HomeMy WebLinkAbout20240205 Ver 1_Riparian Buffer Authorization_2024013041M
State of North Carolina
Department of Environmental Quality
Division of Water Resources Division of Water Resources
15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization
FORM: BA 10-2013
Riparian Buffer Authorization Form
A.
Applicant Information
1.
Project Information
1 a. Name of project:
5706 Reflection Point Granite Falls NC 28630
1b. County:
Caldwell
1 c. Nearest municipality:
North Catawba Township
1d. Subdivision name:
Edgewater
le. Is the project located in any of North Carolina's twenty coastal counties?
If yes, answer 1f below.
❑ Yes X No
1f. Is the project located within a NC Division of Coastal Management Area of
Environmental Concern (AEC)?
❑ Yes X No
2.
Owner Information
2a. Name on Recorded Deed:
Kellye Sue Sullivan and Denise Lynn Foster
2b. Deed Book and Page No.
1915, page 1053
2c. Map Book and Page No.
(include a copy of the
recorded map that indicates
when the lot was treat
31, page 155
2d. Responsible Party
for Corporations):
2e. Street address:
5706 Reflection Point
2f. City, state, zip:
Granite Falls, NC 28630
2g. Telephone no.:
828-707-3692
2h. Fax no.:
2i. Email address:
Paws204@outlook.com
3.
Applicant Information (if different from owner)
3a. Applicant is:
❑ Agent ❑ Other, specify:
3b. Name:
3c. Business name
if applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
4.
Agent/Consultant Information (if applicable)
4a. Name:
4b. Business name
if applicable):
4c. Street address:
4d. City, state, zip:
4e. Telephone no.:
4f. Fax no.:
4g. Email address:
HiZULIVED
JAN 3 i 2024
FORM: BA 10-2013 Page 1 of 4
DEQ-l"LATER RESOURCES
401 & DUFFE;i PERMITTING
B.
Project Information and Prior Project History
1.
Property Identification
1a.
Property identification no. (tax PIN or parcel ID):
2754-79-9089
1 b.
Site coordinates (in decimal degrees):
Latitude: 35.782 Longitude:-81.502
1 c.
Property size:
1.649 acres
2.
Surface Waters
2a.
Name of nearest body of water to proposed project:
Catawba River
2b.
Water Quality Classification of nearest receiving water:
C; Tr, HOW
2c.
River basin:
Catawba
3.
Project Description
3a.
Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of
this application:
New House Construction
3b.
Attach an 8'% x 11 excerpt from the most recent version of the USGS topographic map indicating the location
of the site
3c.
Attach an 8%x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map
depicting the project site
3d.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
128.57
3e.
Explain the purpose of the proposed project:
Create path from house to boat dock
3f.
Describe the overall project in detail, including the type of equipment to be used:
Will use backhoe/skid to create circular path. See enclosed map.
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by
the Corps or State been requested or obtained for this
property/ project(including all priorphases) in thepast?
E3 Yes X No 0 Unknown
Comments:
4b.
If yes, who delineated the jurisdictional areas?
Name (ff known):
Agency/ Consultant Company:
Other:
4c.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach
documentation.
S.
Project History
5a.
Have permits or certifications been requested or obtained
for this project(including all priorphases) in thepast?
El Yes X No ❑ Unknown
5b.
If yes, explain and detail according to "help file" instructions.
6.
Future Project Plans
6a.
Is this a phased project? El Yes X No
6b.
If yes, explain.
FORM: BA10-2013 Page 2of4
C. Proposed Impacts Inventory
1. Buffer Impacts
la. Project is in which protected basin?
❑ Neuse
❑ Randleman
❑ Tar -Pamlico
❑ Jordan
X Catawba
❑ Goose Creek
1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of
this form.
Buffer impact
number—
Permanent (P)
or Temporary
Reason for
impact
Type of impact
(exempt, allowable,
allowable wl
mitigation)
Stream name
Buffer
mitigation
required?
Zone 1
impact
(sq ft)
Zone 2
impact
(sq ft)
B1 ❑ P ❑ T
❑ Yes No
B2 LJ P ❑ T
Yes No
B3 P 0 T
Yes No
B4 ❑ P ❑ T
El Yes El No
B5 ❑ P ❑ T
LJ Yes El No
B6 ❑ P ❑ T
LJ Yes ❑ No
Total buffer impacts
1c. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a.
Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1 b.
Specifically describe measures taken to avoid or minimize the proposed impacts through construction
techniques. Path will be constructed to avoid water run off.
2. Buffer Mitigation
2a.
Will the project result in an impact within a protected riparian buffer that
requires buffer mitigation?
Yes X No
2b.
If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and
calculate the amount of mitigation required in the table below.
Zone
Reason for impact
Total impact
(square feet
Multiplier
Required mitigation
(square feet
Zone 1
3 (2 for Catawba)
Zone 2
1.5
Total buffer mitigation required:
2c.
If buffer mitigation is required, is payment to a mitigation bank or NC DMS
proposed?
Yes No
2d.
If yes, attach the acceptance letter from the mitigation bank or NC DMS.
2e.
If no, then discuss what type of mitigation is proposed.
2f.
Comments:
FORM: BA 10-2013 Page 3 of 4
E. Diffuse Flow Plan
All buffer impacts and high ground impacts require diffuse flow or other form of IJ Diffuse flow
stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP
maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form.
If due to site constraints, a BMP other than a level spreader is proposed, please provide a
plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP
Manual and attach a BMP Supplement Form.
F. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/statellocal) funds or the
❑ Yes X No
use of public federal/state land?
1 b. If you answered "yes" to the above, does the project require preparation of an
Yes 0 No
environmental document pursuant to the requirements of the National or State (North
Carolina) Environmental Policy Act NEPA/SEPA ?
1 c. If you answered "yes" to the above, has the document been finalized by the State
❑ Yes No
Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.)
Comments:
2. Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated
❑ Yes X No
Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards,
or Riparian Buffer Rules 15A NCAC 02B .0200 ?
2b. Is this an after -the -fact permit application?
❑ Yes X No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
ApplicantlAgent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter From the applicant is provided.)
Send ONE complete set of this form and accompanying documents to the following:
For government transportation projects sent by
First class Mail via the US Postal Service:
Amy Chapman
NCDWR — 401 & Buffer Transportation
Permitting Branch
1617 Mail Service Center
Raleigh, NC 27699 - 1617
For all other projects sent by First Class Mail via
the US Postal Service
Stephanie Goss
NCDWR — 401 & Buffer Permitting Branch
1617 Mail Service Center
Raleigh, NC 27699 - 1617
For government transportation projects sent by
delivery service (UPS, Fed Ex, etc.):
Amy Chapman
OR NCDWR — 401 & Buffer Transportation
Permitting Branch
512 N. Salisbury Street
Raleigh, NC 27604
For all other projects sent by delivery service
(UPS, Fed Ex, etc.):
OR Stephanie Goss
NCDWR — 401 & Buffer Permitting Branch
512 N. Salisbury Street
Raleigh, NC 27604
FORM: BA 10-2013 Page 4 of 4
For construction of our path from our house to our boat dock we plan on using a bulldozer/skid to
create a circular path with proper slant for water control. There are a few trees we wish to remove
to accomplish this. We will be applying thick mulch to the path for erosion control. During
construction we will maintain a silt fence for sediment control.
This path will be circular as enclosed map illustrates coming in front of the retaining wall and gently
curving towards the boat dock before going straight backup to the retaining wall. Currentwater
flow is also indicated on this map.
BUNTON SURVEYING and MAPPING, PA
231 13TH AVE PL N.W.
HICKORY N.C., 28601
SURE 5
828-855-3313
828-635-0333
DEREK R. BUNTON, PLS-4808
BUSINESS LICENSE: C-2069
o NNl m
WRFIBECINN
FOUNDATION SURVEY FOR:
KELLYE SUE SULLIVAN
DENISE LYNN FOSTER
NORTH CATAWBA TOWNSHIP,
CALDWELL COUNTY, N.C.
