Loading...
HomeMy WebLinkAboutNC0025348_Pretreatment_Annual_Report_20240212CITY OF NEW FERN PRETREATMENT ,ANNUAL REPORT PERMIT #NC11011- 48 PREPAIRED BY: Sara Rhodes City of New Bern Pretreatment Coordinator January 2024 NEW BERN 77��_ CITY OF NEW BERN Department of Public Utilities Water Resources 527 NC Hwy. 55 West, P.O. Box 1129 New Bern, NC 28563-1129 (252) 639-7541 February 5, 2024 NC Division of Water Quality PERCS Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Pretreatment Annual Report City of New Bern NPDES # NCO025348 PDF Files of New Bern's Pretreatment Annual Report for the reporting period of January 1, 2023 through December 31, 2023 are being sent to Kristin Litzenberger and Robert Bullock as mandated by the North Carolina Pretreatment regulations. Enclosed in the report are the Pretreatment Performance Summary (PPS), the Pretreatment Program Info Database, the historical SNC Report, a narrative of the 2023 program (with spreadsheets outlining the program), the Industrial Data Summary Forms (IDSF) and the Significant Non -Compliance Report (SNCR), and Compliance Judgment Worksheets. Should you require additional Information, please contact me at 252.639.7562 or email at arwoods@newbernnc.gov. Si cerely, aoa Sara Rhodes Pretreatment Coordinator City of New Bern Enclosures Cc: Robbie Bullock, WWTP Consultant File Everything comes together here 2023 Narrative Program Spreadsheet NARRATIVE This report is the Annual Report to the North Carolina Division of Water Quality as required by the Comprehensive Guidance Manual. Additional information may be obtained upon request. I. General Information Program Elements: Tony Hawkins, Treatment Plant Manager until December 2023 and Arthur Hough took over at the end of December, 2023, administers the City Pretreatment Program. Sara Rhodes is the current Pretreatment Coordinator and started on September 19, 2021. All Significant Industrial Users have current permits. The Headworks Analysis was approved in 2020. All industries were inspected this year. There were no Industries in SNC for the first six month period, BSH IUP 1100 was in SNC for the second six month period for BOD and oil and grease. More details are listed for each industry below: Craven County Wood Energy L.P. (permit # 1200) Permit: Craven County Wood Burning Energy L.P. is a Significant Industrial User. The permit for Craven County Wood Energy L.P. will expire December 31, 2024. Dainiel Jones is Chemical Tech and Water Quality representative for the industry. Compliance: The facility was inspected on 8/2/2023. Mr. Jones was present for the facility inspection. There were no changes in the process. The plant was well maintained, and the records were in order. There were no violations during 2023. Fees/Fines: The facility was charged $1600 in administration fees and $1111.10 in sampling fees. Billing covered activities from January to December 2023, invoices were mailed on January, 30, 2024. BSH-Range Facility (permit # 1100) Permit: The Permit for BSH Range was renewed last year. The permit for BSH Range is effective until midnight on December 31, 2027. Matthew Herman is the Environmental Engineer and representative's for this industry. Compliance: The facility was inspected on 4/28/2023. Mr. Matthew Herman, Environmental Engineer, was the representative for the facility. The city has received the Production Records and copies are attached to this report. BSH first six-month period had two violations for oil and grease, two violations for copper and two violations for BOD. In the second six-month period BSH had Violations in Cyanide and Copper and was in SNC for BOD and oil and grease. BSH voluntarily stopped discharging until their pretreatment process has been corrected. Shamrock Environmental pumps and hauls their industrial waste. The public notice was published on January 25, 2024, and the affidavit should be sent in within 30 days. I have a copy of the publication along with the receipt for payment in the significant non-compliance report section. Fees/Fines: the facility was charged $1600.00 in administration fees, $1124.10 in sampling fees and $1927.80 in violation fees. This billing covered activities from January to December 2023, invoices were mailed out January 30, 2024, and violation fees were paid as they occurred. Coastal Regional Solid Waste Management Authority CRSWMA (Permit #0900) Permit: The permit for Coastal Regional Solid Waste Management Authority was renewed last year. The permit for Coastal Regional Solid Waste Management Authority is effective until midnight December 31, 2027. The representative for the industry is Bobby Darden, Executive Director. Compliance: The facility was inspected on 6/29/2023. Mr. Darden was present for the inspection. The facility was well managed, and records were organized. There were no violations during 2023. Fees/Fines: The facility was charged $1600.00 in administration fees and $1213.10 in sampling fees. These billing covered activities from January to December 2023, invoices were mailed out January 30, 2024. Chatsworth Products, Inc. (permit #0600) Permit: The permit for Chatsworth Products, Inc. was renewed last year. It is effective until midnight December 31, 2027. The representative for the industry is Stephanie Butz, Quality Assurance Engineer. Compliance: The facility was inspected on 7/25/2023. Ms. Stephanie Butz was present for the inspection. The facility was well managed, and records were organized. There was violations for BOD, pH and oil and grease for August, 2023. Fees/Fines: The facility was charged $1600.00 in administration fees and $11213.10 in sampling fees. These billings covered activities from January to December 2023, which were mailed out January 30, 2024. II. Significant Industrial User Information Three (3) Notices of Violations for three (3) violations were sent in 2022. A. Significant Industrial Users without violations 1. Chatsworth Products Inc., Permit#600 First six months No violations Second six months BOD Oil and Grease