October 12, 2015
Ms. Lori Beckwith
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
Subject: Nationwide Permit #3
Bridge 110014, SR 1746 Cub Creek Circle
State Project No. 17BP.13.R.150
Burke County, NC
Dear Ms. Beckwith:
NICHOLASJ.TBNNYSON
SECRF.TARY
I have enclosed a set of plans, a PCN application for NWP #3, and a vicinity map relative
to the proposed bridge replacement project on SR 1746 Cub Creek Circle in Burke
County, NC.
We propose to replace the existing 25 feet 9 inches long by 19 feet wide bridge with a 45
feet long by 24 feet wide single-span bridge. Sixty linear feet (LF) of an unnamed
tributary (UT) to Cub Creek will be filled and relocated into a new 76 LF long channel.
Bank stabilization at the existing confluence of Cub Creek and its UT will result in
permanent impact to 3 LF of Cub Creek. Temporary impacts to 10 LF of Cub Creek are
due to temporary dewatering while a 6 inch waterline is trenched under the streambed in a
new location. Upstream of the current bridge the stream is approximately 10-12 feet wide
and 2 inches deep. The substrate is predominately sand and gravel; riprap is present at
the current waterline crossing. Downstream of the bridge the stream is 6 feet wide and 10
inches deep with a bedrock and sand substrate. It is classified as Class C. The UT is
approximately 2 feet wide and 3 inches deep with a sand substrate.
Existing channel morphology will be maintained upstream and downstream of the bridge.
Riparian vegetation will be reestablished along disturbed areas associated with the
project. Stormwater will be diverted through grass-lined ditches or vegetated buffers
prior to entering streams. See the Stormwater Management Plan included in the attached
documents.
Division Thirteen OEfice Post Office Box 3279 Asheville, NC 28802
Phone:828/251-6171 Office ofthe Division Engineer Fax:828/251-6709
www. ncdotgov/doh/operations/divisionl3
Ms. Lori Beckwith
Page —2 Bridge 110014, Burke County
October 12, 2015
This project may affect, but is not likely to adversely affect the northern long-eared bat
(Myotis septentrionalis) (NLEB). Trees composing potentially suitable summer roosting
habitat for the NLEB are present. Tree clearing will be required and performed outside of
the annual moratorium. The existing bridge is constructed of creosote-treated timbers.
The crown to bed measurement (distance from travel surface to streambed) is 8 feet.
Clearance between the bottom of the bridge and the stream surface would be
approximately 6 feet. Marella Buncick of US Fish and Wildlife Service is copied on the
application for review. No effect on the remaining county list of federally protected
species (threatened or endangered) or designated critical habitat will occur.
As a part of the 401 Certification process, the project was processed through the DOT
Programmatic Agreement for Minor Project as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121-12(a). No Historic Resources will be
affected.
By copy of this letter, we request Marla Chambers, North Carolina Wildlife Resources
Commission Western Region Coordinator, to comment directly to the Corps concerning
the permit request.
By copy of this letter, we are asking the Area Roadside Field Operations Engineer, to
comment on the above project. Cub Creek is classified as Class C. The project will not
require a trout buffer variance.
By copy of this letter, I am forwarding one electronic copy of the application package to
Kristi Lynn Carpenter, NC Division of Water Quality, Transportation Permitting Unit
with cc to Kevin Barnett, NC DWQ Asheville Regional Office for review and comment.
Please charge the application fee of $240.00 to WBS element # 17BP.13.R.150. Please
forward comments directly to the Corps with copy to Division 13 Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6171.
Sincerely,
,��,�. a �'�,�
Roger D. Bryan
Division 13 Environmental Officer
Enclosures
cc: J.J. Swain, Jr., P.E.
Kristi Lynn Carpenter
Kevin Barnett
Marla Chambers
Marella Buncick
Ben DeWit, CPESC
Jamie Lancaster, P.E.
Corps Submittal Cover Sheet
Please provide the following info:
1. Project Name: Bridge 110014, SR 1746
2. Name of Property Owner/Applicant: NC DOT
3. Name of ConsultanUAgent:
*Agent authorization needs to be attached.
4. Related/Previous Action ID number(s):
5. Site Address: N/A
6. Subdivision Name:
7. City: Valdese
8. County: Burke
9. Lat: 35.6981802 Long: -81.5310177 (Decimal Degrees Please )
] 0. Quadrangle Name: Valdese
I 1. Waterway: Cub Creek; UT to Cub Creek
12. Watershed: Catawba River
13. Requested Action:
X Nationwide Permit # 3
General Permit #
Jurisdictional Determination Request
Pre-Application Request
The following information will be completed by Corps office:
AID:
Prepare File Folder Assign number in ORM Begin Date
Authorization: Section 10 Section 404
Project Description/ Nature of Activity/ Project Purpose:
Site/Waters Name:
Keywords:
�- � � � E o � c
� - °��y=��or����a �
u om�N_ �oa�ti '_
,�'1�f,/ �v ,y� a o e-O 3�`w E� u 2
N 5`ms o i i0 mm n -
o °' � � m -" ° e c E � � @ m c � � � _
° "$" E`�E ���=.H
_" � ��ao.00_E$c m_ _
.. � �DOm.b'oE�'���d'ro 'm
-. � � m `N `o i v = N � >
' L" y�3_ N m�' 'uo ��2
m: � Nam��'S.HS$,`f^��c v iiz
a�� L 8��b g�$w�H�d =eL
w � a - �;'m iao
a°o iN � S�,Q,��m{dp°am�3 �ma
� � N� d ti O O� 3 v F�.f. � C v�
EQj a: � w�; tii:o n'-E y$ oa' `o �°ryc
_.1Omr/i E W F� Ns�gSnhmu�@'� ..ad('�J
¢ q t � s �x ��SamE E�""o'og`�`-� i Q=
�moyo i °"> rfi°°c'�'�Eo°xn�o Wo'8'
,��h g@ w`° w c o° N m b o.c �'- m@- � d° '•
'� m oU m u � 3? �o,i�2En���oa°� _�i
_..; $ N _ _ _ _
- ._ Z �' 'v ''�� °�w�F'mBiaEV��q� ¢`mia.
�.�e!. .. w` � w F y� i0 .. o. u�' y
OI L� �O" Oda�C�Q��OC� m�`.
t�n°¢ mv � 1tl� £>n` $3Y.=E«°¢B� m o
m c m' z 2 8i o '�8 y`°n�''£-' `m m
Q � r �E °c '� �:. � D _ `m m 8i o
d v y w m �' .' g q'o '3 °c o � U p m
a g `-� wU� V�'°� .. ua ��, z �`�d
� ° �@ °' `@ v °c$°oUrn`°,T^ ' u Z m
c Q F �mF°t=2 E� -C',`o � Uy v z
a � E �' m`�y�°�Amm���c'°.Eae E dZ �
S En -- � �� c � � � J',N'�oc ��rn�'='3m `U a
��� � 3 �� E � U 3 m 8° w c. �.�i 3 y � � N a
C O W !n g q U 'Z o � II N.N �c - 3 N O�'
sg Q a° `� `�9 � im
o dw �+s F c �� '� iv °U u Wo�� v$ v'��^ m 3 E U CU�
��zgm' � U UC1 s�u° � N��8��t5�yrY�ma Qz �c
� �� •• v m E `� m m' ��°'g u ii � E c'g o e °1 �
''i o G�= o d 0 m� } e 9 i c° �X 3`�n �3 N� 3= � .. � �`�
g>.�¢ ��°o o� °d '�`'�a���°'^`,n$'. E� � O_
na3o�7� uma= m c� =
C'T O li � 9 .� Y 0 > C� � O . w a W O
o°rn9 V c�n � mmm Uy�:, 9dv°'� tm 3�m t�m
� ic �yy 9 Ti �op ao�p rr .4�a pn.N�a � U 'a{p
L y .. ^9 Q m� �� N= 0 c N 6 E N m F L � � 6
c C `$ m: a$ m^ a a= c q� ��
�a � �� � ^�,B d�n�NLA�_ uv .
Z i � as t�nO1m�°nc'tg.Am"`�3a° n° ygz
a ulu 'i c�"°»°_g'e°�3um� �iE d
F
S`ma aamqE;mt�c E 8 dam'
`o���g ..�@'go ? �
°.: '�" °°'�o�? y��$ �a"�°Zg U E
o: '�" `roF oN o ��a S.i�'i 8"'o.y E
.- ° y i i Z w w o. b w m�- .�' y° U
£ °°_S $ �
u�..;._ w�o ,� � g �b �':�08„.�.��vc�'��o cm 'z�
a$'n _ a5 �u ?°� L V tm�°�h� a z
�°n �� m �� U n D ' o��_ Fw p3° x¢ L>> yT Z Z �
O:�, � O N(O N !i� � 11 O. N g i N p y - 4 O Q
d... f Ci � t � vc N Z ; Lp - N o°� � N N�-`O y N m Z w� M1
q
F�-�o.��'m ^i� 'm�+ p'-�0m`�n2°'U-y0'm$ � U �
;mN m '�l' m°°m$'�°n°m�id�=E °� �
--.n2gi°¢ mEU FB, 2n` °m`m5U(JOE_ 3 U m
m � 9 �
8 a E �, d S ���
'" °v a W � " o ° 3 $ e m"
m�:�_ a Yl � 'Sc r o e c3o
RQ � j % mA � m° ii a yo �
�m � = �8 �a'.� y`� g a °�w
�'' a° ' o E Q o a C E ' A � _ a a
7:. a 2 SN _.i5 0 3 � � m` � Q
�3'j' � � .. nl �� m � cl O n�oi n
-: S?{7 0� E v� c5 �o moca m� m 9 W E� °�'
3°I ryw E V c m; £ mU ¢ u�E �i y: a 1'd- S= @c
'�� :c�:.11� 3`m wQ tm°c w ii � a`r = �; � E�� fi
��:� e� m V i d o o �°m`� z° 5 '� ° p
2. 3 z ti'¢3 a` a`� d� t�°O �'n i b E ai a` d
o��F W ATFqOG
h y
� r
O T
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the X Section 404 Permit ❑ Section 10 Permit
Carps:
1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? X Yes ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certifcation — Express ❑ Riparian Buffer Authorization
1e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes X No ❑ Yes X No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation X Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h ❑ Yes X No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No
2. Project Information
2a. Name of project: Bridge 14, SR 1746
2b. County: Burke
2c. Nearest municipality / town: Valdese
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state 176P.13.R.150
praject no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. N/A
3c. Responsible Party (for lLC if N�A
applicable):
3d. Street address: N/A
3e. City, state, zip: N/A
3f. Telephone no.: N/A
3g. Fax no.: N/A
3h. Email address: N/A
Page 1 of 10
!1/�M1I C..�.« \/.....i.... A 7 1'1..........1....1/1 �1/1/�O \/.....i....
4. Applicant Information (if different from owner)
4a. Applicant is: North Carolina Department of Transportation
4b. Name: J.J. Swain, Jr., P.E., Division Engineer
4c. Business name N.C. Department of Transportation
(if applicable):
4d. Street address: 55 Orange Street, P.O. Box 3279
4e. City, state, zip: Asheville, NC 28802
4f. Telephone no.: 828-251-6171
4g. Fax no.: 828-251-6394
4h. Email address: rdbryan ncdot.qov
5. AgenUConsultant Information (if applicable)
5a. Name: N/A
5b. Business name N/A
(if applicable):
5c. Street address: N/A
5d. City, state, zip: N/A
5e. Telephone no.: N/A
5f. Fax no.: N/A
5g. Email address: N/A
n,.....n..��n
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): N/A
1 b. Site coordinates (in decimal degrees): Latitude: 35.698180° N Longitude: -81.53101 °W
1c. Property size: 0.42 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Cub Creek; UT to Cub Creek
proposed project:
2b. Water Quafity Classification of nearest receiving water: C
2c. River basin: Catawba
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing bridge is located in a medium density residential area with scattered fields/pastures and woodlands.