DATE: 09/26/23 F.B. H-13, P9.48 SCALE: 1' - 100'
PIN 2754-79-9089
REFERENCE D: BOOK 1915 PAGE 1053
REFERENCE PUT: BOOK 31 PAGE 155
DRAWN BY: DEREK R. BUNTON. PLS-4808
:3
'
wWx
L_4
S� N
P
JOB #22050185
FILE NAME: 22Z180185-FOUNDATION
lNSc`T
r
Y
G
�„
am
5�9�98n14
W
E �
W. Sn- PAW
�,Cti
4441
N
9
g
P
�d
~~
��
18
1.649
a Z
ACRES
19
drAMv
SCOTT WILSON
LEGEND
1886/501
to
2013/353
Fxalwo Nan Rao - FN - •
i
n
L Mhl IMP (NO SCALO
F%ISTIF NON Pon - OP - •
n.r .A,
NT N1/r RF9RSEr t aln+-O
R.R. sPeN -O
o
course
Burl..
01cU«e
uh5 STONE CORNETT -®
L1
N W-2I'W' W
33.14'
cONCREIE ,10N.IIIXf-0
1V7
L-2
N loll-W' B' W
128.57'
N.C.G.& COMBOL YOMIYF.Nf - ■
\ R-
L-3
I S 54'39'34' E
77.99'
v.K.
L9
1 3 06'M'10- W
N E
37.80'
90.09'
CNCIWAIm -+
C 4
L-5
0B'29'32'
pPNN9G[ M�SR�S
Curve
Radius
Ta Mont
L.WtN
Ch.1d
ONON Bev.
iR¢ -Si-®
C-1
222.W
95.24
95.01'
".Z9
IB 85'OB'31' E
WATER NEMR -
W.MSt V&W - pV
5 P E C 1 /, L NOTE S
tlEAN a11f -®
unNY PoIL -(!
EN 5/or aWl
L-2
sM Ni / stoolxp1011 NEIE N.ig1Wm Wr faNIWMT[ CNI%IMTM
sENEn ullE -
oaslec Na N ROG
N)R: Pe'R1WY N awn to AWy Alta NL FASOgR3, wlui.
vaARAG anon 1KIE _ _ _ —
FENcc LINE—
C
ITRA RIVER A
' ' Ma w ACNA
I. MUK R. WWCN, p -9008, certify Vwt this plat was
amwn uw.. ary eup.rwba r,a,n an oral •urvn .we. mr..
my wpsrNsian. Ihot tM IpuMaies mt .wrsNa . aNarly
Me1.t.OA00+ar th i wb pUyst -U.. wwwa� Ime tteocrew cl: Ntn
m. 'S me or n«Bea Fw lane 6u, , m Rat. 100 0 100 200 300
taro twe.,eymeyoalgrmtlg r.W.tratl« ammsr,
ane w/t U/Y /cae�0c.�-� PLS-4808 GRAPHIC SCALE - FEET
Prp� li onal La�S.,..y¢r, RsOls ml- ".osr R
NaIG . NAT N M IIO1lT ar MI . TD NNKT WOE n OBWE R. NNICN.
0.b-9Pa5IlO RO16R a110111D PWF[ IpNa 1T M 1111E A SW M.EY.
NM T6 MT W PF I1M® hill BCIIIM IAF ri M NRfI[�
NWIm I[uax. fmINK/do 0o xm uRKo m un uNulllp eFMtNLt1 NaIaUT Yr
FllK6 IRC[RIWGTIIW :! M YrtY011 WIIF YO P[IN011(f).
NNE• NARK MOPPRIy 9 =AM N A. G'N11FRNm MFA ar rMDINL CKvaY
xNN A PMKN a SLAIN:1 PRSPFRrr Is taGstm slMl A s,TaW. Nam N12Ma MG
d GVDRNt C01NIY (NZ i.F.W PIML /SIIMIItONQ
B-2551 a
9
X
apps nat,onalmap.pov
Q (t]
..
i l..N
- .\
{ tN,
�� a ii/fl�ni
:YYl i� �,. b.t't.. iJ:i.
✓�.
_ ..� L gi mod• I �
�� � • ,i',.
f.
.4
04
y
• - - "[lU?.K[CbUt.7IY C w., .... .......
..."tajv,%
Zoom: 16
.tN
t
F a E
BUNTON SURVEYING and MAPPING, PA
231 13TH AVE PL N.W.