pH 2. Craven Solid Waste Management Authority, Permit # 0900 First six months No violations Second six months No violations 3. Craven County Wood Energy L.P. (permit # 1200) First six months No violations Second six months No violations B. Significant Industrial Users not in SNC, but in violation BSH Range, Permit # 1100 First six months Oil and Grease BOD Copper Second six month BOD Oil and Grease Cyanide Copper 2. Chatsworth Products Inc., Permit#600 First six months No violations Second six months BOD Oil and Grease pH C. Significant Industrial Users on Compliance Schedule There are no industries on compliance scheduling. D. Significant Industrial Users in Significant Non Compliance BSH Range, Permit #1100 was in SNC for the second six month period for BOD and oil and grease. E. Waste Reduction Activities a. POTW The Wastewater Treatment Plant treated approximately 1.5 billion gallons of wastewater in 2023.The monthly average flow was 126 million gallons, and the daily average was 4.133 million gallons. The plant had one violation for the calendar year of 2023. The plant exceeded its weekly ammonia nitrogen limit of 6 parts per million by 0.7 parts per million for the week of January 0 1 - January 07, 2023. The plant met all other monitoring permit requirements for 2023. The annual removal rate was greater than 99.47% for oxygen demanding pollutants or 1424 tons for the year. The average biological oxygen demand for the effluent was less than 1.0 parts per million. The annual removal rate was 100 % for total suspended solids or 18.36 tons for the year. The average annual total suspended solids for the effluent was less than 2.5 part per million. The New Bern Seven Water Reclamation Plant is an Aerated Extended aeration plant that uses the biological process to treat the waste and then disinfects using chlorine. The final treatment is a tree farm located off site. The trees use any nutrients left in the effluent to grow. The New Bern Seven plant had one fecal violation for a daily sample. This is a grab sample that exceeded the permitted daily limit. Follow-up samples were taken, which were well below the permitted daily limit. A follow-up report showed a chlorine pump malfunction. It was repaired immediately. b. The industries BSH-Dishwasher Facility (Permit #1000) is involved in the waste production activities: W13, W21, W23, W24, W31, W32, W33, W34, W36, W41, W51, W52, W54, W55, W61, W64, and W83. BSH-Range Facility (Permit #1100) is involved in the waste production activities: W24, W31, W32, W33, W34, W36, and W51. Coastal Regional Solid Waste Management Authority CRSWMA (Permit #0900) is involved in recycling tires, producing mulch from yard waste and is utilizing methane production. Chatsworth Products, Inc. (permit #0600) is involved in the waste production activities: W19 and W60. * No flow for two months. Administration Fees July -December 2023 Date Industry Perrnit#1 Event Charge Collected 1/30/2024 BSH Range 1100 Administrative fee- Monthly Review $ 600.00 1/30/2024 Chatsworth 0600 Administrative fee- Monthly Review $ 600.00 1/30/2024 CRSWAMA 0900 Administrative fee- Monthly Review $ 600.00 1/30/2024 CCWE 1200 Administrative fee- Monthly Review $ 600.00 1/30/2024 BSH Range 1100 Annual Inspection $ 100.00 1/30/2024 Chatsworth 0600 Annual Inspection $ 100.00 1/30/2024 CRSWAMA 0900 Annual Inspection $ 100.00 1/30/2024 CCWE 1200 Annual Inspection $ 100.00 POTW Sampling Charges Date Industry Permit # Fee Charge Collected 1/30/2024 BSH Range 1100 Laboratory Analysis & labor $ 478.00 1/30/2024 Chatsworth 0600 Laboratory Analysis & labor $ 417.60 1/30/2024 CRSWAMA 0900 Laboratory Analysis & labor $ 417.60 1/30/2024 CCWE 1200 Laboratory Analysis & labor $ 465.00 1/30/2024 BSH Range 1100 Travel & Labor $ 100.00 1/30/2024 Chatsworth 0600 Travel & Labor $ 249.40 1/30/2024 CRSWAMA 0900 Travel & Labor $ 249.40 1/30/2024 CCWE 1200 Travel & Labor $ 100.00 Violations January 1 - June 30, 2023 Number of NOV's Date of Violation Parameter Six Month Monitoring Review Chatsworth Products, Inc. SIU # 0600 Six Month Monitoring Review BSH Range Facility SIU 1100 1 5/12/2023 Oil and Grease 100 m /L 262 m /L 2 5/12/2023 BOD 350m /L 358 m /L 3 5/12/2023 Copper .228 m /L .418 m /L 4 6/22/2023 BOD 350 m /L 371 m /L 5 6/13/2023 1 Oil and Grease 1 100 m /L 825 m /L 6 6/22/2023 1 Copper 1.228 m /L 0.228 m /L Six Month Monitoring Review Coastal Regional Solid Waste Managemrnt Authority SIU # 0900 1 /22/2024 Violations July -December 2023 Number of Date of parameter Violations Violation Six Month Monitoring Review BSH Range Facility SIU # 1100 1 7/14/2023 BOD 350 m /L 375 m /L 2 8/21 /2023 BOD 350 m /L 642 m /L 3 8/23/2023 BOD 350 m /L 544 m /L 4 7/14/2023 Oil and Grease 100 m /L 409 m /L 5 7/25/2023 Oil and Grease 100 m /L 295 m /L 6 8/21/2023 Oil and Grease 100 m /L 518 m /L 7 8/23/2023 Oil and Grease 100 m /L 120 m /L 8 7/14/2023 Cyanide .010 m /L .041 m /L 9 17/14/20231 Copper 10.203 m /L .398 m /L Six Month Monitoring Review CRSWMA SIU # 0900 Six Month Monitoring Review Chatsworth SIU #0600 1 8/2/2023 BOD 350 mg/L 2350 mg/L 2 8/2/2023 pH 5.5-9 9.72 3 8/2/2023 Oil and Grease 100 m /L 304 m /L Six Month Monitoring Review CCWE Permit # 1200 1 /25/2024 0 U O O U a� c LL a� a� 0 0 O O M "O N 7 N M � N ii O N W 64 04 z D n a o a) Z0 o Q a o m O U U) W H J a z W IL J_ > a� m (� c c � 2 = O (j) U) m m N lV cu CD CD cu N cr) T_ 0) T 0 r O LO ICT Ill .° (D U (1) U) U) U) (/) U) U) p W W W W W W W CD c LL a) O't O d O N O 7 0 (0 O cM 0 f� O O r O Cr1 0 N 0 — O 11) O � O U') O r C7 r M r CM r c EF? Ef3 EA Efl (!-? 69 69 LL W H 0 0 0 0 J a W m ism m IL ° g °0°2> J o 0 a) a) � m j •T � _o > m o m •o m V o > m C� m> Cr10C70C� (D m �m �m m m m m O O O b m a) a� m m a) co 2 2 2 2 2 2 2 — m U) U)m(nmm m m mmmaom M M m M M M cej N N N N N N N a) 0 0 0 0 0 0 0 m N N N N N N (y Q 00�— r N N r r N N - - O - O O E& Pretreatment Performance Summary Pretreatment Program Info Database Historical SNC Report Chapter 9, PAR Guidance Pretreatment Performance Summary (PPS) 1. Pretreatment Town Name: 2. 'Primary" NPDES Number or Non Discharge Permit # if applicable => 3. PAR begin Date, please enter 01/01/yy or 07/01/yy 4. PAR end Date, please enter 06/30/yy or 12/31/yy 5. Total number of SIUs, includes CIUs 6. Number of CIUs 7. City Of New Bern NCO025348 This Column for office WQ0017635 use only EPA WENDS 1/1/2023 7/l/2023 3. _> 1 1 23 PSSD 6/30/2023 12/31//2023 4. _> 12 31 23 PSED 5. _' 4 SIUS -' Enter the Higher Numb ' h 6• 2 cros 7a. Number of SIUs not sampled by POTW er, eIt er (7a) or (7b) here => 0 NOIN 7b. Number of SIUs not inspected by POTW 7a. -> 0 8. Number of SIUs with no IUP, or with an expired IUP 7b. -> 0 9. Total Number of SIUs in SNC due to either IU Reporting violations or 8• -' 1 NOCM IUP Limit violations. To avoid double counting some SIUs Enter the Number of SIUs in SNC for: Enter ( 9a + 9b) - 9c here => 1 PSNC 9a. IU Reporting violations 9b. IUP Limit violations 9a• => 0 MSNC 9c. Both IU Reporting & Limit violations 9b• _' 2 SNPS 10. Number of SIUs in SNC due to IU Reporting violations 9c. _> 2 that were not sampled or inspected by POTW 11. Number of SIUs in SNC due to violation of 10' -> 0 sNIN Compliance Schedule due dates 11. -' 0 SSNC 12. Number NOVs, NNCs, AOs, or similar assesed to SIUs 13. Number Civil or Criminal Penalties assessed to SIUs 12. -> 18 FENF 14. Number of SIUs included in public notice 13. -' 9 JUDI 15. Number of SIUs from which penalties collected 14. - 1 SVPU 16. Total Amount of Civil Penalties Collected 15. => I RJPN 17. Total Number of SIUs on a compliance schedule 16.=: $ 1928 17. _' 0 SOCS Foot Notes: AO Administrative Order tegorical Industrial User NOV Notice of Violation nsent Order LNMNC PAR Pretreatment Annual Report ustrial User Pretreatment Permit POTW Public Operated Treatment Works ice of Non-Com Hance SRJ Significant Industrial User Chapter name: PAR Guidance File name: PAR_PPS.As Revision date: August 1, 1994 Comprehensive Guide, Chapter 9, Section B, Page 5 Blank PPS Form, Copy and use in your PAR Pretreatment Program Info Database for Program Name New Bern WWTP Name City of New Bern Program Approval Date 03/23/1988 Pretreatment Status Full Region WARO County Craven NPDES Number NC0025348 printed on: 12/22/2023 Stream Information 7 IWC % at 7Q10 3.04 7Q10 Flow cfs / mgd 320.7 / 207.17 1 Q1 0 Flow cis / mgd 259.65 / 167.81 Stream Classification SC -SW -NSW Basin Number NEU10 Receiving Stream Name NEUSE RIVER NPDES Effective Date 12/01 /2013 Last PAR Rec 02/08/2023 PAR Due Date03/01/2024 mercury NPDES Expire Date 06/30/2018 Current Fiscal 03/30/2021 7 631 required Year PCI Done POTW is Primary WWTP TRUE Last Audit on 07/16/2020 Audit Year Nexi19/20 es Design Flow mgd 6.5000 % Design WWTP SIU's Program SIUs mgd is SIU permitted 2.69 Permitted SIU flow (mgd) [Pt_SIU) .175 - -� WWTP CIU's Program CIUs HW� LTMP IWS SUO ERP date Inactive Date Next Due Date Received by DWR 08/03/2020 07/08/2015 03/31/2021 07/23/2012 02/03/2020 Date Approved 10/01/2015 06/04/2021 08/06/2012 02/05/2020 Adopt Date Required Date Adopted 12/11/2012 10/2/2001 fail to enforce+issue proper IUPs-CRSWMA flow 12/17/2001 failure to enforce-Amital changed conditions- flow DWR Central Office Contact Pretreatment Staff DWR Regional Contact IRobbie Bullock Significant Non Compliance 'Report Compliance Judgement Worksheet M N O N I I 3 ` z o 4 4 a3i O o z U y to z U v II II I 03 C3 z z o 0 0 0 U w a z ILI ti ^ Q o o Z a z � � ti o w , o 0 z z � o o � C7 � O z � bq bA a 0C) 0 0 rn cd � U o ) 64 P-i U •'yr o o O Q CZS 3 �CZ x o Z o z UD S U �. 4� z Q U � � � U o � � � b w Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC detennination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: Chatsworth 1UP Number: 600 1 Pipe Number: 01 Parameter: pH Six Month SNC Determination Period:7/1/2023 to 12/31 /2023 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC com liance'ud ment not required for )H: Daily Maximum Limit: * 1.2 or 1.4 = TRC Daily Limit: mg/1 or lbs/day Column 1: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is ( mgd * mg/l * 8.34 = lbs/day ). Column 8: Put" 1 " for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "1" if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Cone. mg/l Daily Load lbs/day Count Regular Violation ? TRC Violation 1 71612023 .0010 8.1 1 0 1 81212023 .0017 9.72 1 1 POTW 812212023 .00159 8.5 1 0 1 91612023 .002221 8.2 1 0 1 911312023 .003 8.6 1 0 1 101412023 .005508 8 1 0 1 111112023 .00022 7.7 1 0 1 121612023 .001089 8.6 1 0 List these Totals on next page => A = 8 B = 1 C= Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance-judgment--Worksheet-Chatsworth BOD july-dec 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: Chatsworth IUP Number: 600 1 Pipe Number: 01 Parameter: pH Six Month SNC Determination Period:7/l/2023 to 12/31 /2023 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION J Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = _12.5_% 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes / n 3) Daily: Calculate the % of TRC Violations: 4) Is C/A greater than or equal to 0.33 (or 33 %) ? C/A = _% Daily TRC Violator? Yes CNJo 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes No 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes / DO. 7) If the answer to anyof these questions is ryes, the SIU is in Signftcant Non -Compliance (SNC)for this para They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month Period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAM METER in the previous six mon compliance period? CIRCLE ONE: YES NO If YES to EITHER question, DESCRIBE IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance_Judgment_Worksheet_Chatsworth BOD july-dec 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use sq Karate sheets for each Pollutant SIU Name: Chatsworth IUP Number: 600 1 Pipe Number: 01 Parameter: BOD Six Month SNC Determination Period:7/l/2023 to 12/31 /2023 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliancejudgment not uired for H: Daily Maximum Limit: .350 * 1.2 or 1.4 = TRC Daily Limit: 490 mg/1 or lbs/day Column l: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is (mgd * mg/1 * 8.34 = lbs/day ). Column 8: Put "1" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "I" if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Conc. mg/1 Daily Load lbs/day Count Regular Violation TRC Violation I 71612023 .0010 299 2.49 1 0 0 I 81212023 .0017 2350 33.32 1 1 1 POTW 812212023 .00159 18 .24 1 0 0 I 91612023 .002221 23 .43 1 0 0 I 911312023 .003 2 .05 1 0 0 I 101412023 .005508 19 .87 1 0 0 I 111112023 .00022 20 .37 1 0 0 I 121612023 .001089 16 .15 1 0 0 List these Totals on next page => A = 8 TB=I C= 1 Title: SNC With Limits Compliance Judgment Worksheet File name: Complianceludgment_Worksheet Chatsworth BOD july-dec 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use sc . arate sheets for each Indus SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SILT Name: Chatsworth IUP Number: 600 Pipe Number: 01 Parameter: BOD Six Month SNC Determination Period:7/l/2023 to 12/31 /2023 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION I Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = _12.5_% 2) Is B/A greater thanor equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes /(No j 3) Daily: Calculate the % of TRC Violations: C/A = _12.5_% 4) Is C/A greater than or equal to 0.33 (or 33 %) ? Daily TRC Violator? Yes / o 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes No 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes No 7) If the answer to gU of these questions is yes, the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAM METER in the previous six month compliance ep riod? CIRCLE ONE: YES NO If YES to EITHER question, DESC IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance judgment Worksheet File name: Compliance Tudgment_Worksheet Chatsworth BOD july-dec 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Indusa SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: Chatsworth IUP Number: 600 1 Pipe Number: 01 Parameter: Oil and Grease Six Month SNC Determination Period:7/l/2023 to 12/31/2023 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for H: Daily Maximum Limit: 100 * 1.2 or 1.4 = TRC Daily Limit: 140 mg/l or lbs/day Column 1: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is ( mgd * mg/1 * 8.34 = lbs/day ). Column 8: Put "I" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "1 " if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Cone. mg/I Daily Load lbs/day Count Regular Violation TRC Violation 1 71612023 .0010 9.9 .083 1 0 0 1 81212023 .0017 304 4.31 1 1 1 POTW 812212023 .00159 11.9 .158 1 0 0 1 91612023 .002221 5.1 .094 1 0 0 1 911312023 .003 5 .125 1 0 0 1 101412023 .005508 5.6 .257 1 0 0 1 111112023 .00022 5 .009 1 0 0 1 121612023 .001089 5 .045 1 0 0 List these Totals on next page => A = 8 B = 1 C= 1 Title: SNC With Limits Compliance Judgment Worksheet File name: Complianceudgment_Worksheet_Chatsworth oil and grease july-dec 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits SNC determination for Flow optional. see sheets for each Pollutant SIU Name: Chatsworth IUP Number: 600 1 Pipe Number: 01 Parameter: Oil and Grease Six Month SNC Determination Period:7/1/2023 to 12/31 /2023 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION F Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = _12.5_% 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes / No 3) Daily: Calculate the % of TRC Violations: 4) Is C/A greater than or equal to 0.33 (or 33 %) ? C/A = —RC Violator? Yes / oNo 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes / No 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes / No 7) If the answer to any of these questions isles, the SILT is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES Ecomplianc Was the SIU in SNC for THE SAME RAMETER in the previous sixe ep riod? CIRCLE ONE: YES O If YES to EITHER question, DESCRIB IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance_Tudgment Worksheet_Chatsworth oil and grease july-dec 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC, With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use sglarate sheets for each Pollutant SIU Name: BSH Range IUP Number: 1100 1 Pipe Number: 04A Parameter: Copper Six Month SNC Determination Period: 7/l/2023 to 12/31 /2023 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliancejudgment not required for H: Daily Maximum Limit: .203 * 1.2 or 1.4 = TRC Daily Limit: .243 mg/l or lbs/day Column 1: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is ( mgd * mg/1 * 8.34 = lbs/day ). Column 8: Put "1" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "I" if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From IDMRs From 1DMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Conc. mg/1 Daily Load lbs/day Count Regular Violation TRC Violation 1 7114 .00288 .398 .0096 1 1 1 1 8121 .00436 .022 .000799 1 0 0 1 8121 .00436 .013 .00047 1 0 0 POTW 8123 .0044 .052 .0019 1 0 0 List these Totals on next page => A = 4 B = 1 C= 1 Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance,Judgment_Worksheet_BSH copper july-dec 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SILT Name: BSH Range IUP Number: 1100 1 Pipe Number: 04A Parameter: Copper Six Month SNC Determination Period: 7/l/2023 to 12/31 /2023 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = 25% 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes No 3) Daily: Calculate the % of TRC Violations: 4) Is C/A greater than or equal to 0.33 (or 33 %) ? C/A = 25% Daily TRC Violator? Yes No 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes No 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes / No 7) If the answer to 11py of these questions is }_es, the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES O Was the SIU in SNC for THE SA RAMETER in the previous six mo com fiance period? CIRCLE ONE: YES NO If YES to EITHER question, DESCIN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance judgment Worksheet File name: