Loading...
HomeMy WebLinkAboutNC0028916_Notice of Violation and Pretreatment Performance Compliance Inspection_20230829ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality Certified Mail # 7022 2410 0003 3233 6608 Return Receipt Requested August 29, 2023 M. Bryan Bowles Town of Troy 315 N Main St Troy, NC 27371 SUBJECT: NOTICE OF VIOLATION, NOV-2023-PC-0459 Pretreatment Performance Compliance Inspection Troy WWTP NPDES Permit No. NCO028916 Montgomery County Dear Mr. Bowles: A Pretreatment Performance Compliance Inspection of Troy's Pretreatment Program was conducted by Sharon Moran from this office on August 3rd, 2023. The purpose of this inspection is to determine the effectiveness of the pretreatment program by reviewing various aspects of the program, which included files and records, industrial user inspections and monitoring data, data management procedures and adherence to the Enforcement Response Plan. Enclosed, please find a copy of the Pretreatment Compliance Inspection Form. The Town of Troy WWTP is currently a 1.2 MGD permitted facility and has two (2) Significant Industrial Users; Republic Services dba. Uwharrie Environmental, and Saputo Cheese. Two permit files were reviewed: Republic Services dba. Uwharrie Environmental, and Saputo Cheese. A site visit was not conducted during this inspection. This Pretreatment Compliance Inspection report indicated that the Town of Troy's Pretreatment Program did not meet all reporting requirements as outlined in 40 CFR 122.41(I)(4). The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report. Please respond in writing to this office within 30 days of your receipt of this letter regarding your plans or measures to be taken to address the following issues: The Town of Troy has not been sampling for Oil and Grease at the approved frequency. D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Fayetteville Regional Office 1 225 Green Street I Suite 714 1 Fayetteville, North Carolina 28301 NORTH CAROLINA - oeuaMemofEnvi—memaiauai\ 910.433.3300 The slug control and spill plan's signatures were past the integral year expiration for contact update and re-signing. Files maintained by the WWTP did not contain the most recent enforcement and proof of penalty collection notices. Thank you for your continued support of the North Carolina Pretreatment Program. If you should have any questions, please contact Sharon Moran at (910) 916-3489 or at sharon.moran@deq.nc.gov. Sincerely, DocuSigned by:: ,V•&I I E4E1A9691DB248E... Mark Brantley, Assistant Regional Supervisor Water Quality Regional Operations Section Fayetteville Regional Office Division of Water Resources, NCDEQ Cc: Upload to Laserfiche D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources !� Fayetteville Regional Office 1 225 Green Street I Suite 714 1 Fayetteville, North Carolina 28301 NORTH Cno OLINn Department tenvironmentaiQuaii� /`� 910.433.3300 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NC0028916 I11 121 23/08/03 I17 18I D I 19 I s I 201 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I ni I 71 I 74 79 I I I I I I I80 701� I 711 LL -1 I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09:30AM 23/08/03 21/02/01 Troy WWTP 650 Glen Rd Exit Time/Date Permit Expiration Date Troy NC 27371 01:OOPM 23/08/03 25/06/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Bryan K Bowles/ORC/704-474-4191/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Benny Ray Dennis,315 N Main St Troy NC 27371//910-572-6541/9105723663 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Other Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Sharon Moran Docusignedby: DWR/FRO WQ/910-433-3300/ 8/30/2023 LvDIn, Aurm. EsME17E499D6943D... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date Mark Brantley DWR/Division of Water Quality/910-433-3300 Ext.727/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCO028916 I11 12I 23/08/03 117 18 1 p I (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Enclosed, please find a copy of the Pretreatment Compliance Inspection Form from the inspection conducted on August 3rd, 2023. The Pretreatment Compliance Inspection was conducted by Sharon Moran, Environmental Specialist, of the Fayetteville Regional Office and Bryan Bowles, Director of Town of Troy's POTW. The Town of Troy WWTP is currently a 1.2 MGD permitted facility and has two (2) Significant Industrial Users; Republic Services dba. Uwharrie Environmental, and Saputo Cheese. Two permit files were reviewed: Republic Services dba. Uwharrie Environmental, and Saputo Cheese. A site visit was not conducted during this inspection. This Pretreatment Compliance Inspection report indicated that the City of Troy's Pretreatment Program did not meet all reporting requirements as outlined in 40 CFR 122.41(I)(4), namely that not all sampling requirements were being met in the approved Short Term Monitoring Plan. The City of Troy has not been sampling for Oil and Grease at the approved frequency. Additionally, the slug control and spill plan's signatures were past the integral year expiration for contact update and re-signing. Finally, the files maintained by the WWTP did not contain the most recent enforcement and proof of penalty collection notices. Page# Permit: NCO028916 Inspection Date: 08/03/2023 Other Comment: Owner -Facility: Troy WWTP Inspection Type: Pretreatment Compliance Yes No NA NE Page# NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL QUALITY BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)] 1. Control Authority (POTW) Name: Town of Troy 2. Control Authority Representative(s): Bryan Bowles 3. Title(s): Director POTW 4. Last Inspection Date: 7/20/21 Inspection Type (Check One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ® NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: ICIS CODING Main Program Permit Number I NIC10 10 1 21 81 91 116_1 MM/DD/YY 1 08 1 03 1 23 I Are Milestone Dates Being Met? ❑ YES ❑ NO 7. Current Number Of Significant Industrial Users SIUs ? 