HICKORY N.C., 28601
SUITE 5
828-855-3313
828-635-0333
P.O. BOX 338, TAYLORSVILLE, N.C. 28681
CARL D. BUNTON, PLS-3032 DEREK R. BUNTON, PLS-4808
BUSINESS LICENSE: C-2069
A
LEGEND
EXISTING IRON ROD — EIR — 0
EXISTING IRON PIPE — EIP — 0
NEW 1/0 REBAR SET —NIR— 0
R.R. SPIKE —0
EXISTING STONE CORNER —
CONCRETE MONUMENT -El
N.C.G.S. CONTROL MONUMENT — ■
P.K. NAIL —®
CALCULATED POINT —+
MANHOLE — OS
DRAINAGE MANHOLE —®
FIRE HYDRANT —4
WATER METER —
WATER VALVE — D4
CLEAN OUT — ED
UTILITY POLE —,0
LIGHT POLE —
SEWER LINE -- .
OVERHEAD UTILITY LINE — — —
FENCE LINE —
17
DALTON L. JACKSON
1886/501
I, DEREK R. BUNTON, PLS-4808, certify that this plat was
drawn under my supervision from an actual survey made under
my supervision, that the boundaries not surveyed are clearly
indicated as drawn, that the ratio of precision as calculated
is 1/20,000+, that this plat was prepared in accordance with
the "Standards Of Practice For Land Surveying In North
Carolina. Witness my original signature, registration number,
and s ql is 3rQ dgy,c{ N vembeS 2022.
°2 PLS — 4808
Prof I onal�Landfi'S—\�or Registration Number
EIR 5/8- REBAR
P.
MAG NAIL SET
IL INTERSECTION
18
1.649
ACRES
CATAIVBA RIVER
Aot
EIR 5/8"
19
SCOTT WILSON
2013/363
EXISRNG NAIL IN ROCK
BOUNDARY SURVEY FOR:
KELLYE SUE SULLIVAN
AND
DENISE LYNN FOSTER
NORTH CATAWBA TOWNSHIP,
CALDWELL COUNTY, N.C.
DATE: 09/29/22 F.B. H-13, Pg.48 SCALE: 1" = 100'
PIN #2754-79-9089
REFERENCE DEED: BOOK 1915 PAGE 1053
REFERENCE PLAT: BOOK 31 PAGE 155
DRAWN BY: DEREK R. BUNTON , PLS-4808
JOB #22080185
FILE NAME: 22080185
Course
Bearing
Distance
L-1
N
5T27'50"
W
33.14'
L-2
N
SB'53'06"
W
128.57'
L-3
S
54 34'34"
E
77.94'
L-4
S
86,04,191,
W
37.80'
L-5
N
08'29'32"
E
44.44'
Curve
I Radius
I Tangent I Length
I Chord
Chord Bear.
C-1
1 222.50'
1 48.24' 1 95.01'
1 94.29'
1 S 66°48'31" E
100 0 100 200 300
GRAPMC — FEET
S P E C I A L N 0 T E S
NOTE ALL AREAS SHOWN HEREON WERE DETERMINED BY COORDINATE COMPUTATION.
NOTE PROPERTY IS SUBJECT TO ANY AND ALL EASEMENTS, RIGHTS —OF —WAY,
COVENANTS, RESTRICTIONS, AND CONDITIONS OF RECORD AFFECTING SAID PREMISES.
NOTE THIS PLAT IS THE RESULT OF AN ACTUAL FIELD SURVEY MADE BY DEREK R. BUNTON,
PLS-4808 AND REFLECTS GROUND EVIDENCE FOUND AT THE TIME OF SAID SURVEY.
NOTE' THIS PLAT WAS PREPARED FOR THE EXCLUSNE USE OF THE PARIY(S)
NAMED HEREON. CERTIFICATES DO NOT EXTEND TO ANY UNNAMED PERSON(S) WITHOUT AN
EXPRESS RECERTIFICATION Trr THE SURVEYOR NAMING SAID PERSON(S).
NOTE SUBJECT PROPERTY IS LOCATED IN A WS—N CA WATERSHED AREA OF CALDWELL COUNTY.
NOTE: SUBJECT PROPERTY IS LOCATED WITHIN A WS—N CA SPECIAL FLOOD HAZARD AREA OF
CALDWELL COUNTY (SEE RE.MA PANEL $3710275400K)
B-2551