Compliance_ludgment Worksheet_BSH copper july-dec 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Usesepar-ate sheets for each Indusul SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: BSH Range IUP Number: 1100 =Pipe Number: 04A Parameter: Cyanide Six Month SNC Determination Period: 7/1/2023 to 12/31 /2023 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for 111: Daily Maximum Limit: .010 * 1.2 or 1.4 = TRC Daily Limit: .012 mg/1 or lbs/day Column 1: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is ( mgd * mg/l * 8.34 = lbs/day ). Column 8: Put "1" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "1 " if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Cone. mg/1 Daily Load lbs/day Count Regular Violation TRC Violation 1 7114 .00288 .041 .00098 1 1 0 1 8121 .00436 .005 .00018 1 0 0 1 8121 .00436 .010 .00036 1 0 0 POTW 8123 .0044 .005 .00018 1 0 0 List these Totals on next page => A = 4 B = 1 C= 0 Title: SNC With Limits Compliance Judgment Worksheet File name: Compliancejudgment Worksheet BSH CYANIDE JULY-DEC 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits I I Ne separate sheets for each inductry SNC determination for Flow optional. see Section 7-E Use smarate sheets for each Pollutant SIU Name: BSH Range IUP Number: 1100 1 Pipe Number: 04A Parameter: Cyanide Six Month SNC Determination Period: 7/1/2023 to 12/31 /2023 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = 25% 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes / No 3) Daily: Calculate the % of TRC Violations: 4) Is C/A greater than or equal to 0.33 (or 33 %) ? C/A = 0% Daily TRC Violator? Yes No 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes / o 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes / ' No 7) If the answer to gLny of these questions is eyes, the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES O Was the SIU in SNC for THE SAM RAMETER in the previous six month compliance ep riod? CIRCLE ONE: YES NO If YES to EITHER question, DESCR IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance —Judgment Worksheet BSH CYANIDE JULY-DEC 2023 Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use §Searate sheets for each Pollutant SILT Name: BSH Range IUP Number: 1100 Pipe Number: 04A Parameter: Oil and Grease Six Month SNC Determination Period: 7/1/2023 to 12/31/2023 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for H: Daily Maximum Limit: 100 * 1.2 or 1.4 = TRC Daily Limit: 140 mg/l or lbs/day Column 1: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is ( mgd * mg/1 * 8.34 = lbs/day ). Column 8: Put "1" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "1" if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Conc. mg/1 Daily Load lbs/day Count Regular Violation TRC Violation 1 7114 .00288 409 9.82 1 1 1 1 7125 .00652 295 16.04 1 1 1 1 8121 .00436 ERROR 1 8121 1 .00436 518 18.84 1 1 1 POTW 8123 .0044 120 4.40 1 1 1 List these Totals on next page => A = 4 B = 4 C= 4 Title: SNC With Limits Compliance Judgment Worksheet File name: Comphance,udgment Worksheet_BSH RANGE OIL AND GREASE 2023 JULY-DEC - Copy Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Indusuy SNC determination for Flow optional, see Section 7-E Use srparate sheets for each Pollutant SIU Name: BSH Range IUP Number: 1100 1 Pipe Number: 04A Parameter: Oil and Grease Six Month SNC Determination Period: 7/1/2023 to 12/31/2023 I SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION ' Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = 100% 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? (Yes No 3) Daily: Calculate the % of TRC Violations: C/A = 100% 4) Is C/A greater than or equal to 0.33 (or 33 %) ? Daily TRC Violator? Yes / No 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes No 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes No 7) If the answer to aM of these questions is Yes, the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month _Period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAME RAMETER in the previous six month compliance period? CIRCLE ONE: YES O If YES to EITHER question, DESCRIB IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual I[JP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance -Judgment Worksheet_BSH RANGE OIL AND GREASE 2023 JULY-DEC - Copy Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Tse separate sheets for each Indusin SNC determination for Flow optional, see Section 7-E SIU Name: BSH Parameter: BOD Daily Limit Compliance IUP Number: 1100 1 Pipe Number: Six Month SNC Determination Period:7/1/2023 to 12/31 /2023 Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for H: Daily Maximum Limit: .350 * 1.2 or 1.4 = TRC Daily Limit: 490 mg/1 or lbs/day Column 1: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is ( mgd * mg/l * 8.34 = lbs/day ). Column 8: Put "1" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "1 " if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From From From Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: IDMRs IDMRs IDMRs Sample Sample Daily Daily Daily Count Regular TRC Type Date Flow, Conc. mg/1 Load Violation Violation mgd lbs/day I 7114123 .00288 375 9.01 1 1 0 I 8121123 .00652 642 34.91 1 1 1 I 1 8121123 .00436 329 11.96 1 0 0 P07W 8123123 .0044 544 19.96 1 1 1 List these Totals on next page => I A = 4 Title: SNC With Limits Compliance Judgment Worksheet File name: Comphancejudgment_Worksheet_BSH RANGE BOD july-dec 2023 Revision date: 1/5/01 B=3 I C=2 Compliance Judgment Worksheet For SNC With Limits I I Use separate sheets for each Indusrn SNC determination for Flow optional. see Section 7-E Use separate sheets for each Pollutant SIU Name: BSH Range IUP Number: 1100 1 Pipe Number: 04A Parameter: BOD Six Month SNC Determination Period:7/l/2023 to 12/31 /2023 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = _75_% 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes / No 3) Daily: Calculate the % of TRC Violations: C/A = _50_% 4) Is C/A greater than or equal to 0.33 (or 33 %) ? Daily TRC Violator? Yes / No 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes / o 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes No 7) If the answer to M of these questions is }_es, the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAM RAMETER in the previous six month compliance period? CIRCLE ONE: YES NO If YES to EITHER question, DESCR IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet File name: Comphance judgment Worksheet BSH RANGE BOD july-dec 2023 Revision date: 1/5/01 SIU Name: BSH Range IUP Number: 1100 1 Pipe Number: 04A Parameter: COPPER Six Month SNC Determination Period: 1/1 /2023- 6/30/2023 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for H: Daily Maximum Limit: .203 * 1.2 or 1.4 = TRC Daily Limit: .2436 Column 1: I - Industry self P-POTW mg/1 or lbs/day Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is ( mgd * mg/l * 8.34 = lbs/day ). Column 8: Put "1" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "l" if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From From IDMRs IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Sample Daily Type Date Flow, mgd Daily Conc. mg/1 Daily Load lbs/day Count Regular Violation 7 TRC Violation 1 112512023 .0018 .124 1 N N POTW 21812023 .0019 .010 1 N N 1 21812023 .0019 .010 1 N N 1 312412023 .021 .010 1 N N 1 412512023 .0015 .010 1 N N 1 511012023 .0015 .418 1 Y Y 1 612212023 1 .00134 .228 I Y N 1 611312023 .0017 .149 1 N N List these Totals on next page => A = 8 B = 2 C=1 Title: SNC With Limits Compliance Judgment Worksheet File name: Complianceudgment Worksheet BSH RANGE COPPER Revision date. 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use s: ; crate sheets for each Pollutant J SILT Name: BSH Ramie IUP Number: 1100 1 Pioe Number: 04A Parameter: COPPER Six Month SNC Determination Period: 1/ 1 /2023- 6/30/2023 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = _25_% 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes 3) Daily: Calculate the % of TRC Violations: C/A = —RC Violator? Yes / o 5) Did any violation, alone or in combination with other discharges, cause pass -through f"� or interference at the POTW, or endanger the health of POTW workers or the public? Yes / (N )) )J 6) Did any violation cause imminent endangerment to human health / welfare or to the �� environment or has resulted in the POTW s exercise of its emergency authority to halt or prevent such discharge? Yes / 15 7) If the answer to gLny of these questions is yes, the SILT is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAM METER in the previous six compliance en riod? CIRCLE ONE: YES O If YES to EITHER question, DESCR IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance -judgment Worksheet BSH RANGE COPPER Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industrt SNC determination for Flow optional see Section 7-E Use separate sheets for each Pollutant SIU Name: BSH Range 1UP Number: 1100 Pipe Number: 04A Parameter: Oil and Grease Six Month SNC Determination Period: l/l/2023- 6/30/2023 Daily Limit Com liance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for H: Daily Maximum Limit: 100 * 1.2 -or 1.4_ = TRC Daily Limit: 140 mg/l or Ibs/day Column 1: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is (mgd * mg/1 * 8.34 = Ibs/day ). Column 8: Put "1 " for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "1" if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. I: From From 1DMRs IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Sample Daily Type Date Flow, mgd Daily Conc. mg/1 Daily Load lbs/day Count Regular Violation TRC Violation 1 112512023 .0018 20 1 1 N N POTW 21812023 .0019 5 1 N N 1 21812023 .0019 5 1 N N 1 312412023 .021 5 1 N N 1 412512023 .0015 20 1 N N 1 511212023 .0015 262 1 y y 1 61112023 .0013 5 1 N N 1 611312023 .00174 825 1 y y List these Totals on next page => A = 8 B =2 C= 2 Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance_Iudgment Worksheet_BSH RANGE OIL AND GREASE Revision date: 1/5/01 Compliance Judgment Workshect For SNC With Limits Use se crate sheets for each Indust SNC determination for Flow o tional see Section 7-E Use se arate sheets for SIU Name: BSH Range IUP Number: 1100 Pi e Number: 04A Parameter: Oil and Grease Six Month SNC Determination Period:l/1/2023- SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION 1) Daily: Calculate the % of Regular violations: 2) Is B/A greater than or equal to 0.66 (or 66 %) ? 3) Daily: Calculate the % of TRC Violations: 4) Is C/A greater than or equal to 0.33 (or 33 %) ? Calculate % and Circle Answers B/A = 25% Daily Chronic violator? Yes / No C/A = 25% Daily TRC Violator? Yes / No 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes / No 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes / o 7) If the answer to of these questions is yes, the S1U is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six monthPeriod? CIRCLE ONE: YES NO Was the SIU in SNC for THE SA IAMETER in the previous six compliance Period? CIRCLE ONE: YES O If YES to EITHER question, DESC IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet File name: Compliance_ judgment Worksheet BSH RANGE OIL AND GREASE Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: BSH Range IUP Number: 1100 I.Pi e Number: 04A Parameter: BOD Six Month SNC Determination Period:l/l/2023- 6/30/2023 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from lUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for H: Daily Maximum Limit: .350 * 1.2 or 1.4 = TRC Daily Limit: 490 mg/l or lbs/day Column 1: I - Industry self P-POTW Column 6: Use only if IUP has daily limits in lbs/day. Formula to use is ( mgd * mg/l * 8.34 = lbs/day ). Column 8: Put "1" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "I" if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Conc. mg/1 Daily Load lbs/day Count Regular Violation TRC Violation 1 112512023 .0018 148 1 N N POTW 21812023 .0019 2 1 N N 1 21812023 .0019 2 1 N N 1 312412023 .021 2 1 N N 1 412512023 .0015 120 1 1 N N 1 511212023 .00154 358 1 Y N 1 612212023 .00134 371 1 Y N 1 611312023 .00174 38 1 N N List these Totals on next page => A = 8 B = 2 C= 0 Title: SNC With Limits Compliance Judgment Worksheet File name: Comphance,Judgment Worksheet BSH RANGE BOD Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E SfU Name: BSH Range IUP Number: 1100 1 PiPe Number: 04A Parameter: BOD Six Month SNC Determination Period: 1/1/2023- 6/30/2023 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION Calculate % and Circle Answers 1) Daily: Calculate the % of Regular violations: B/A = _25_% 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes / No 3) Daily: Calculate the % of TRC Violations: C/A = _0_% 4) Is C/A greater than or equal to 0.33 (or 33 %) ? Daily TRC Violator? Yes / No 5) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes / No 6) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes / No 7) If the answer to �!ny of these questions is }_es, the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAME PARAMETER in the previous six month com liance eriod? CIRCLE ONE: YES NO If YES to EITHER question, DESCRIBE IN NARRATIVE. Please note if SILT was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria = 1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet File name: Comphance,Iudgment Worksheet BSH RANGE BOD Revision date: 1/5/01 Firefox https://paxton.admanagerpro.com:8360/AMPWeb/Temporarvltems/, NOTICE IN CONNECTION WITH WASTEWATER PRETREATMENT REG 1ULA'I'IONS The City of New Bern, in ac- cordancc with the Federal and State Regulations, is hereby giv- en Public Notice. Listed below are significant industrial users that were in significant noncom- pliance with National Regula- tions 40 CFR Par 403, State We - treatment Regulations 15 NCAC2WO900 or Local Pre- treatment Regulations in the past 12 months. ,Fist Six- M.O. thPe iod — ilanniz - ->.uFte 2_023 Industrial User Permit No. Viol- ation None SEu, _md Six-hlon�h Perin d — JulX — DM -ether 2023 Industrial [Jeer Permii No, Viol- ation BSH-Range 1100 Oil & Grease BSH- Range 1100 BOD Notices of Violation were sent to each industry. The industries are making and continuing effort to achieve compliance. No adverse effects were observed at the City of New Bern Wastewater Treat- ment Plant. This the 20th day of January 2024, Jordan Hughes, Director of Wa- ter Resources City of New Bern January 25, 2024 2 of 2 1/19/24, 11:55 AN Firefox https: //paxton.admanagerpro-com:8360/AMPWeb/Temporaryltems/ Paxton Media Group 201 South 4th Street Paducah, KY 42003 Reva Cox-(176-New Bern) City of New Bern -Water Resources 527 NC Hwy 55 W New Bern , NC 28562 (252)639-7541 Class Liner Ad #70871446 Summary: Slug Line: NOTICE IN CONNECTION WITH WAST Size: 1.00 x 4.84 Publication Cost $101.20 Adjustments $0.00 Net Cost $101.20 Prepaid Amount $0.00 Amount Due $101.20 Order Detail. Publication Start i Stop - - - 176NBND1 New Bern Sun Journal [l/2�5/24 1/25/24 176NBNI1 New Bern Sun Journal 1/25/24 1/25/24 Internet Insertions i� Cost' Adjustments �� Total 1 101.20 0.00 + 101.20 y l I F0.00 j z 0.00 � 0.00 l of 2 1/19/24, 11:55 AM Industrial Data: Sd m. m- ury Forms, (IDSF): It w 00 iF dF 9F iF dE 9E iF 9E -1F dF dF iF o C o C o C � o• y o• � o. O^ O^ O^ O n O O M A .1 0 O O O C O C � I O Vn cD O Vn cD p Ocn 0 a O a/ O� Zzr> k �zrax �zr� Ix" 17' O.: w G C O � �' o. w G O w w' (a.w C O V �cD V m w w II V w II ova W rn 6' CT 'C II II U4 W ca0o OQ w W Q 0 o a `m a 'JQ CL a co II II II II V V V V II II II V V V II II II II V V V V II II II V V V II II II II II II II V V V V V V V 0 0 O O 0, 0 0 fD 00 O O 00 U 00 ? W U oo �l 4� a\ O 0 O 0 0 NO C) J 00 - 00 N CA — O U U �• A ? W 00 y ee o o 0 � 00 N - M N w O w J LA %A � CA 00 � O cA — .-� 00 a 0 o o �- _� O O W N N N U Do U O •P C 00 --A! i ! 0 0 0 0 O N W zr �l 00 000 W 01 A W ON\ 0000 W QM n z 0 0 N `. O r! N W 00 r r r O O o �I r CD CD �. n IDCD d A r CD w a wo � � b N d N b w w w r+ CCD CD O k CD CD . v v v v v CD `GT '4n N N CD Z W W OC O O CD w o KJ C N N O O N W W 9 mz`z n� d v v v v "n 5 tz 7 as rL 'fit rFi. O 5.f CD N 0 ro O O O On On O O��s � O�s � o rn o n Hy p (CD O n O cCo O n V] �C. 11) y IQ 4 o .ny �/ L- (A a Oy ^ 7 y C/] r� O .4 �� >= �zo ono a� o c 0 �' a. a O U V rn O� o' p 7 p 11 a\ C a,'rJ 0� � C '[3 0 0 �bQ ���UQ` �U= u u ii u u ii n v v v v v v v ii ii u n u u ii v v v v v v v u u u u u u u v v v v v v v 0 0 0. o o 0 0 00 N 00 N N 00 O� 0 OO in A (.A (n � N O O p W ~ A W O O m N N W N N �0 00 cn t/i N Cl 00 C C> O J cn N 1 tli � J 0 0 0 cn to oo �O o 00 o0 f�D O O R C3 O O ~ w 00 00 � � t1i (h 00 00 11i i--� 00 �n w :H: CD 0 v v v v v c� 0 0 CD W W O O fD W O N O O N It ao 0. C ryry a o � C CD o CD c a 0 o�R CDCD d y < y o' O y cn ax 11 ��° w�^^ a �Q � D v v v v v v v o ° C � m C, y O � o � l . o R 4 o r CL o w ^ �' v v v v v v v b CD +o 0 0 w ao N W h� 0 0 coo 5' C C 0 a co O O_ l O y O CD rn° z Y z z C" Y k z z CO > w cL CD CD W T^^^^ W ^^—UQ Oro 112 CD �. II II II II II II II II II II II II II II II II II II II II II V V V V V V V V V V V V V V V V V V V V V n�cr - vvv .q CA 13 0o rn � o C m � 0 ° 0 o O O O p p tA � o 00 C� 0) n N ►- U N O\ U N 00 00 tJ O� C� i t O O O O 0 0 CD O0 00 w Z. �O A U 00 0 c o 0 0 O O A � N 0 0 O O on c.n rn n J Do p (-A A v '» �. v C o 0 o w U n U m U U U C� 00 U U U U I• 0 I' 0 0 0 0 0 0 0 0 w n w U-I w Vi A � K K y O O n N N 0 � �, U N '••' N p N v, r•- N v7 00 U O\ W U r-. G 00 00 O h-N r b a K q�S CD h3 Fq, w C7 a e-P. coo m n 4,11 S O d It ti 0 o .C. y O• C] C• O O �n I<D n Or CCD X k m rL W O V i S• w `ro `ro V V V V V V V 0 o � y O. � O• C � O ti ra Off��-a++ �y 0 zzra,�E 0 0 C C'' n • CL pni G C O I m a w �. V V V V V V V C) O OR 44 zzr> V V V V V V V 00 O C> O W , O O O O ram. � 1 Vi N tQl Cn F I C O.� p O O 00 O O O O W? 4CA 0 O A O O o o W O rA r t r o 0 0 c c N O O <p CA O A9 r� a F O O CD O O y "►.S O O Cn N O O O O W O �A _;A W p Q A Piz r s b 'C CD O N A� It w ao N w O M C o C o C O C C O �o o -t o A� ti o >14 m CD O y O n p rn CA A OR, O 4 '9 C' ( I a Z(z ar^�k zz o � a o zzo w o CD � w'aw � 0 p a>w, ,v W V ac CD p, 1 II ao CD rn C C II ao Duj y w cr aOroCA o o a° ate° co on II �� II II II II II v v v v v v v II II II II v v v v �� II II v v v II II II II II II II v v v v v v v 0 o --A r 00 w i O O O O 00 w O O O v VUi 0000 - 4 00 'A J J 00 00 �1 i r CD 0 c ' O O O O y ►t N O i 00 �- o o y m � � O O �O DD J Cn Vi J r-. O l C r"3 F � O O O O LA O �7 cn QA O O 00 N a1 -A. F• 0 OO `"�-''OtA LLL EU W --1 CD A CD p7 a0i � ram., b CD d cr, � N � O" ON CC O l ^O d d Nz yyz CAD CD El R '� m CD O v v v v v CD [D M v CD N N O O CD O O .-.. 01, Oc _W O N O O `[J W y O � T ° o o o .. o m l 0 OH n o o > e 5•7.a.`C° a o w ii y � y o' c � o' O A O m R v v v v v v v y o' c � a• O � ccu o w �C[R- J v v v v v v v a a - z ztt CD O O m m CD 3 v m y 6 N r w A i 0 3 CD 0 cD m m O 'a N p1 N a go 0 0 u co N O � O � O n w w °m x n 90 M mm 3 o �ZI ai �m y O 0 3 3 1D C. (D s cQ n S 3 O O lD 3 3 ,0. 3 C) 0 m c °D x 3 a N O N o r' w � rn �i 0o Q C 1 S A CD (n m r m v D � N N W W W N _ry :3 C77 n 0 n==sr- 3 < m T n O �. co � o = C c A z D m � nNOC 0 ti, -u. D r CA) *g o ^ o ^ Z C o no N Z „ C � A 0 a 6�n x irID A OA (3) Z ��co to �, a' m a � D C C CD m m v m' 3 N iD m N v 0 v CD La 0 0 11 / \ � a \ CD (D § 2 C� CD 0 _ 7 CD % / \ ® 7 ¢ ƒ 2 § E @ n o & 2n — \ A) \ �2 / E P 2 k CL / / — ■- 3 c 2 2 2 k �7§§ § \ / v ��■ m n �■ m k ) E BC �\(D » � �I /(D CL CL 3 o n \ ) I 2 G E A v E & 2 ■ � 2 J a ] Eg g 7CD > � U � g m @ o 0) M � a ■ 2 r M0 k2 EE R� .. � & 2§2 Rk o 303 P>(A 2 §mCL G -kƒ PCL0k�� k /k� \iM � J 2 , ƒ7 0 A 0 2 V \ k =ƒ E \� @ N. _ k o §»2§ F k 0\/3 a 3 co } m §} / �0 k@ ) _§ ° \ 0 CD 3 G / �c 0 co § E k :3 i J \ \ � \ \ N3 ■;_ Z ;a �(} lOr GE 3 �} 2 / CD k E E \0 $) 2 / »m / 9 0 E z \ »§ k 2 / \ 0 n o } to !� \m 0 § m g � 0 cr U) E § g § 0 X � � f § ] k ) U) co is m T _ CD 3 c 0 3 � � w w o v :3 a n�i m � a K 0 3 6)o ;:w v _, -- �� m c co a 3 frt _W 4 w = n Qmm 3 m Z P7 o co OW T o w M 4 a c = (D r r" :3 CD W 0 Z O'� 3 W n w O �LUC W y � m 0 2 p -m p� D ^o—cnr " W c D rm#f)o N p) o-oZ O C3yz0 r. `t m v' c > j� rL C.) O'CL T ON7TA CL o ,,, P Ln 13 Q. m D� D cc) m m Z m o 13) y. w 3 co w p n v 0 co v Q r1 O 0 O_ Z (D a) CD a p O N O N w / \ | ± 3 k ] E c 7 2 § (D ® / K k § / J 3 M 3 A)C @ . K 20 ® 0 3 ■ i .2 E (D 0 2 ƒ § / � LZ # M 2 \ Z 0) / 0 � \ 9 I "/� (� an �s . k rA a � c ■ q B � k \ A ƒ:r E ' £° f > ■ m m / -q m ¥ 7 ■ cr CD \ / / ; ) PB'0 4 0 d 0 k /0 m A o133 k)k� \« 2 \ ��\ \ 0 m #A §] a k\k 7D 7 A CLk2 11 10 c igk k2� § / ■ \ \ ]2 G fu «3 CD EE § CD 6E § \ � #'D 7® 3 a w� - / i& ° -- a .° �P t� o 0 \ # / N � 9 ■■In 0m _ O z D Zch . E E 20 / 22 I F< 2> o _\ 0 m a ƒ 2 / m � E _m § k e ■ 2 N § 2 / 2> _m Production Records S W a s Vi W O IA d C 3 yy ro m o C CO O y n A � n y mF tQo arAs s r � rna bC7� $ Leo 4 �o <tl Vl� 9 m m o m m `. w rn 49 0 0 o a n Co vwi 'i7 '�'f '�] a o 0 0 `d 3 �e `m� ° G�] G] o o n v7 r`°i, m CJ C7 �' Ci 4] C' °o O7 s G d z 3k ii C7 w m II II II II II II II II II II II II II c�c ci O O N o rN G (A ON A A N p z J ci tz cn O T x > ^1 In D Z Q o' i; a F � se O 0 roEa y N r 0 o' y 0 D\ N N N w w� •+ O w ya � u0 P�'7 + k k k k k a� m 0 O to G E C AW v N C O — N D39N.o d ° ;nos 6Qd D� CCgs m m CCD N N 0 o CDm m D a a N m m J O. f f0 f N N. ��'mxnomcocc' O (D D N y N N C. ID 3 JO ry wxf/1 _J. J ° N O N 3<DoomD� `� IDH rJ-C >•y O O. (D 3 ID ID 0 H O. fD S N 0 ° J ° m s O D m m do y m 3 --1 2 a m O J° J S o- N J x _ Y. m FL rn m = C J ..>m CD >T°^ A CD D1 D J W m G O V C J' y 0 D y Z fD O N ° 0 m2. D w^ m m W no' m' J 9C1 ( • O O NO 31 D ^. N fD CL D C N !D � � N o y m m o J CD m J O 7 p p CD�3 w m DI cn N '�' •e A A A a H m IV7Zg p '� 0 0 6' c,' o rn w a �o o :T w R > O C7 e � m A� o N� O O C O O O O O m 0Q7 3 a a w a w w w w w d w N G y rt to to m m W m w w Vp a9 ,g m n m ? rn o a A n � O m N N N N N N N N N N N N N N C A A 'O n a.i pp 6 N N W .- v � p � O p� W •Q� 000 ] � W C, � P, 1'� C, � 1 a a a c c A C tD w fD <O f0 (O (O D7 W Do OD Co O) QD O O co V V V N A W N O O C. V () N A W N O (O W V O. A W N O cO CO V n n n C) a a H ca e = 0 0 d a m � m m s b N s � y O o a s1 ... .cNn � ... o'Po .• o m > z n r rr r Frroorrr a�'�a, � Qw = rs two F 7 n � =Q � 5= � n n o: m A a �^ ao o. m a 'e o O t 2 a a s a a a a a a a M � e° S o''o' o o' o' m z r i■ i ;� CD a m (D O CD O. Od N O ? q. T 7 N y O' N � N c=c 00 G D ri m D a m x D W W W N N N N N N N N N N: !:: O O O O W N O f0 V O U1 A W N O O] �I 0 UI A W N O <o cov O) b yn- —7Na��nz �"nnnanaa—l0 w 2. C a'tiz C��2 rn � G� ❑ °' w o 0 � D n m 3 R w 2 tJi� O r A O O U J o0 O A O U U � 7 a�a N F a rt A U A oo r b b� y 6 m v mn v n n o A rA m A PAS `a � T e a a � �o �e n w 3 � �ar O O O J O O 8 ._. Rw �n ON A O N lA D• tin J N �O w N o00 � 00 ... m � r �� 9 3 QO w w � n Q�aO w r e a rye `w v�rn�o � an�'i yo,y3 A .aAON U a\ d\ J V N a0 Z, n �� O w y H H m a aia a as rn m 2 �• E a as a ro asa A w r v CD o <, n N N O N 7 O. 0 m (D N� T n N m O' m 2 a m OI N = OD > D c m chi m D CD X D O O Vt Vta coW N CT �a(T5816 0 A CO A V A CA AAA CON> A O W W (O CO W W V M W 0 W A O ge acn o a a r e E � m A a� 3 4�4�4�nGl7 000 0; n C A� m a Q �l OAi i7l 61 W A A 00 OAi A N V 6 a as a aaaaaaa a a �a a add���ra W N N N O T OAO VUi ?� �O A p 3 vw��n m a � n n Y a a a s 5 3 _. a. 2. 3: x x 3: 0 5' 5' 5' c o 0 0 o ao A A Spa O+ W A c�c�c�c�r dac�c�c��c�c�aac�nc�vvd a ac.c �acc� aa�,�acc q y�,3 o c c d R r o as A r C O Q O O W wZ W CD D N O N O 1 N S 0 m rt Z �1 �D D D 90) m o <, a v fD O (D 7 n v� m , �s �a m � cn N = C. D G) c fu CL m D m a x D wao(A CP A W U) j 0 0 V V (O co V V� M V U1 V V A W V �CDwm N O (D 00 V mmrnrn T N A Wcn rnrn N w ry� O x d T o o N n z o F on n m 9 y o O Z 0 E m m araa� c V 0 O O 0 O v O m CCC) 0C) C`) t 7 G I u D I, j� 0 q C) LA 0 y C) 9 9 C) M C) t7 t7 O G C6 G� � w C" a3 G V] G� VJ !p VJ G 4 v� rn cn q3 qy q9 A K y e n 5y o d d e o' � o' o m S =q o� 3 � _ A A o 0 0 0 0 0 0 0 o a N �O w i In r tr l.n Oa Oo to _ e m o- .OAi �l �O O� Q+ .-• Q� w w O O� Q� r T W 10 �O rl 4 O A oo G O y c Epp A O V A Vi Oo A U O W 00 m S. 7 A O b b �l O N w p� iDOho �Vn d ao e m e _ 2. ro a°o y r r I v m a w 0 N O N A 0 O O CDT O