Loading...
HomeMy WebLinkAbout20130677 Ver 1_Project completion form BR 115 Pine Hall Road Stokes_20151009 Carpenter,Kristi From:Euliss, Amy Sent:Friday, October 09, 2015 2:10 PM To:Wanucha, Dave; Thomas, John T JR SAW (John.T.Thomas.JR@usace.army.mil) Cc:Mabe, David S; Suggs, Phillip H; Guy, Jeremy M Subject:RE: project completion form BR 115 Pine Hall Road Stokes Attachments:Pine Hall headcut.pdf; vein.pdf Following the heavy rain, we had a head cut develop where we had installed the new pipe under Pine Hall Road. We plan to install a vein to stabilize the channel. The slopes are VERY soupy, so we’re going to let things dry out a bit before we do the repair. If we get in there now, we’ll make a much bigger mess than if we wait. I’ve attached a picture of the channel, and a detail of the proposed repair. It’s the one labelled ‘step-pool’ in the vein.pdf. Let me know if you need anything further from me. -Amy From: Euliss, Amy Sent: Wednesday, September 30, 2015 3:05 PM To: Wanucha, Dave; Thomas, John T JR SAW (John.T.Thomas.JR@usace.army.mil) Subject: RE: project completion form BR 115 Pine Hall Road Stokes Attached are before and after shots following @10 inches of rain. From: Euliss, Amy Sent: Monday, September 28, 2015 1:40 PM To: Wanucha, Dave; Thomas, John T JR SAW (John.T.Thomas.JR@usace.army.mil) Cc: Cvijetic, Bojan Subject: project completion form BR 115 Pine Hall Road Stokes We’ve completed the replacement of BR 115 on Pine Hall Road in Stokes County. A copy of the DWR completion form is attached. This low impact bridge replacement project was approved by the USACE via email on 6.28.13. We don’t have an Action Id. in our files for the USACE. Amy Euliss NCDOT Division 9 Environmental Officer 375 Silas Creek Parkway Winston Salem, NC 27127 336-747-7802 (work) Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1