3b. List the total estimated acreage of all existing wetlands on the property:
0.0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
60; 60
3d. Explain the purpose of the proposed project:
Replace the existing 25' 9" long by 19' single-span bridge with a 45' long by 24' wide single-span bridge.
3e. Describe the overall project in detail, including the type of equipment to be used:
Replace bridge with a bridge. Sixty linear feet of the UT will be relocated to allow widening of the road for safety
requirements; a portion of the relocated stream will have a floodplain bench. The new stream will measure 76 feet long.
An existing 6' waterline upstream of the bridge will be relocated approximately 15' farther upstream. Equipment used will
include excavators, crane, and trucks.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / X Yes ❑ No ❑ Unknown
project (including all prior phases) in the past?
Comments: prelim JD form attached to this PCN
4b. If the Corps made the jurisdictional determination, what type X Preliminary ❑ Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Corps
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
See 5b below.
5. Project History
5a. Have permits or certifications been requested or obtained for � yes X No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes X No
6b. If yes, explain.
Page 3 of 10
.,�.� �,..... .,..._:,._ , � �,.,.,....�,.. ,� ���o "..._:__
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands X Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
W1 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
wZ � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
WS ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3 b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Streambank X PER X Corps
S1 X P❑ T Stabilization Cub Creek � INT ❑ DWQ 10-12 3
Waterline X PER X Corps
S1 ❑ P X T relocation Cub Creek � INT � pWQ 10-12 10
dewatering
S2 X P❑ T Stream relocation UT to Cub Creek X PER X Corps 2 60
❑ INT ❑ DWQ
S2 X P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S3 � P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S4 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 113
3i. Comments: 3 feet of permanent impact to Cub Creek to stabilize old confluence of Cub Creek and its UT where existing UT
channel is plugged. Stream relocation will impact 60 LF of UT but new channel will measure 76 feet long.
Page 4 of 10
nnr,i r_.,.... �i......:�.. e o n.........�..,. nn nnno �i.....:...,
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora T
01 ❑P❑T
02 ❑P❑T
03 ❑POT
04 ❑P❑T
4f. Total open water tmpacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surtace area (acres):
Sj. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number— Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora T im act re uired?
B1 ❑P❑T ❑Yes
❑ No
62 ❑P�T ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
n....,, c ..a , n
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Bridge designed to avoid impacts to Cub Creek. Impact to UT necessary to meet design safety standards for road width.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
N!A
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for X Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ X Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this X Payment to in-lieu fee program
project?
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigatfon Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-Iieu Fee Program
4a. Approval letter from in-lieu fee program is attached. X Yes
4b. Stream mitigation requested: 60 linear feet
4c. If using stream mitigation, stream temperature: ❑ warm X cool ❑ cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Rlparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
nnn� r......, v,,...:,.., n o n,.........�... nn �nno �a,.,.:_..
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiptier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitlgation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
�...._�,..,�
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified � Yes X No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? X Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No.
000250 Post Construction Stormwater Program.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project? N/A
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
❑ USMP
apply (check all that apply): ❑ Water Supply Watershed
X Other: N/A
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the foliowing state-implemented stormwater management programs apply � pRW
(check all that apply): ❑ Session Law 2006-246
X Other: N/A
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? � Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No
Page 8 of 10
nnr,i r_.,...., v,.�.,:..., n o n..........ti... +n nnno v.....:.,,.
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(NOrth Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Viotations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Iso�ated
Wetland Rules (15A NCAC 2H .1300), DWQ Surtace Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposai (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
nn�i r......, v.,...:..., n o n,,,....,..�,.,. nn �nno �i.,..,:....
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � yes � No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
Sd. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
USFWS county species list, field survey (potentially suitable summer roosting habitat for northern long-eared bat present)
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Current Maps/Database
7. Historic or Prehistoric Cuitural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NC SHPO website: http://gis.ncdcr.gov/hpoweb/.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: Bridge will not negatively impact water flow through the site
8c. What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Program website:
http //www.ncfloodmaps.com/
Roger D. Bryan � 10 / ls
ApplicanUAgenPs Printed Name ApplicanUAg Ys Signature ate
(AgenYs signature is valid only'rf an authorization letter from lhe applicant
is rovided.
n...... + n., s � n
ATTACHMENTA
PRELIMINARY JURISDICTIONAL DETERMINATION FORM
BACKGROUNDINFORMATION
A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL
DETERMINATION (JD�:
B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:
NC DOT
55 Orange Sireet PO Box 3279 Asheville, NC 28802
C. DISTRICT OFFICE, FILE NAME, AND NUMBER:
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
Bridge 14 on SR 1746 over Cub Creek in Burke County, NC
(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFPERENT
SITES)
State: NC County/parish/borough: B��ke Clty: va�dese
Center coordinates of site (IaUlong in degree decimal format):
La{. 35.6961802 °N; Long. a�.ss�on� °W.
Universal Transverse Mercator:
Name of nearest waterbody: an c�eek; ur co c�b c�eek
Identify (estimate) amount of waters in the review area:
Non-wetland waters:
se; so linear feet: �o-�z; z width (ft) and/or acres.
Cowardin Class: R��e��e
Stream Flow:
Wetlands: acres.
Cowardin Class:
Name of any water bodies on the site that have been identified as Section 10
waters:
Tidal:
Non-Tidal:
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT
APPLY):
� Office (Desk) Determination. Date: snans
� Field Determination. Date(s): �om�s
SUPPORTING DATA. Data reviewed for preliminary JD
(check all that apply - checked items should be included in case file and,
where checked and requested, appropriately reference sources below):
� Maps, plans, plots or plat submitted by or on behalf of the
applicanUconsultant:
❑ Data sheets prepared/submitted by or on behalf of the
appli nt/consultant.
� Office concurs with data sheets/delineation report.
Office does not concur with data sheets/delineation report.
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
� USGS NHD data
� USGS 8 and 12 digit HUC maps
❑✓ U.S. Geological Survey map(s). Cite scale & quad name: �za,000vaidese
❑ USDA Natural Resources Conservation Service Soil Survey.
❑ National wetlands inventory map(s). Cite name:
❑ State/Local wetland inventory map(s):
❑ FEMA/FIRM maps:
� 100-year Floodplain Elevation is: �2oo.s
(National Geodectic Vertical Datum of 1929)
❑✓ Photographs: ❑ Aerial (Name & Date): or
Q Other (Name & Date): �om�s
� Previous determination(s). File no. and date of response letter:
� Other information (please specify):
1. The Corps of Engineers believes that there may be jurisdictional waters of the
United States on the subject site, and the permit applicant or other affected party
who requested this preliminary JD is hereby advised of his or her option to
request and obtain an approved jurisdictional determination (JD) for that site.
Nevertheless, the permit applicant or other person who requested this
preliminary JD has declined to exercise the option to obtain an approved JD in
this instance and at this time.
2. In any circumstance where a permit applicant obtains an individual permit, or
a Nationwide General Permit (NWP) or other general permit verification requiring
"pre-construction notification" (PCN), or requests verification for a non-reporting
NWP or other general permit, and the permit applicant has not requested an
approved JD for the activity, the permit applicant is hereby made aware of the
following: (1) the permit applicant has elected to seek a permit authorization
based on a preliminary JD, which does not make an official determination of
jurisdictional waters; (2) that the applicant has the option to request an approved
JD before accepting the terms and conditions of the permit authorization, and
that basing a permit authorization on an approved JD could possibly result in less
compensatory mitigation being required or different special conditions; (3) that
the applicant has the right to request an individual permit rather than accepting
the terms and conditions of the NWP or other general permit authorization; (4)
that the applicant can accept a permit authorization and thereby agree to comply
with all the terms and conditions of that permit, including whatever mitigation
requirements the Corps has determined to be necessary; (5) that undertaking
any activity in reliance upon the subject permit authorization without requesting
an approved JD constitutes the applicanYs acceptance of the use of the
preliminary JD, but that either form of JD will be processed as soon as is
practicable; (6) accepting a permit authorization (e.g., signing a proffered
individual permit) or undertaking any activity in reliance on any form of Corps
permit authorization based on a preliminary JD constitutes agreement that all
wetlands and other water bodies on the site affected in any way by that activity
are jurisdictional waters of the United States, and precludes any challenge to
such jurisdiction in any administrative or judicial compliance or enforcement
action, or in any administrative appeal or in any Federal court; and (7) whether
the applicant elects to use either an approved JD or a preliminary JD, that JD
will be processed as soon as is practicable. Further, an approved JD, a proffered
individual permit (and all terms and conditions contained therein), or individual
permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331,
and that in any administrative appeal, jurisdictional issues can be raised (see 33
C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary
to make an official determination whether CWA jurisdiction exists over a site, or
to provide an official delineation of jurisdictional waters on the site, the Corps will
provide an approved JD to accomplish that result, as soon as is practicable.
This preliminary JD finds that there "may be" waters of the United States on the
subject project site, and identifies all aquatic features on the site that could be
affected by the proposed activity, based on the following information:
IMPORTANT NOTE: The information recorded on this form has not
necessarilv been veriFed bv the Corps and should not be relied upon for
later iurisdictional determinations.
Signature and date of
Regulatory Project Manager
(REQUIRED)
0 � io � �
Sign�ture and d e of
person requesting preliminary JD
(REQUIRED, unless obtaining
the signature is impracticable)
�
�N
� �;
N �D
n "
� � �
Q c "'
n 6 m
Nf1 �
�
N �p
�c' �
.-i "
W W
v' v' r
O� Ol d
l0 lD =r
W W "�
� � C
W W �"
O O �
N N
� � r
�-+ r p
w w �
� N r:
0 o c
N N a
V J N
v v
n
f
� �, a
m` r�o o.
> >
ro m t�
m
�
�
�
� r'
m �
� d
o „
c �
O � � �
N N � �
� � � O
� � � �
-n -n . ,�
:: :; F °
a d
� a
�c
a
'.
n
> >
O O n
7 �
(ND N u�i
.ne .�e O
O O �
7 � d
�
O O c�i
. �
> > n
O O
> > N
O
f�p (�p C
rr .�r �
N N �
� , N
a n
North Carolina Department of Environmental Quality
Pat McCrory Division of Mitigation Services Donald R. van der Vaart
Governor Secretary
Mc Yates Allen
NCDOT Divisiou ]3 E�rvironmental Specialist
Norih Carolina Department of Transportatiou
Post Ottice Box 3279
Asheville, North Carolina 28802
Dear Mc Allen:
September 30, 201 S
SubjecC Mitigation Acceptance Letler:
Division 13 Project, Replace Bridge Number 110014 over Cub Creek on SR 1746 (Cub
Creek Circle), Burke County; WBS Element 17BY.13.R.150
The purpose of this letter is to notify you that the North Carolina Department of Environmental Quality —
Division of Mitigation Services (NCDEQ-DMS) will provide the compensatory stream mi[igation for the subject
project. Based on ihe information received from you on September 29, 2015, ihe impacts are located in CU 03050102
of the Catawba River basin in the Norlhem Mountains (NM) Eco-Region, and are as follows:
Catawba Stream Wet(ands Bnffer (Sy. Fl.)
03050102 Non- Coastal
n�M Cold Cool Warm Riparian Za�el Zone2
Ri arian Marsh
Impacts (feeUacres) 0 60.0 0 0 D 0 1 0 0
Tlus impact and associatcd mitigation need were under projected by the NCUOT in Ihe 2015 impact data.