2 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users CIUs ? 0 16. Number of CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Pul 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? EYES ❑ NO Feb 2022: TSS-clarifier was stuck, so it was cleaned out Oct 2022: BOD/weekly and monthly Ammonia, one time slug from industry. ® YES ❑ NO One time slug from Saputo-NOV Limits: None Reporting: None dished: None None ❑ YES ❑ NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ®YES ❑ NO Is Table Adequate? ® YES ❑ NO (eDMR) NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 25. yourself! 26. 27. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ❑ YES ® NO Division Inspector, please verify If NO to 23 - 26, list violations Oil and grease were not sampled for Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ® YES ❑ NO If yes, which ones? Eliminated: oil and grease Added: 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 2/12/19 ® Yes ❑ No 4/24/19 ® Yes ❑ No 1/31/24 Industrial Waste Survey IWS 11/21/19 ® Yes ❑ No 2/12/20 ® Yes ❑ No Sewer Use Ordinance SUO 12/28/18 ® Yes ❑ No 1/3/13 ❑ Yes ❑ No Enforcement Response Plan (EPP) 12/8/09 ® Yes ❑ No 12/21/09 ❑ Yes ❑ No Long Term Monitoring Plan (LTMP) 11/2/20 ® Yes ❑ No 12/2/20 ® Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name Republic Services 2. Saputo Cheese 3. db1. a. Uwharrie Environmental 30. IUP Number 0004 0003 31. Does File Contain Current Permit? ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No 32. Permit Expiration Date 1 11/30/202 1 7/31/2028 33. Categorical Standard Applied I.E. 40 CFR, Etc. Or N/A I N/A N/A 11 34. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? ® Yes ❑ No ® Yes ❑ No 11 ❑ Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? a. ®Yes ❑No a. ®Yes ❑No a. []Yes ❑No b. If No, is One Needed? See Inspection Form from POTW b. ❑Yes ❑No b. ❑Yes ❑No b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic Yes❑No®N/A P ❑Yes❑NoON/A ❑Yes❑No❑N/A Organic Management Plan TOMP ? 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No a. ®Yes ❑No a. ❑Yes ❑No b. All Issues Resolved? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ® Yes ❑ No ®Yes ❑ No ❑ Yes ❑ No its Sampling as Required b IUP, including flow? 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A Sampling as Required b IUP, includingflow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A on time? 42a. For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/A ❑Yes❑No[D ❑Yes❑No❑N/A file includeprocess/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑No®N/A ❑Yes❑NoON/A ❑Yes❑No❑N/A production rates and/or flows as Required by IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No All Limits Non -Compliance from Both POTW and SIU Sampling? 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A All Re ortin Non-Com liance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A a.®Yes❑No❑N/A a.❑Yes❑No❑N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No❑N/A c. If applicable, Did POTW resample within 30 days of becoming aware c.❑Yes❑No®N/A of SIU limit violations in the POTW's sampling of the SIU? c.❑Yes❑No®N/A c.❑Yes❑No❑N/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No ❑ Yes ® No I ❑ Yes ❑ No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken ❑Yes❑No®N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 48. Does the File Contain Penalty Assessment Notices? 49. Does The File Contain Proof Of Penalty Collection? 50. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? FILE REVIEW COMMENTS: Saputo Cheese USA file did not contain proof of penalty collection. INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number 1. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: Phone: MM/DD/YY Title: Fax: ❑Yes❑No®N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No[D ❑Yes®No❑N/A ❑Yes❑No❑N/A a.❑Yes❑No®N/A b.❑Yes❑No®N/A a.❑Yes❑No®N/A b.❑Yes❑No®N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A ❑ Yes ®No ❑Yes ®!o]E Yes ❑ No 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: Requirements: The City of Troy must sample for Oil and Grease at the approved frequency. Recommendations: The slug control and spill plan should have contacts updated and be re -signed. A copy of the most recent enforcement and proof of penalty collection notices should be obtained and added to the WWTP's files. NOD: ❑ YES ❑ NO NOV: ® YES ❑ NO QNCR: ❑ YES ❑ NO POTW Rating: Satisfactory g4inali by: X UnSatisfactory_ PCI COMPLETED BY: Lvbvu AI.Orm. DATE: 2BE17E499D6943D... 8/30/2023 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3