line --E--
Proposed Temporary Construction Easement - e
Proposed Temporary Drainage Easement TDE
Proposed Permanent Drainage Easement PDE
Proposed Permanent Drainage / Utility Easement pue
Proposed Permanent Utility Easement Pue
Proposed Temporary Utility Easement Tue
Proposed Aerial Utility Easement quE
Proposed Permanent Easement with O
Iron Pin and Cap Marker �
ROADS AND RELATED FEATURES.•
Existing Edge of Pavement
Existing Curb -----
Proposed Slope Stakes Cut --- �---
Proposed Slope Stakes Fill --- F---
Proposed Curb Ramp CR
Existing Metal Guardrail
Proposed Guardrail r T T T
Existing Cable Guiderail n n �
Proposed Cable Guiderail � � n n
Equality $ymbol 0
Pavement Removal �
i�EGETATION.•
Single Tree 4�
Single Shrub o
Hedge M^^�-^^�.^^M^r""�
Woods Line �""'-'
Orchard
Vineyard
EXISTING STRUCTURES.•
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall -
MINOR:
Head and End Wall
Pipe Cubert
Footbridge
Drainage Box: Catch Basin, DI or 16
Paved Ditch Gutter
Storm Sewer Manhole
$torm Sewer
UTILITIES.•
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
U/G Power Cable Hand Hole
H-Frame Pole
Recorded lVG Power Line
Designated WG Power Line (S.U.E.*)
TELEPHONE:
WATER:
Water Manhole OO
Water Meter o
Water Valve �
�? 4 �? C3
Water Hydrant �
wr,erora
Recorded U/G Water Line •
Designated WG Water Line (S.U.E.*� - - - -•- - - -
Above Ground Water Line A�c wa.e�
CONC
� CONC WW I
�
CONC HW
>----------C
�CB
OO
s
•
•
O
�/
r
��
Existing Telephone Pole �
Proposed Telephone Pole �
Telephone Manhole O
Telephone Booth ❑'
Telephone Pedestal ❑O
Telephone Cell Tower �
lVG Telephone Cable Hand Hole HH
Recorded U/G Telephone Cable �
Designated U/G Telephone Cable (S.U.E.*) — - - - -�- - - -
Recorded U/G Telephone Conduit *�
Designated U/G Telephone Conduit (S.U.E.*� - - - -��- - - -
Recorded U/G Fiber Optics Cable T��
Designated U/G Fiber Optics Cable (S.U.E.*� - - - -T �°- - -
N:
N Satellite Dish CC
TV Pedestal ❑O
N Tower �
WG TV Cable Hand Hole HH
Recorded U/G N Cable �°
Designated U/G N Cable (S.U.E.*) - - - -��- - - -
Recorded U/G Fiber Optic Cable �° °�
Designated U/G Fiber Optic Cable (S.U.E.*r ----�� F�- --
GAS:
Gas Valve �
Gas Meter �
Recorded U/G Gas Line °
Designated U/G Gas Line (S.U.E.*) - - - -�- - - -
Above Ground Gas Line A.c ca�
SANITARY SEWER:
Sanitary Sewer Manhole OO
Sanitary Sewer Cleanout 0+
U/G Sanitary Sewer Line s�
Above Ground Sanitary Sewer A�c sa��+o�Y Sewer
Recorded SS Forced Main Line Fss
Designated SS Forced Main Line (S.U.E.*) — - - - -F�s- - - -
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility Traffic $ignal Box
Utility Unknown U/G Line
U/G Tank; Water, Gas, Oil
Underground $torage Tank, Approx. Loc. —
A/G Tank; Water, Gas, Oil
Geoenvironmental Boring
U�G Test Hole (S.U.E.*)
Abandoned According to Utility Records
End of Information
•
O
O
❑s
z�.�
0
usT
0
�
�
AATUR
E.O.I.
�
�
�
�
�
,�
�
�
�
�
�
�
��
�
��
�-
_�
N�
��-
o��
��
���
_�
o �.
� 3L
��(
�
Qo-
��
��
o�
�R T�E Y C 01�TR OL SHEE T 8-�173
o�sco No��Ti-�
————— ——— — ———— — ———————
�) 9817470�533
�) 982442e58°�4
� ) ��324�7 e 7715
EIST E�EVRTION � ST�TIQN OFF�ET
— ———— ———— — —— ———— — —————— — — ———— ————— ——— ———— — —— ——
14?584�07144 1363038 OUTSIDE PROJECT �IMITS
14�622�e786� 1355e34 17�83e5� 61083 �I
14366°2e1D13 1352e19 OUTSIDE PROJECT �IMITS
BM*�1 E�EVRTION = 135�013'
N �8235�o E 14361670
� SI�TION 16�850�� 5�' �EFT
DISK IN HEqDWR�� 145 HLZ 176°�
I
I�
�v
I �
I
I
_---a
�-'— ;
�' ►
y.r-—-- ,
/ '
/�
�
� - - —
� �
/�
�
i' ��
�
i ' �
���K R ,,
, NPYS ,
,
� , ..-, ,-
, ,
, 32a ,
' ► '
,
�' � , -'SR -' ,.
BEGl1� T.I.P.PROJECT 8-5173 �'�----------- ,,-�' ,�-'� �
-L- STA. Il + 94.53 � �
, -
, -
, -
, -
, -
, -
1� = 981923. 7136 - ' � � ' �
, —
, —
E = 1435�30.3882 � � �
, ,
, ,
, ,
� , ,
, ,
� � �
� � �
� �
� � �
�� ��� ,-'� BEGI11l BRIDGE
' � ` � � � -L- STA. l6 + 70.88
i � � � �
/ � � � � �
� � � �
� � � � �
�
� � �\ �� �
� � � � �
�� � � �
� � ----� �
� �� �
i � � '
� �
� � �
i� ��
�
� '� ���
�' i � �
� ,, �- � � �
i , -.��o -, , � ,
� �-�O - �, � �
, ,O ' � _ , ,
� ; , �, , ,� �
' O � �
� ,- , �
�
� - 'C � � �
/-'/ ,� � �
� �� " ` �
��i �� \
�� � \
� � \
�
� �
I
I
1
I
I
I
�
/ 1
/ ,�
�� �
�
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "B3911-2"
WITH NAD 83 STATE PLANE GRID COORDINATES OF
NORTHING: 983048.524(ft) EASTING: 1437903.644(ft)
TH
ALL
ELEVATION: 1331.092 (ft)
E AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99997301
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"B3911-2" TO -L- STATION 11+94.53 IS
S 60°18'56" W 2271.33'
LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAUD88
n
NOTES:
PROJECT REFERENCE NO. SHEET NO.
B-5173 1—C
Location and Survevs
1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING
PROJECT CONTROL DATA AT:
HTTP://WWW.NCDOT.ORG/DOH/PRECONSTR UCT/HIGHWAY/LOCATION/PROJECT/
THE FILES TO BE FO UND ARE AS FOLLOWS:
B5173_LS_CONTROL. TXT
SITE CALIBRATION INFORMATION HAS NOT BEEN PROVIDED FOR THIS PROJECT. IF FURTHER
INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
� INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL
BY THE NCDOT LOCATION AND SURVEYS UNIT.
PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM.
NETWORK ESTABLISHED FROM NGS ONLINE POSITIONING SERVICE (OPUS)
SEE GPS CALIBRATION SHEET FOR HORIZONTAL AND VERTICAL COORDINATE VALUES.
E1�D BRIDGE
-L- STA.17 + 73.13
— — _ �
— — �
— — — — �
� � �
� \
� \
� �
\ �
, ,
� �� � � � � � �
��� , �
� ' E1�D T.I.P. PR OJECT 8-�173
� � � �, ' �
� � ` � � � -L- STA. 20 + 2�.00
� '� � � � � ,
. � �
. � �_
� � � `� ,
. � �
� � �'. � � E _
.., � ,
�' '�� � `�
� � �
�� �
., �
�.� ��� �� �
�
, � � �
` �j ` �
.� �
�� � �
.\
.\ \ \
� \
� .\ \ \\
\ �/TC ' � \ \ \
\
.� ,�,���.,� � %
� , � �i�� � �� �
'�' ' � �
,\ ���,0\
� � � y,
� � � �,
.,
,, ,, \ �, \
._ \
�� �
. �� �
�
'. � � � `� �
-.\ � �
� �
� � �� � �
,\ �
, �
\ \
1�C DOT GPS STA TI01� B3911 1
L�CALIZED PROIECT COORDI1�lATES
1� _
E_
982398. 75'8�
1437063. 7887
NOTE: DRAWING NOT TO SCALE
1�C DOT GPS STA TI01� 83911-2
LOCALIZED PRO JECT COORDII�A TES
1� _
E_
983048.5240
l43 7903. 6440
982449.��38
1436490.3�20
N
Z
�
N
i
W
�
�
r
�
J
W
v
�
Q
�
�
W
�
z
�
�
�
�
�
Y
°o
m
O
0
v
�
�
�
W
�
�°
�
�
O
j
W
�
�
\
�
\
�
Z
O
�
,
>
�
�
�
�
�
�
�
�
�
�
�1
i_�
�
�
�
�
-,�,
�,
�I
���
�
L�
�-
�
O �
� O
�; L�
-��
�,��
�
O ��
N3�
�
z ��
�o
��-
��
orr
SKETCH SHOWING BRIDGE /ROADWAY RELATIONSHIP
APPROACH SLAB
,-L- STAo 16+59088
� BEGIN BRIDGE
-L- STAo 16+70088
ARCADIA LLC.
