No preview available
HomeMy WebLinkAboutSW3220601_Annual Certification Summary (2024)_20240201 Section A-Project Information Permit Number: SW3220601 Project Town/City: Monroe Project Name: Willoughby Electrical Substation Project County: Union Permit issued: 2/8/2023 Project Status: underway Section B-Permittee Information Name: Union Power Cooperative Street Address: Mailing Address: Signing Official: Gregory Andress 1525 N Rocky River Rd 1525 N Rocky River Rd Title: Executive Vice President and General Manager Phone Number: 704-289-3145 Ext. Monroe,NC 28110 Monroe,NC 28110 Email Address: matt.baucom@union-power.com Section C-Property Owner Information Name: Union Power Cooperative Street Address: Mailing Address: Signing Official: Gregory Andress 1525 N Rocky River Rd 1525 N Rocky River Rd Title: Executive Vice President and General Manager Phone Number: 704-289-3145 Ext. Monroe,NC 28110 Monroe,NC 28110 Email Address: matt.baucom@union-power.com Section D-Site Conformance with Permitting Conditions Max BUA not exceeded? Yes Veg.setbacks per plans? Yes Site is as shown on plans? Yes SCM BUA not exceeded? NA Easements recorded? NA Designer Cart.submitted? No Lot BUA not exceeded? NA O&M Agreemt recorded? No O&M being performed? Yes BUA as shown on plans? Yes O&M Agreemt on plats? NA No maintenance issues? Yes SCM/LD area per plans? Yes Deed Restrict.recorded? NA Maint.records being kept? Yes SCM/LD area accessible? Yes O&M done per E&SC? Yes Permit is active? Yes Stormwater outlets stable? Yes SCMs fixed when done? Yes Other conditions met? NA See Attachment A for a list of all N/A explanations to the above items. Section E-Plan to Bring the Project info Conformance Is the project in conformance with all permit conditions? No See attached plan to bring the project into conformance with conditions. Section F-Project Certifier Information Certifier Signing: Joe Ervin Street Address: Mailing Address: Title: Proj Mgr/Engr IV 123 N White St. 123 N White St Phone Number: 843.697.0606 Email Address: jervin@pike.com Ft Mill,SC 29715 Ft Mill,SC 29715 Section G-Certification The information in this form is true,accurate,and complete? Yes The project is in conformance with all permit conditions? No The project is not in conformance with all permit conditions but will be brought into conformance? Yes Electronically signed by Joe Ervin on February 1,2024. ATTACHMENT A Explanation about why"NIA"items above are not applicable to this project. Max BUA not exceeded N/a: SCM BUA not exceeded N/a: Not a high density project Lot BUA not exceeded N/a: Not as subdivision project BUA as shown on plans N/a: SCM/LD area per plans N/a: SCM/LD area accessible N/a: Stormwater outlets stable N/a: Veg.setbacks per plans N/a: Easements recorded N/a: No Easements Required O&M Agreemt recorded N/a: O&M Agreemt on plats N/a: Final plat has not yet been created-recorded O&M will be referenced then Deed Restrict.recorded N/a: Not required for low density project O&M done per E&SC N/a: SCMs fixed when done N/a: Site is as shown on plans N/a: Designer Cert.submitted N/a: O&M being performed N/a: No maintenance issues N/a: Maint.records being kept N/a: Permit is active N/a: Other conditions met N/a: Additional Permit Conditions not required Action plan to bring the project into conformance with ALL permitting conditions(attached).