HomeMy WebLinkAbout20001195 Ver 15_Staff Comments_20150914From: Johnson, Alan
Sent: Monday, September 14, 2015 11:17 AM
To: 8urdette, Jennifer a
Subject: FVV: Traffic Control Tower
Attachments: AE[OK4 Letter to N[DVVR [LTAT[T 0 ll l5.pdf
Went tothe site. Attached are the comments | requested. Streams are upper headwater area. Channel may be more an
issue of SW runoff. Definitely intermittent.
6o ahead and issue.
Securityconcernsandsite|inesareamajorissueindesign(avoidance|imitations)
Alan
From: Benton, Charles [maiKo:charlesbenton@aecom.onm]
Sent: Friday, September 11, 2015 4:01 PM
To: ]ohnson,Alan
Cm: Burdette,]ennifera; Crysta|.CAmsch|er@usace.army.mi|
Subject: RE: Traffic Control Tower
Alan,
Please find attached a letter and supporting figure with the information you requested. Essentially, we've presented
several security constraints that prevent further reconfiguration of the site layout. We've also noted some additional site
constraints that were considered during the design of this facility.
I will send a hard copy as well. I have an electronic copy of the Airport Layout Plan, but the most I can reduce the size to is
17MB. Please let me know if you are able to receive a file this size via email.
Please let me know if you have any questions regarding this information.
9MM
Charlie Benton.PWG
Natural Environment Lead I Senior Project Manager
D 1-919-461-1435 C 1-919-946-3122
AECOM
16-0-0- Perimeter Park Drive Suite 400
www.a000m.00m
AECOM and URS have joined together as one company. Learn more.
From:]ohnson Alan [nlai Ito: kan.iohnson(d)ncdencoovl
Sent: Tuesday, September O8, 2015 11:08 AM
To: Benton, Charles
Subject: Traffic Control Tower