Loading...
HomeMy WebLinkAbout20240205 Ver 1_Riparian Buffer Authorization_2024013041M State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project: 5706 Reflection Point Granite Falls NC 28630 1b. County: Caldwell 1 c. Nearest municipality: North Catawba Township 1d. Subdivision name: Edgewater le. Is the project located in any of North Carolina's twenty coastal counties? If yes, answer 1f below. ❑ Yes X No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes X No 2. Owner Information 2a. Name on Recorded Deed: Kellye Sue Sullivan and Denise Lynn Foster 2b. Deed Book and Page No. 1915, page 1053 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was treat 31, page 155 2d. Responsible Party for Corporations): 2e. Street address: 5706 Reflection Point 2f. City, state, zip: Granite Falls, NC 28630 2g. Telephone no.: 828-707-3692 2h. Fax no.: 2i. Email address: Paws204@outlook.com 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: HiZULIVED JAN 3 i 2024 FORM: BA 10-2013 Page 1 of 4 DEQ-l"LATER RESOURCES 401 & DUFFE;i PERMITTING B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 2754-79-9089 1 b. Site coordinates (in decimal degrees): Latitude: 35.782 Longitude:-81.502 1 c. Property size: 1.649 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Catawba River 2b. Water Quality Classification of nearest receiving water: C; Tr, HOW 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: New House Construction 3b. Attach an 8'% x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8%x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 128.57 3e. Explain the purpose of the proposed project: Create path from house to boat dock 3f. Describe the overall project in detail, including the type of equipment to be used: Will use backhoe/skid to create circular path. See enclosed map. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project(including all priorphases) in thepast? E3 Yes X No 0 Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (ff known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. S. Project History 5a. Have permits or certifications been requested or obtained for this project(including all priorphases) in thepast? El Yes X No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? El Yes X No 6b. If yes, explain. FORM: BA10-2013 Page 2of4 C. Proposed Impacts Inventory 1. Buffer Impacts la. Project is in which protected basin? ❑ Neuse ❑ Randleman ❑ Tar -Pamlico ❑ Jordan X Catawba ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact number— Permanent (P) or Temporary Reason for impact Type of impact (exempt, allowable, allowable wl mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1 ❑ P ❑ T ❑ Yes No B2 LJ P ❑ T Yes No B3 P 0 T Yes No B4 ❑ P ❑ T El Yes El No B5 ❑ P ❑ T LJ Yes El No B6 ❑ P ❑ T LJ Yes ❑ No Total buffer impacts 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Path will be constructed to avoid water run off. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes X No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS proposed? Yes No 2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of IJ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. If due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form. F. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/statellocal) funds or the ❑ Yes X No use of public federal/state land? 1 b. If you answered "yes" to the above, does the project require preparation of an Yes 0 No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act NEPA/SEPA ? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated ❑ Yes X No Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules 15A NCAC 02B .0200 ? 2b. Is this an after -the -fact permit application? ❑ Yes X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): ApplicantlAgent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter From the applicant is provided.) Send ONE complete set of this form and accompanying documents to the following: For government transportation projects sent by First class Mail via the US Postal Service: Amy Chapman NCDWR — 401 & Buffer Transportation Permitting Branch 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class Mail via the US Postal Service Stephanie Goss NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699 - 1617 For government transportation projects sent by delivery service (UPS, Fed Ex, etc.): Amy Chapman OR NCDWR — 401 & Buffer Transportation Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, Fed Ex, etc.): OR Stephanie Goss NCDWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4 For construction of our path from our house to our boat dock we plan on using a bulldozer/skid to create a circular path with proper slant for water control. There are a few trees we wish to remove to accomplish this. We will be applying thick mulch to the path for erosion control. During construction we will maintain a silt fence for sediment control. This path will be circular as enclosed map illustrates coming in front of the retaining wall and gently curving towards the boat dock before going straight backup to the retaining wall. Currentwater flow is also indicated on this map. BUNTON SURVEYING and MAPPING, PA 231 13TH AVE PL N.W. HICKORY N.C., 28601 SURE 5 828-855-3313 828-635-0333 DEREK R. BUNTON, PLS-4808 BUSINESS LICENSE: C-2069 o NNl m WRFIBECINN FOUNDATION SURVEY FOR: KELLYE SUE SULLIVAN DENISE LYNN FOSTER NORTH CATAWBA TOWNSHIP, CALDWELL COUNTY, N.C. DATE: 09/26/23 F.B. H-13, P9.48 SCALE: 1' - 100' PIN 2754-79-9089 REFERENCE D: BOOK 1915 PAGE 1053 REFERENCE PUT: BOOK 31 PAGE 155 DRAWN BY: DEREK R. BUNTON. PLS-4808 :3 ' wWx L_4 S� N P JOB #22050185 FILE NAME: 22Z180185-FOUNDATION lNSc`T r Y G �„ am 5�9�98n14 W E � W. Sn- PAW �,Cti 4441 N 9 g P �d ~~ �� 18 1.649 a Z ACRES 19 drAMv SCOTT WILSON LEGEND 1886/501 to 2013/353 Fxalwo Nan Rao - FN - • i n L Mhl IMP (NO SCALO F%ISTIF NON Pon - OP - • n.r .A, NT N1/r RF9RSEr t aln+-O R.R. sPeN -O o course Burl.. 01cU«e uh5 STONE CORNETT -® L1 N W-2I'W' W 33.14' cONCREIE ,10N.IIIXf-0 1V7 L-2 N loll-W' B' W 128.57' N.C.G.& COMBOL YOMIYF.Nf - ■ \ R- L-3 I S 54'39'34' E 77.99' v.K. L9 1 3 06'M'10- W N E 37.80' 90.09' CNCIWAIm -+ C 4 L-5 0B'29'32' pPNN9G[ M�SR�S Curve Radius Ta Mont L.WtN Ch.1d ONON Bev. iR¢ -Si-® C-1 222.W 95.24 95.01' ".Z9 IB 85'OB'31' E WATER NEMR - W.MSt V&W - pV 5 P E C 1 /, L NOTE S tlEAN a11f -® unNY PoIL -(! EN 5/or aWl L-2 sM Ni / stoolxp1011 NEIE N.ig1Wm Wr faNIWMT[ CNI%IMTM sENEn ullE - oaslec Na N ROG N)R: Pe'R1WY N awn to AWy Alta NL FASOgR3, wlui. vaARAG anon 1KIE _ _ _ — FENcc LINE— C ITRA RIVER A ' ' Ma w ACNA I. MUK R. WWCN, p -9008, certify Vwt this plat was amwn uw.. ary eup.rwba r,a,n an oral •urvn .we. mr.. my wpsrNsian. Ihot tM IpuMaies mt .wrsNa . aNarly Me1.t.OA00+ar th i wb pUyst -U.. wwwa� Ime tteocrew cl: Ntn m. 'S me or n«Bea Fw lane 6u, , m Rat. 100 0 100 200 300 taro twe.,eymeyoalgrmtlg r.W.tratl« ammsr, ane w/t U/Y /cae�0c.