HomeMy WebLinkAboutNCC232147_NOT Closeout Documents_20240124 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: Onslow Project: Jacksonville Line 110,Piney Green River basin: White Oak
Person financially responsible:Piedmont Natural Gas-Jeremy Koster,VP, Project#: ONSLO-2023-028
Strategic Operations
Address: 401 Executive Parkway,New Bern,NC 28562
1. Project Location: Piney Green Rd,Sneads Ferry,Jacksonville
Pictures: No
2. Weather and soil conditions: Sunny 50,workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: January 22,2024
9. Corrective action needed:
10. Comments: The project is complete and ground cover sufficient to restrain erosion has been established
throughout the site. The erosion&sediment control file will be closed.Please contact
Jesse.Batz@deq.nc.gov with questions regarding this report.
Reported by: Jesse Batz /' ' Others present:
Date of inspection: Janua 22,2023 Time arriving on site: 8:00 AM Time leaving site: 8:10 AM
cc: