Loading...
HomeMy WebLinkAbout20150981 Ver 1_Approval Letter_20151012Pat McCrory Governor North Carolina Department of Environmental Quality Donald R. van der Vaart Secretary October 12, 2015 Rockingham County NCDw'K Project No. 20150931 Bridge 191 on SR 2337 WBS No. 17BP.7.R.30 APPROVAL of 401 WATER QUALITY CERTIFICATION, with ADDITIONAL CONDIT[ONS Mr. J.M. Mills, P.E., Division Engineer NCDOT, Division 7 P.O. Box 14996 Greensboro, NC Dear Mr. Mills: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of Bridge 191 over Jacobs Creek (Stream Index No. 22-32-0.5) with another bridge in Rockingham County: Site Site 1 ( SA Stream 1 Permanent Fill in Intermittent Stream (�inear ft) 56 � Total � 56 Total Stream Impact for Project: 56 linear feet. in the Roanoke Rivcr Basin Total Stream Impact (linear ft) 56 56 Stream Impacts Requiring Mitigation (linear ft) The project shall be constructed in accordance with your application dated received September 22, 2015. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3883. This certification corresponds to the (Nationwide/General) Permit 3 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Qischarge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 pennit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. [f total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed I50 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7j. For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Condition(s) of Certification: Project Specific Conditions 1. The post-construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. [15A NCAC 02H .0506(b)(2)] 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-63001 Internet: www.nctlenr.gov An Equal Opportunity 1 Affrmative Action Employer 2. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be accomplished in strict compliance with the most recent version ofNCDOT's Best Management Practices for Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 3. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer lo the most current version of Stormwater Best Management Practices. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 4. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction methods. More specifically, jetting or other methods of pile driving are prohibited without prior written appraval from the NCDWR first. [15A NCAC 02H.0506(b)(2)] 5. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface �vaters. This water shall be captured, treated, and disposed of properly. [15A NCAC 02H .0506(b)(3)] General Conditions Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of ' culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. [15A NCAC 02H.0506(b)(2)] 2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200] 3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 4. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)] 5. The use of rip-rap above the Normal High Water Mark shal) be minimized. Any rip-rap placed for s±ream stabilization shall be placed �n stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC 02H.0506(b)(2)] 6. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (�)(2)] • 7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual sucn as sandbags, rock berms, cofferdams and omer diversion structures shal{ be used to prevent excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)] 8. Heary eGuipment shall be operated from the �anks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)] 9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 10. No rock, sand or other materials shall be dredged from the stream channel except w}iere authorized by this certification. [15A NCAC 02H.0506(b)(3)] I I. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to suriace waters is prohibited. [ 1 SA NCAC G2H.0506(bj(3 j] 12. The permittee and its authorized agents shal! conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, ar that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 14. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] I5. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 1F�. The issuance ofthis certification does not exempt the Permittee from complying with any and all statutes, ri�les, !'eQU�STions, or ordinances tha± may bP �m�esed by other government a��_r.cies �i.�. !ocal, state; ard tederal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 17. The Per►nittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 18. Unon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer (or appointee} shall complete and return the enclosed "Certification of Completion Form" ta notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl] 19. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by tne end of the growing season following completion of construction. [15A NCAC 02H.0506(b)(3)] 20. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities.[ 15A NCAC 02H.0506(b)(3) and (c)(3)] 21. Erosion and sediment control practices must be in full compliance,with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards �iSA NCAC U2H.0505(bj�3) a7d (c)(3]j: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent v�rsion of the North Carolrna Sediment and Frosion Contro! Planning and Design lLlanunl. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the'most recent version of the North Carolina Surface Mining Manual. d. Tne reclamation measures and implementation must comply with the reclamaiion in accordance with the requirements of the Sedimentation Pollution Control Act. 22. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of B:OOam.and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A��py ofthe �e*itio:? mus± a!se be cvrved an DEQ as fellows: Mr. Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean ��Jater Act. If you have any questions, please contact Dave Wanucha at (336) 771-9703 or dave.wanucha@ncdenr.gov. Sincerely, n �'�/7+---/ c�' � � S. Jay immerman, irector Division of Water Resources Electronic copy only distribution: Dave Bailey, US Army Corps of Engineers, Raleigh Field Office Jerry Parker, Division 7 Environmental Officer Nicole Thompson, Division 7 Environmental Officer Assistant Travis Wilson, NC Wildlife Resources Commission File Copy , North Carolina Department of Environmental Quality Pat McCrory Governor NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: co�nty: Donald R. van der Vaart Secretary Certificate ef Completion , Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. [t is not necessary to send certificates from all of these. Applicant's Certifieation I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and " specifications, and other supporting materials. Signature: Date: AgenYs Certifz�ation 1, , hereby state that, to the best of m;� abilities, due care and di�iDence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: E�rgineer's Certification Partial Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specificafions, and other supporting materials. Signature Date Registratior. No. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-63001 Internet: www.ncdenr.gov An Equal Opportunity 1 Affrmative Action Employer