HomeMy WebLinkAboutNCC240390_ESC Approval Submitted_20240212 Dennis Gilbert
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Friday, February 09, 2024 11:31 AM
To: Moorman, Kizer& Reitzel, Inc.; Sikes, Jay; Dream Finders Homes, LLC
Cc: Britt, Lori
Subject: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0103030
Attachments: Certificate of Approval - Friday, February 9, 2024 1129 AM.docx
`✓ MAY xo,rii$
11:4'..).,,,',.'..),,''A
eeit
41
l , `r... a,aa sh
" i f; 4
...?- .07 '"--i 0,
,,.ess `J2 I77 �1
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
02-09-2024
Dream Finders Homes, LLC
3709 Raeford Road, Suite 200
Fayetteville, NC 28304
RE: Project Name: The Manors at Lexington Plantation, Part 2C Lots 742 and Part D2 Lots 687, 689&690
Acres Approved: 1.57
Application ID: PA-002721
Permit Number: HARNE-2024-0113
Address: Bow Common Way
i
City: Anderson Creek Township
County: Harnett
River Basin: Cape Fear
Stream Classification: C: Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Type: New Plan
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed on the attached page. The Certificate of Approval must be posted at the job site. This plan approval shall expire
three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form
is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit
fee.After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO
form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. TheeNOlform may be accessed atdeq.nc.gov/NCG01. Please direct questions about theeNOlform
totheStormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
2
Modifications Required for Approval:
*Correct the Narrative- Construction Schedule (12) - "A$100 annual general permit fee." The correct fee amount is $120.
*Correct Plans Page 1-Construction Schedule (12) - "A$100 annual general permit fee."The correct fee amount is $120.
Corrected pages are not necessary. Land-disturbing activities can commence.
Your cooperation is appreciated.
Sincerely,
Kelly Jonas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
North CarolianDiepartment of Environmental Quality I Division of Energy,
,, Mineral andd Resources
Fayetteville onal Office 225 Green Street, Suite 714 I Fayetteville NC,
c 28301-5095
D
910-433-3300
Dtpar rntrt of ba..ac..,4 tab Qualay
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official
3