Loading...
HomeMy WebLinkAbout20150917 Ver 1_More Info Requested_20151002From: Smith, CheniL Sent Friday, October O2.2O15 12:10 PM To: 'Yates. Kevin' Subject: RE: Middleton Subdivision Hi Kevin, Thanks very much for your responses tomyquestions. Yes it's probably better to not include bridges in the impact table in the future. Sorry for the inconsistencies between the Corps and DWR, but I'll be permitting the wetland impact associated with th6 sewer line in Inset 4 as a temporary impact. Also, as far as the mitigation for stream impacts goes, DWR requires 1:1 mitigation for permanent stream impacts that exceed 150 linear feet (including dissipater pads). So if you could get a reservation letter for 88 additional feet for a total of 288 feet, that's all I need to move this project along. Thanks. [herh From: Yates, Kevin[mai|to:yates@mcadamao.mm] Sent: Monday, September ZO,Z01S3:33PM To: Smith, CherriL<cherrisnnith@ncdenr.govx Subject: RE: Middleton Subdivision Cherri, see my responses below. Call me when you get a chance regarding the mitigation requirement. Thanks! From: Smith, CheniL[mai|1ozherhzmi1h(@ncdenr.Rov Sent: Tuesday, September ZZ,Z01S4:44PM To: Yates, Kevin Subject: Middleton Subdivision Hi Kevin, I've had a chance to look at the application you've submitted for Middleton Subdivision and just had a couple of things to let you know: • I'll be permitting the wetland impact associated with the sewer line in Inset 4 as a temporary impact since DWR doesn't consider the conversion of vegetation tobealoss. Re: Okay, as you probably know the Corps deems forested wetland conversion to herbaceous as permanent. • What exactly are the greenvxay span impacts? |sitan arch span crossing? Re: They are not actual direct stream impacts, I have just called them out so that you can see that we are spanning the streams with bridges for the greenvvaycrossings. | will just make note of them in the future, and keep them out of impact table. The DWR will require at least 288 linear feet of stream mitigation since we require 1:1 mitigation for all permanent stream impacts. I'm not sure if the span impacts will be added to the 288 linear feet because I don't fully understand those impacts. Re: The total permanent impacts are 2QQ linear feet, however, this includes and 63 linear feet of dissipater pad which will be buried at the stream bed elevation (Insets 76>Q), and from what | understood does not require mitigation. Also included in the 288 If of impact is 125 linear feet of unimportant intermittent stream impact as deemed by Corps (Inset 6\. Should | get reservation letter for an additional 125 SIVIUs? Call me when you get achance. Cheni Cberri6mith NCDEQ Division ofWater Resources Raleigh Regional Office |628 Mail Service Center Raleigh, NC27699'|628 ph. 919-791-4251 E-mail correspondence tnond/rom this address may be subject to the North Carolina Public Records Low and may be disclosed to