Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSW3220601_Annual Certificate of Completion (2024)_20240201 CERTIFICATE OF COMPLETION
Post-Construction Stormwater Annual Permit Certification
This certifies that Joe Ervin has completed the Annual Permit Certification for Post-Construction Stormwater Permit SW3220601,Willoughby Electrical
Substation, located in Monroe, Union County,on February 1,2024 in accordance with G.S. 143-214.7(b4). Please keep a copy of this certificate for your
records.The electronic record will be stored in the Department of Environmental Quality's digital repository permit file.
The Annual Permit Certification must be completed each year on or before the day of permit issuance, February 8. Failure to do so is a violation of your
permitting conditions and is subject to enforcement action per G.S. 143-215.6.
As indicated in the Annual Certification Form submitted on February 1,2024,the project is not in conformance with all of the permitting conditions and
must be brought into conformance via the corrective action and timeline provided in Section E.of the Annual Certification Form.
�F�_
Jim Farkas
State Stormwater Engineer
Division of Energy, Mineral,and Land Resources