HomeMy WebLinkAboutNCC231709_NOT Closeout Documents_20240130 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105
(336) 776-9800
County:
Yadkin
Project:
Smithtown Retail 44kV Tap Four Pole Bent
River basin:
Yadkin-PeeDee
Person financially responsible:Duke Energy Carolinas,LLC-Kevin T Mason
Project#: YADKI-2023-005
Address:
1. Project Location:
Shady Grove Church Road,East Bend
Pictures:
Yes-Digital
2. Weather and soil conditions:
Sunny,40s,wet soil
Initial inspection:
No
3. Is site currently under notice of violation?
No
4. Is the site in compliance with S.P.C.A.and rules?
Yes
526 South Church Street,Mail Code 109Q,Charlotte,NC 28202-1006
If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No
If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name):
Title:
Inspection report: Sent Report
Date given/sent: January 19,2024
9. Corrective action needed:
10. Comments:
Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or
self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the
NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice
of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that
this correspondence must be uploaded as part of completing the NOT process. If you have any questions,please contact
me at Robby.Deans@deq.nc.gov or by phone at(336)776-9658.
Reported by:
Others present:
Date of inspection:
January 11,2024
Time arriving on site:
10:45 AM
Time leaving site:
10:55 AM
Robby Deans