NCDEQ-DMS will commit m implement sufficient eompensa[ory stream mitigation crediLC lo offset tl�e impacts
associated witl� tlils project as delermined by the regulatory agencies using the delivery timeline listed in Section
F3.c.iii of the In-Lieu Fee Inswment dated 7uly 28, 20t0. If the above referenced impact amounts are revised, then
this mitigation acceptance lelter wi0 no tonger be valid and a new mitigation accep[ance letter will be required from
NCDEQ-DMS.
If you have any questions or need additiona] infomiation, please contact Ms. Beth Harmon at 919-707-8420.
Sincerely.
�(\��
James Stanfill
Asset Manageme�t Supervisor
cc: Ms. Lori Beckwith, USACE — Asheville Regulatory Field Office
Ms. L'v�da Fitzpatrick, NCDOT — PDEA
File: SR 1746 Bridge 110014 —Division 13
1652 Mail Service Center, Rateigh, Norih Carolina 27699-1652
Phone:919-707�97611nternet: wvnv.nceep.net
Fn Equal Oppotluniry I AffirtnaL've Action Employer- h7atle in DaM1 <<om �ecycied paper
-:1.'a4�.':<(i �! .
Figure 1 Site 1 upstream
^r ' �
}� ... r � �y���ye �+�..�.a�7
� ' ��':�" � , }1�
iJa� , - tn�.V
a ` ., 5
„�v 1. i 1�.�.
4P'.�
�' . � ��.�,
.
� ¢'�y��.� �
K++, � .. �'' '
.,�' . . _ �.� . .. �
� 'r° �� . ....N"_ 'i. ;�
-'..7-r-�'.+�.. � _ .,, � _ -, -
; ". ,,.� . . � tc'
i "� � '� - '
.. ,CS; . � � ..` ..
c'' r '
.'{, . ¢ , n 'f ~ � -
i � - F �4r .Y , �n "� �' .-'1., � M �
. �. � •` : w � `'� i.... -dL
� �A���'�� � �', � �
�,..,�.. �.f... ��. Yy
i-,�,' .r � .FS::.r t�. wr. ..3' '
Figure 2 Site 1 downstream
��;'
� ��
1.c1
'- 3 1 '
�' w
i! �'f �.
4�. -
Figure 3 Site 2
.:�+s �' - . .
. t
i;y� �
� � . .
` �
.a.`�. . .. - .. ' � � .
_ :� ,��,.
� � ��� -
:, , - �. . � -
Figure 4 Bridge 14
. , � ^' .. - r.ha
,,�kA . ' �" c
A
i1[. � 4�_.�
r`..
. ��i. � "�^:
��„ � �
.,
�.�4:, �A� !�j ' �"�v
' � �r
yy.�T � R)r Y. � �
i
`�` ;t, +., �* � : �
,. E;
� � �� ��
x � ��
:� ' �"��i�
�' . ,:
� ,, .,,� , ��:;;
~ � �'
- ;:.a-. +�, ^�r
♦ w . t` ��s;'�
.. .. y-=:-s�L
�'• -
t . ;��
( � �.,(y �f � �
1.�, s,p%Y�'.:��\. n - ��X
a
� �
r'
. �
yrT
�'_ x � .
a t'
�i•�.1� ! � �'
;'''i���� .�''� s� . .� ' .
�..'*� 1 �, n St,e ��„y `%f' �/ +£..,:` '� . rf.Y,� �
wr4 y
, , }����E�' �,1�{, y��.�.
Jil � � � y� I 1 �
� V.^�i '� Y l. y .. � u
� r ' �J.T +I [ ¢� ..
Jy��
•�i "''�� - • ��+�
�� � �� � 3 ,
a h. �s:. ,�.. � ,
���- �+aq=`' ���� , .. � 7. >3
� �i
; � c
�, �t•..� �in ' it'
. q. . �lj . . . �.
..' . Y 4 .�"''��: i���. 59�� ',d .
. r.y� �� i�'� . ��"•
`�.!- ki r �.,' K "1� � . ++ � +.` � .
'` `]0.'7..
�, - , �- ��
� _ � �� .s
15