DB 600 PG 649
\� �� S
� ��, ��
BEGIN TIP PROJECT B-5173 �-�-��s�
—L— STA. 11 + 94.53 \
� Y
� �� � -L - PC Sto. ll +42.98 '
_ � � -�� -�-�
� � �- GRASS
X
� � � ���,.� ,
� � � � X +�
�,
� � �� �� (E)
� � � � � � � �
� � �� � �� \ � \ ��X—i�
� � �� �}\� \� �
� l � � esT � _ �
� � � �RASS � �
� �-B�- 4 POT oN � l /2 � �
�� I � � � �
� �
�� � � MP �
� �� � � �
o �
I� / , � �, �
/ � �� �
� / � � ����� � � � �
� �2� � < �
��`� � /�R �� / �
� � �� ��� � BEGIN CON��. �
� � � � / N Py S� � -L ll t,54.23 � , � �
s �/ , �
/ \
�is���� ��
�To / �
✓� • `
�
_ —. �
� �
-L - POT Sto. l0
DO NOT DISTURB WHITE PINE TREES
-L- STA.11+50 TO 14+00 AS
DIRECTED BY THE ENGINEER �,
APPROACH SLAB
-L- STAo 17+8qe13
/END BRIDGE
-L- STAo 17+73013
—L — PC Sto. 17+87.66
�
+
o -
O
-L - PT Sto. l5 +26.4/
-B�- 5 PINC
-E3Y1- ( '�OT
DO NOT DISTURB STREAM BANK AND
TREE AS DIRECTED BY THE ENGINEER
TlE TO EXIST.
W/W FENCE
/ �5�
/
� ,.,,,,..,-,.� ,,. � � �
FROM STA. 12 + 00 TO STA. 16 + 00 RT FROM STA. 16 + 00 TO STA. 16 + 70 RT
FROM STA. 19 + 00 TO STA. 19 + 41 LT
FROM STA. 16 + 65 TO STA. 17 + 04 RT
—L—
Pl Sto 11+68.76 Pl Sto 13+6/.3/ Pl Sto 18+76.37
p= l° 28' 35.8" fRT 1 0= l4° 05' 07.6" fRT 1 �= 59° 53' 28.3" fRT l
D= 2° 5/' S3.2" D= 4° l4' 38.9" D= 37° l2' 18.2"
L= 5/.54' L= 33/.88' L= 160.98'
T= 25.77' T= 166.78' T= 88.72'
R= 2,000.00' R= 1,350.00' R= 154.00'
Vd = 50 MPH Vd = 50 MPH Vd = 25 MPH
—L — PC Sto. l7 +87.66
ARCADIA LLC.
DB 600 PG 649
��
Square Preformed
Scour Hole (PSH)
(Rip Rap in basin
not shown for clarity)
SECTION A-A
PIPE (d = 30")
c / �D
�� PSRM �
INFLOW
LINER: CLASS B RIPRAP
WITH FILTER FABRIC
�
MIN. 1' TUCK
STA. 19 + 33
'� � � `;
�"+ 50.00
,�Ex. �w)
�o rc �r�
so,
���yA�
n '�
WITH NATURAL GROUND
�8
PROJECT REFERENCE NO.
B -5/73
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
4
HYDRAULICS
ENGINEER
]��]EIL��I[�NA]Eg� ]�ILAIN�
V➢� N�°ll° �J�]E �F�][3 C�N�°lC']tB�JC°Il°d�N
-BYI- 8 POT
—L — PT Sto. l9 +48.63
ARCADIA LLC.
DB 600 PG 649
TIP PROJECT B-5173
—L— STA. 2 0+ 2 5. 00
�Jr�
�
END CONST.
-L 2/f64.29 ��
� -L - POT Sta. 2/+67.99
�� �
-B�- e POT
� � �
� � �,
� �
� �
�
�
� ��
\✓
S �
i�����
�♦�♦�♦�♦� • � • • �
►�_�_�_��
• • . .. �
■■■�i ■��■��
;� .,��9ii�i
�.� ���i ��r�:�;�
E�::�����i�ii
.....�
.....��,,..
N�
�
O�
�
�'
O
N
�
Q
��
c�l'
OC