Loading...
HomeMy WebLinkAboutSW6240103_Plansheet - Grading/Drainage Plan_20240119 (3) LEGEND: w WATER LINE OO EIP-EXISTING IRON PIPE EIP OVERHEAD UTILITY x 394.47'SPOT ELEVATION ❑❑ WATER METER 4Dsite EPKO EPK-EXISTING PK NAIL - STREAM BENCHMARK 0 ASPHALT \ONS ERBO ERB-EXISTING REBAR WETLANDS 51 SIGN WETLANDS solutions o COMPUTED POINT EXISTING EASEMENT LINE ©TRANSFORMER 0 UNSUITABLE SOILS civil engineering land surveying N/F NOW OR FORMERLY X FENCE LINE PPS STREET LIGHT —roc—roc— LIMITS OF CONSTRUCTION 409 Chicago Drive,Suite 112,Fayetteville,NC 28306 w R/W - RIGHT OF WAY TREE LINE • UTILITY POLE — SILT FENCE LINE office 910-426-6777 fax j 910-426-5777 license number I C-2354 r PERTY LINE 1- 100 YEAR FLOOD ZONE C GUY WIRE —iN —iN — JUTE NETTING wwwADsitesolutions.com �cGR/�NgOg ADJOACENT PROPERTY LINE 20o MAJOR CONTOUR 0 TELEPHONE PEDESTAL —Drv—Drv— DIVERSION BERM TIE LINE 199 MINOR CONTOUR N WATER VALVE OINLET PROTECTION RIGHT-OF-WAY —'- -'- - 30' VEGETATED BUFFER FIRE HYDRANT N/F / JUNIOR C. SMITH DB 1343, PG 881 P B 10, PG 33 SEA I 0274 CM 41411111 10�� 7 � 78s \ _ _ 9 REVISIONS \ O O DITCH #5 TO BE REINFORCED WITH NAG S75 MATTING 0 STAPLE PATTERN D 001 001 001 001 10' UTILITY EASEMENTI 001 001 — . . — . . _ . . — . .�. �� - . . — . . — . . — . . — . . _ . . — . . — . . 183 \ DITCH #3 9 �00� —'0 , — 186 1 TO BE REINFORCED 1 1g1 `5 O0� 183 WITH NAG S75 MATTING / �001 185 STAPLE PATTERN D 0pl DITCH #4 / / 00�� . . —T1 _D TO BE REINFORCED 18s �i ' 185.56 185.14 WITH NAG S75 MATTING / 196 . _\STAPLE PATTERN D LIMITS OF CONSTRUCTION / 001107 16.2 AC 85 3 THOMAS TRAIL > ��007 / 00"1 �i.' 1a6• 1 _ 184.60 18/ �g 50' R/W (PUBLIC & UTILITY ACCESS) ^�� 5 — . Op — Tom, —��-- — ^g . — � —001 — —00� ��1 ,���� —T��— _ I r����� 10' UTILITY EASEMENT 001 _ _ _ , — _ 0p1 001 �-�[>� n DITCH #18 184.60TO BE 192 ° WITH NAG S75MATTING L 0 UTILITY EASEMENT ,7 1 C — 18s �\ 188 c � � CHECK DAM I STAPLE PATTERN D r DITCH #21 /� TO BE REINFORCED�� � . g1 1ae DITCH #19 WITH WEIR w .00 DITCH #20 1 TO BE REINFORCED / / �uC $� 190 — ��� TO BE REINFORCED (TYP) I M WITH NAG S75 MATTING L WITH NAG S75 MATTING C. / WITH NAG S75 MATTING `%�1'"v STAPLE PATTERN D n > M STAPLE PATTERN D gy STAPLE PATTERN D _ $6 J Co Lu DITCH #14 \ f / TO BE REINFORCED m N(?p / SILT FENCE / WITH NAG S75 MATTING U a r / (TYP) / STAPLE PATTERN D lb PROJECT NAME / C DITCH #15 LLJ 0EINFORCED LLJ O WITH NAGTO BE RS75 MATTING O . 8 STAPLE PATTERN D Cn THELEANDER ���, �� I" w ,q ,� < Lj 57 / � LEE PRESERVE q, I I U� LLJ 0 56 � ,'\1/Or Z ��� J0 / 18 _ Z 0 �� ■ INLET Q 192 PROTECTION A \\ , ,��� ♦�� (TYP) DITCH #16 \y Al , / �B3 46 00 �-OG \ (pO TO BE REINFORCEDI O 53 7 49 48 47 O �� , WITH NAG S75 MATTI O `'o p1 G 'a STAPLE PATTERN D =I ✓ 50 `� L� \ 175.08 "I NV 174.80 I IF- ` 52 ��3 - _ 001 001 001 001 p '>> LOC z ` ♦ �� 51 / , vo PIPE 3 rTl �, J 70, 40.00 LF @ 0.62% Cf, o = ���, 1$" CLASS V RCP DETAILED y I SILT FENCE Tye 1�a ♦ D n < O (TYP, / 9SF���B INV 174.55 ' GRADING