Loading...
HomeMy WebLinkAboutNCC230412_NOT Closeout Documents_20240207 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Duplin Project: Farrior Park at Boney Mill Pond River basin: Cape Fear Person financially responsible:Town of Wallace-Rod Fritz,Planning Director Project#: DUPLI-2022-009 Address: 316 E.Murray St,Wallace,NC 28466 1. Project Location: Rose Ave,Wallace Pictures: No 2. Weather and soil conditions: 50s cloudy Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): rod fritz Title: Inspection report: Sent Report Date given/sent: February 06,2024 9. Corrective action needed: 10. Comments: File closed. Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Brian Lambe Others present: Date of inspection: February 06,2024 Time arriving on site: 1:00 PM Time leaving site: 1:10 PM cc: