Loading...
HomeMy WebLinkAbout20140192 Ver 1_Approval Letter_20151002From: Price, Zan (George) Sent: Friday, October 02, 2015 4:04 PM To: 'John Vilas'; 'Brown, David W SAW'; 'Mark Cathey' Cc: Davidson, Landon; King, Melissa; Riddle, Shawna; Hamlett, Mark A.; Deaton, Shannon L.; Barnett, Kevin; 'Ben Cathey'; 'Forrest Westall'; 'Danny Bridges'; 'Nathan Sawyer'; Sullivan, Shelton; Higgins, Karen; Fox, Tim; Leslie, Andrea J; Loftis, C. Scott Subject: DWR Approval - Plans for the Big Hungry River -Lower Dam Stream Stabilization John, DWR approves the submitted Corrective Action Plan (CAP) regarding the proposed stream stabilization plan above the lower dam. Please update us on the construction schedule once the contractor mobilizes to the site. Additionally, please provide DWR the work logs and progress reports described in the "Construction Monitoring" section of the CAP. Please contact us immediately if any issues come up during construction. I hope everyone stays safe and dry this weekend. Regards, Zan Price, P.E. NCDEQ- Division of Water Resources Water Quality Regional Operations Section Assistant Regional Supervisor - Asheville Regional Office 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 ph.: 828-296-4500 fax: 828-299-7043 email: zan.price@ncdenr.gov website: www.ncwaterquality.org Need help with other DEQ permits? http://porta1.ncdenr.org/web/deao/permit-directory Notice: Per Executive Order No. 150, all emails sent to and from this account are subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: John Vilas[mailto:john.vilas@mcgillengineers.com] Sent: Monday, September 28, 2015 5:53 PM To: Brown, David W SAW <David.W.Brown@usace.army.miI>; Price, Zan (George) <Zan.Price@ncdenr.gov>; Mark Cathey <Mark.Cathey@Mcgillengineers.Com> Cc: Davidson, Landon <landon.davidson@ncdenr.gov>; King, Melissa <Melissa.King@ncdenr.gov>; Riddle, Shawna <shawna.riddle@ncdenr.gov>; Hamlett, Mark A. <mark.hamlett@ncwildlife.org>; Deaton, Shannon L. <shannon.deaton@ncwildlife.org>; Barnett, Kevin <kevin.barnett@ncdenr.gov>; Ben Cathey <Ben.Cathey@Mcgillengineers.Com>; Forrest Westall <Forrest.Westall@Mcgi Ile nginee rs.Com>; Danny Bridges <Danny.Bridges@Mcgillengineers.Com>; Nathan Sawyer <nathan.sawyer@mcgiIle nginee rs.com>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov>; Higgins, Karen <karen.higgins@ncdenr.gov>; Fox, Tim <tim.fox@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Loftis, C. Scott <scott.loftis@ncwildlife.org> Subject: RE: Corps Review of NCDENR-DWR Additional Information Request & Plans for the Big Hungry River -Lower Dam Stream Stabilization (UNCLASSIFIED) To All This is email #1 of 2 because the file size of attachments is too large to send together. Attached to this email is the Corrective Action Plan requested for the Big Hungry - Lower Dam Project. The following email will contain a full set of construction plans, revised to include the proposed stream stabilization work. Please let me know if you have trouble receiving this email or the attachments. Thankyou John John Vilas Program Services Manager - Environmental 468 New Market Blvd. Suite B I Boone, NC 28607 Phone: 828.386.1920 1 Cell: 828.964.3962 1 Fax: 828.386.1923john.vilas@mcgillengineers.com www.mcgillengineers.com -----Original Message ----- From: Brown, David W SAW[ma iIto: David.W.Brown@usace.army.mi1] Sent: Monday, September 14, 2015 10:28 AM To: Price, Zan (George) <Zan.Price@ncdenr.gov>, John Vilas <john.vilas@mcgillengineers.com>, Mark Cathey <Mark.Cathey@Mcgillengineers.Com> Cc: Davidson, Landon <landon.davidson@ncdenr.gov>, King, Melissa <Melissa.King@ncdenr.gov>, Riddle, Shawna <shawna.riddle@ncdenr.gov>, Hamlett, Mark A. <mark.hamlett@ncwildlife.org>, Deaton, Shannon L. <shannon.deaton@ncwildlife.org>, Barnett, Kevin <kevin.barnett@ncdenr.gov>, Ben Cathey <Ben.Cathey@Mcgillengineers.Com>, Forrest Westall <Forrest.Westall@Mcgi Ile nginee rs.Com>, Danny Bridges <Danny.Bridges@Mcgillengineers.Com>, Nathan Sawyer <nathan.sawyer@mcgiIle nginee rs.com>, Sullivan, Shelton <shelton.sullivan@ncdenr.gov>, Higgins, Karen <karen.higgins@ncdenr.gov>, Fox, Tim <tim.fox@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>, Loftis, C. Scott <scott.loftis@ncwildlife.org> Subject: Corps Review of NCDENR-DWR Additional Information Request & Plans for the Big Hungry River -Lower Dam Stream Stabilization (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE John, Mark, & Zan, I have reviewed the plans for the Big Hungry River -Lower Dam Stream Stabilization & Zan's comments/request for additional information on September 11, 2015 (see below). The Corps has no further comments/request for additional information beyond those provide by NCDENR-DWR. Please copy us with your response to NCDENR-DWR. As stated in the March 26, 2015 issued notification of permit noncompliance, the Corps has requested submittal of a written corrective action plan which shall contain at a minimum: * Details to remove the unauthorized fill material, * Short-term and long-term stream bank and stream bed stabilization measures upstream of the dam to minimize further sediment destabilization, * Stream restoration/enhancement activities downstream of the dam; * Location of sediment disposal areas and details of how this sediment will be handled and stabilized, * Proposed schedule to perform the corrective action tasks, * Preparation of a final document detailing the performance the remedial actions with supporting as -built drawings and photos. NCWRC and McGill Associates have submitted much of this information since March. The Corps ask the previously submitted information listed above, recently submitted plans for the Lower Dam Stream Stabilization, with revisions based upon comments by NCDENR-DWR; additional information requested by NCDENR-DWR on September 11, and other required information listed above be formalized into a written corrective action plan. This correction action plan shall be submitted to the Corps and NCDENR-DWR for review and approval prior to undertaking the actions outlined in the plan. The Corps can authorized the remedial actions through approval of the corrective action plan. Thanks, David David Brown, PG Regulatory Specialist/Geologist 828-271-7980, ext. 232 david.w.brown@usace.army.miI USACE Wilmington District - Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 -----Original Message ----- From: Price, Zan (George) [mailto:Zan.Price@ncdenr.gov] Sent: Friday, September 11, 2015 4:40 PM To: John Vilas, Mark Cathey Cc: Davidson, Landon, Brown, David W SAW, King, Melissa, Riddle, Shawna; Hamlett, Mark A., Deaton, Shannon L., Barnett, Kevin, Ben Cathey; Forrest Westall; Danny Bridges, Nathan Sawyer, Sullivan, Shelton, Higgins, Karen; Fox, Tim; Leslie, Andrea J, Loftis, C. Scott Subject: [EXTERNAL] RE: Additional Information (Permanent Stabilization Plan & Sediment Removal/mitigation) NOV Response, Big Hungry Dam, Lower Dam Demolition, NOV-2015-PC-0042 John and Mark, Thank you for meeting with us at the site last week to discuss the proposed plans. Please address the following comments prior to finalizing the permanent stabilization plans for the Lower Big Hungry Dam site: 1. Provide the proposed construction sequence for the project. Include measures to minimize sedimentation and turbidity impacts downstream of the work area to avoid violations of water quality standards. Provide the proposed methods to remove accumulated sediment upstream of the temporaryjersey barrier dam. 3. Add language to the plans regarding same day stabilization of finished grade streambanks with seed and coir matting. 4. Please complete the dimension table for the boulder toe stabilization detail and soil lift detail. Also please specify the minimum boulder size for the proposed cross vane structure. Provide the proposed bank slope above all the proposed boulder toe areas. 6. Provide the proposed planting densities for live stakes and trees. 7. Please describe the plan for construction oversight during the stabilization work. 8. Are there any plans to complete sediment removal of the impacted areas downstream of the dam? We appreciate your efforts to stabilize the river to minimize additional sediment loss downstream. Don't hesitate to contact Tim Fox or myself if you have any questions. Regards, Zan Price, P.E. NCDENR - Division of Water Resources Water Quality Regional Operations Section Assistant Regional Supervisor - Asheville Regional Office 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 ph.: 828-296-4500 fax: 828-299-7043 email: zan.price@ncdenr.gov <mailto:zan.price@ncdenr.gov> website: Blockedwww.ncwaterquality.org<Blockedhttp://www.ncwaterquality.org/> Notice: Per Executive Order No. 150, all emails sent to and from this account are subject to the North Carolina Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE 4