�-� PLS-4808 GRAPHIC SCALE - FEET Prp� li onal La�S.,..y¢r, RsOls ml- ".osr R NaIG . NAT N M IIO1lT ar MI . TD NNKT WOE n OBWE R. NNICN. 0.b-9Pa5IlO RO16R a110111D PWF[ IpNa 1T M 1111E A SW M.EY. NM T6 MT W PF I1M® hill BCIIIM IAF ri M NRfI[� NWIm I[uax. fmINK/do 0o xm uRKo m un uNulllp eFMtNLt1 NaIaUT Yr FllK6 IRC[RIWGTIIW :! M YrtY011 WIIF YO P[IN011(f). NNE• NARK MOPPRIy 9 =AM N A. G'N11FRNm MFA ar rMDINL CKvaY xNN A PMKN a SLAIN:1 PRSPFRrr Is taGstm slMl A s,TaW. Nam N12Ma MG d GVDRNt C01NIY (NZ i.F.W PIML /SIIMIItONQ B-2551 a 9 X apps nat,onalmap.pov Q (t] .. i l..N - .\ { tN, �� a ii/fl�ni :YYl i� �,. b.t't.. iJ:i. ✓�. _ ..� L gi mod• I � �� � • ,i',. f. .4 04 y • - - "[lU?.K[CbUt.7IY C w., .... ....... ..."tajv,% Zoom: 16 .tN t F a E BUNTON SURVEYING and MAPPING, PA 231 13TH AVE PL N.W. HICKORY N.C., 28601 SUITE 5 828-855-3313 828-635-0333 P.O. BOX 338, TAYLORSVILLE, N.C. 28681 CARL D. BUNTON, PLS-3032 DEREK R. BUNTON, PLS-4808 BUSINESS LICENSE: C-2069 A LEGEND EXISTING IRON ROD — EIR — 0 EXISTING IRON PIPE — EIP — 0 NEW 1/0 REBAR SET —NIR— 0 R.R. SPIKE —0 EXISTING STONE CORNER — CONCRETE MONUMENT -El N.C.G.S. CONTROL MONUMENT — ■ P.K. NAIL —® CALCULATED POINT —+ MANHOLE — OS DRAINAGE MANHOLE —® FIRE HYDRANT —4 WATER METER — WATER VALVE — D4 CLEAN OUT — ED UTILITY POLE —,0 LIGHT POLE — SEWER LINE -- . OVERHEAD UTILITY LINE — — — FENCE LINE — 17 DALTON L. JACKSON 1886/501 I, DEREK R. BUNTON, PLS-4808, certify that this plat was drawn under my supervision from an actual survey made under my supervision, that the boundaries not surveyed are clearly indicated as drawn, that the ratio of precision as calculated is 1/20,000+, that this plat was prepared in accordance with the "Standards Of Practice For Land Surveying In North Carolina. Witness my original signature, registration number, and s ql is 3rQ dgy,c{ N vembeS 2022. °2 PLS — 4808 Prof I onal�Landfi'S—\�or Registration Number EIR 5/8- REBAR P. MAG NAIL SET IL INTERSECTION 18 1.649 ACRES CATAIVBA RIVER Aot EIR 5/8" 19 SCOTT WILSON 2013/363 EXISRNG NAIL IN ROCK BOUNDARY SURVEY FOR: KELLYE SUE SULLIVAN AND DENISE LYNN FOSTER NORTH CATAWBA TOWNSHIP, CALDWELL COUNTY, N.C. DATE: 09/29/22 F.B. H-13, Pg.48 SCALE: 1" = 100' PIN #2754-79-9089 REFERENCE DEED: BOOK 1915 PAGE 1053 REFERENCE PLAT: BOOK 31 PAGE 155 DRAWN BY: DEREK R. BUNTON , PLS-4808 JOB #22080185 FILE NAME: 22080185 Course Bearing Distance L-1 N 5T27'50" W 33.14' L-2 N SB'53'06" W 128.57' L-3 S 54 34'34" E 77.94' L-4 S 86,04,191, W 37.80' L-5 N 08'29'32" E 44.44' Curve I Radius I Tangent I Length I Chord Chord Bear. C-1 1 222.50' 1 48.24' 1 95.01' 1 94.29' 1 S 66°48'31" E 100 0 100 200 300 GRAPMC — FEET S P E C I A L N 0 T E S NOTE ALL AREAS SHOWN HEREON WERE DETERMINED BY COORDINATE COMPUTATION. NOTE PROPERTY IS SUBJECT TO ANY AND ALL EASEMENTS, RIGHTS —OF —WAY, COVENANTS, RESTRICTIONS, AND CONDITIONS OF RECORD AFFECTING SAID PREMISES. NOTE THIS PLAT IS THE RESULT OF AN ACTUAL FIELD SURVEY MADE BY DEREK R. BUNTON, PLS-4808 AND REFLECTS GROUND EVIDENCE FOUND AT THE TIME OF SAID SURVEY. NOTE' THIS PLAT WAS PREPARED FOR THE EXCLUSNE USE OF THE PARIY(S) NAMED HEREON. CERTIFICATES DO NOT EXTEND TO ANY UNNAMED PERSON(S) WITHOUT AN EXPRESS RECERTIFICATION Trr THE SURVEYOR NAMING SAID PERSON(S). NOTE SUBJECT PROPERTY IS LOCATED IN A WS—N CA WATERSHED AREA OF CALDWELL COUNTY. NOTE: SUBJECT PROPERTY IS LOCATED WITHIN A WS—N CA SPECIAL FLOOD HAZARD AREA OF CALDWELL COUNTY (SEE RE.MA PANEL $3710275400K) B-2551