HomeMy WebLinkAboutNCC230555_NOT Closeout Documents_20240209 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481
County: Pitt Project: ECU College Hill Drive Steam River basin: Tar-Pamlico
Person financially responsible:East Carolina University-William E Bagnell, Project#: PITT-2023-011
Assoc.Vice Chancellor for Campus Ops.
Address: 1001 East Fourth St.,Greenville,NC 27858-4043
1. Project Location: College Hill Dr,Greenville
Pictures: No
2. Weather and soil conditions: 75 degrees,sunny,dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No contact was made. Title:
Inspection report: Sent Report Date given/sent: October 19,2023
9. Corrective action needed:
10. Comments:Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring
or self-inspections are required.The project is in compliance and released under the SPCA.The permittee must request
termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)via a Notice of
Termination(NOT).The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: October 16,2023 Time arriving on site: 12:00 PM Time leaving site: 12:10 PM
CC: