Loading...
HomeMy WebLinkAbout090040_POA for high freeboard_20231219��l �.i�.� �.�_ ,y�� ��.;�� iF•�,���n..; F�.�r I-I�Gi-I �=I='�� L.,U;�F-'.L.� /�;T r�^�II`�i'1L F,�c,'!t.�-r�Fti Facility Number: Facility Name: /i ¢ HDq F6-i( '1 Certified Operator Name: County: B �Dt�,)1 Operator # Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways, Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure a Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. V Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the Information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. (print) Phone: qio '*614, �'q11 Date: I A I I g JA It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: A & H Hog Farm 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line m = 456.7 lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN 456.7 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# p. field # q. crop r. acres s.remaining IRR-2PAN balance (Ib/acre) t.TOTALPAN BALANCEFOR FIELD (lb&) wlumn rxs u. applicatim WjndOW 3235 1 overseed 4.64 50.00 232.0 Sept -April 3235 2S overseed 1.11 50.00 55.5 Se t-A hl 3235 2W overseed 2.38 50.00 119.0 Se t-A dl 32351 3N overseed 2.83 50.00 141.5 Se t-A ril 3235 3S overseed 1.62 50.00 81.0 Sept -April 3235 4N overseed 0.78 50.00 39.0 Sept -April 3235 4S overseed 1.07 50.00 53.5 Sept -April 3235 5N overseed 2.83 50.00 141.5 Sept -April 3235 5S overseed 4.76 50.00 238.0 Se t-A dl 3235 1 overseed 4.64 50.00 232.0 Mar - Se t 3235 2S overseed 1.11 50.00 55.5 Mar - Se t uestimate on PAN left***** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1388.5 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 456.7 lb. PAN x. Crop's remaining PAN balance (line v from section 111) 1388.5 lb. PAN y. Overall PAN balance (w -x) = .932 lb. PAN Line y must show as a deficit. If line y does not showas a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will pump as soon as conditions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): A & H Hog Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 17.0 inches 19.0 inches 2.0 inches 102856 ft2 128227 gallons 180 days g. volume of waste produced according to structural design 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/19/23 m. ((lines e + ku1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft3 0ft3 62270 ft3 228549 gallons 1.28 Ibs/1000 gal. 456.7 Ibs. PAN PoA (30 Day) 2/21/00