Carpenter,Kristi
From:Euliss, Amy
Sent:Wednesday, September 30, 2015 4:01 PM
To:Wanucha, Dave
Cc:Chapman, Amy; Wyrick, Scott D; Guy, Jeremy M; Suggs, Phillip H; Panek, Lindsey F
Subject:RE: sediment loss site 10 U2579B
We had another very heavy rain with 2+ inches in the rain gauge. The same area got hit again. Crews are working to get
urgent items taken care of before additional heavy rains. Most of the material is coming from the failed basin, some is
coming from a drop inlet. The sediment is being cleaned out of the stream. I’ll forward some pictures when I can get
them off my phone.
From: Euliss, Amy
Sent: Monday, September 28, 2015 12:05 PM
To: Wanucha, Dave
Cc: Chapman, Amy; Wyrick, Scott D; Guy, Jeremy M; Suggs, Phillip H; Panek, Lindsey F
Subject: sediment loss site 10 U2579B
We had a minor sediment loss at permit site 10 on the U2579B project due to failure of a drop inlet. Everything else has
held up, which is pretty good considering the rain over the weekend. Based on our previous experiences reporting
sediment losses to you, we’ll proceed with cleanup in the stream. I’ve attached an email with pictures and one with the
report from our project inspector.
Amy Euliss
NCDOT Division 9 Environmental Officer
375 Silas Creek Parkway
Winston Salem, NC 27127
336-747-7802 (work)
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1