AND r i ♦ - - RIP RAP DISSIPATER 175.07 r� ♦ ♦ �a, _ I L=9' W=4.5'/10.5' EROSION CA I Ds�8" Dr12" STOCKPILE o CLASS B 18" THICK / / DITCH#122 <9g • AREA J TEMPORARY SKIMMER BASIN #2 2' DITCH / ^ TO BE SEEDED CONTROL PLAN _ �� O ! � � • � � v LSIDE'S OPES'=D2:1 ' BOTTOM � � � WITHIN 7 DAYS I ati 1`+ ♦ 'pro TOP OF BASIN: 175.00' cA CA 2 \ BOTTOM OF BASIN: 172.00' / I ♦ � / 10' EMERGENCY SPILLWAY: 174.00' / ! DITCH #13 CLIENT INVERT OF SKIMMER: 172.00' / TO BE REINFORCED �s� ♦ • TEMPORARY SKIMMER BASIN 1 n WITH NAG S75 MATTING # SIDE SLOPES OF BASIN ARE TO / # # 18g L=80', W=40', D=3' 1/ BE SEEDED WITHIN SEVEN DAYS. / DITCH 22 DITCH 23 STAPLE PATTERN D TO BE REINFORCED TO BE REINFORCED �' v` �' �' IMMEDIATELY UPON TRIANGLE LAND � � SIDE SLOPES= 2:1 or '**ATTACH A 2.0" FAIRCLOTH SKIMMER (OR EQUAL) ^�/ a WITH NAG S75 MATTING WITH NAG S75 MATTING TOP OF BASIN: 185.00' 0`� / ` WITH 1.4" ORIFICE FOR DEWATERING THE BASIN REMOVAL STAPLE PATTERN, D STAPLE PATTERN D �� ■ �� BOTTOM OF BASIN: 182.00' SEDIMENT BASIN DURING CONSTRUCTION. '� DITCH #24 8' EMERGENCY SPILLWAY: 184.00' I� LO — '�'�`" _ TO BE REINFORCED INVERT OF SKIMMER: 182.00' __- �- 44 � / �,4� PARTNERS, LLC 193 91. WITH NAG S75 MATTING,, SIDE SLOPES OF BASIN ARE TO � STAPLE PATTERN D �Q. � \ BE SEEDED WITHIN SEVEN DAYS. HARRIETTE COURT Im I ' **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) / I� 1g9 50' R/W (PUBLIC & UTILITY ACCESS) 192.98 191.35 �^ " � ���o7Sp WITH 1.4" ORIFICE FOR DEWATERING THE - \ / SEDIMENT BASIN DURING CONSTRUCTION. \ *MATT FLOW PATH THRU7 195 o ( 190.35 �� r�\\ .1•\ '� *ALL DIVERSION BERMS TO BASIN AFTER BASIN AREA Q. / _ _ 192.04 / S,k�O SILT FENCE IS RECLAIMED . .,� . . _ . � . . — . ) BE SEEDED WITHIN 7 DAYS C _ [O L _AS y OUTLET (v. I PO Box 5548 DITCH #26 —10' UTILITY EASEMENT 2' DITCH �� • SILT FENCE TO BE REINFORCED DITCH #25 1 OTTOM �. �.�� �! ) / / o OUTLET \ \ Cary, North Carolina 27512 WITH NAG S75 MATTING TO BE REINFORCED ( o . �Oe \ > RIP RAP DISSIPATER Phone: (704) 608-3085 WITH NAG S75 MATTING - ° L L=3' W=1' 3' STAPLE PATTERN D � ,`p� � I / STAPLE PATTERN D \ \ J Dw--8" D.Ax=12" CSC �C� �p0 `��� G CLASS B 18" THICK / RIP RA3P =1'/3TER *MATT FLOW PATH THRU L a CLASS B 18" THICK BASIN AFTER BASIN AREA PROJECT INFORMATION ^�h CHECK DAM IS RECLAIMED l ■ WITH WEIR ° (TYP) ` (- I DESIGNED BY: BRETT o • DRAWN BY: BRETT �J 0 CHECKED BY: SCOTT / f , 64178 * PROJECT NUMBER: 2006 C_ w �� � 43 U 'mil 17 178 . DRAWING SCALE Z L / o \ l ( _ >>3 • �M HORIZONTAL: 1"=60' 01 I DATE RELEASED o (� f� � u o �� e` / (' , r DECEMBER 6, 2023 .�� ��� ✓/ r �--- I `J_'� > 1`�1-� GRAPHIC SCALE Q i r '�. l\/ I N/F �, / \, \~ �\ "_ �a� / l 60 o so 60 120 240 SENTER FAMILY REAL ESTATE LLC �o I SHEET NUMBER `L /L \ STEPHENS PLACE OF DB 1876, PG 256 \ Know whafs below. a Call before you dig. ( IN FEET ) Y g 1 inch = 60 ft. _ 302 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1 -800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED