No preview available
HomeMy WebLinkAboutSW5231002_Email_20240117 Peck, Kaitlin From:Farkas, Jim J Sent:Wednesday, January 17, 2024 9:09 AM To:Peck, Kaitlin; Jennifer Edwards; jkscott@rtmc.net; Justin Church Cc:svc_post_construction_stormwater; Valentine, Thad Subject:RE: SW5231002; Chatham Vet Services New Bldg. (Chatham) Attachments:Cover Letter & Permit 1-17-24.pdf Good Morning, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Applica?on for the subject project on January 12, 2024. Staff review of the plans and specifica?ons has determined that the project, as proposed, will comply with the Stormwater Regula?ons set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Permit No. SW5231002, dated January 17, 2024, for the construc?on, opera?on and maintenance of the subject project and the stormwater system. This permit shall be effec?ve from the date of issuance and shall be subject to the condi?ons and limita?ons as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permi?ee, Katherine Sco?, at the following address (NOTE: An electronic version of this permit can be found in our online repository: h?ps://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): JKSCOTT, LLC A?n: Katherine Sco?, Managing Member 1751 Winfred Brady Road Benne?, NC 27208 We will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are no?ced and correc?ons need to be made) a?er which point, it will be kept on file at the Raleigh Regional Office. If you have any ques?ons, or need addi?onal informa?on concerning this ma?er, please contact us at postconstruc?on@deq.nc.gov. Thanks, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov 1 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Thursday, October 19, 2023 9:55 AM To: Jennifer Edwards <jennifer@brec.biz>; jkscott@rtmc.net; Justin Church <justin@brec.biz> Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Valentine, Thad <thad.valentine@deq.nc.gov> Subject: SW5231002; Chatham Vet Services New Bldg. (Chatham) Good Morning, We received your post-construction stormwater permit application for the subject project on 10/13/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deq.nc.gov (We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SW5231002 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construc?on Stormwater Permi?ng Group North Carolina Department of Environmental Quality postconstruc?on@deq.nc.gov 2 From: svc_post_construction_stormwater Sent: Friday, October 13, 2023 7:34 AM To: Jennifer Edwards <jennifer@brec.biz> Cc: Justin Church <justin@brec.biz> Subject: RE: \[External\] Re: Chatham Vet Services New Bldg.; Siler City, Chatham County Good Morning Jennifer, Thank you for getting back to me. I did receive your email and have voided your check and it will be sent out to the address in your signature today. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Jennifer Edwards <jennifer@brec.biz> Sent: Thursday, October 12, 2023 4:10 PM To: svc_post_construction_stormwater <postconstruction@deq.nc.gov> Cc: Justin Church <justin@brec.biz> Subject: Re: \[External\] Re: Chatham Vet Services New Bldg.; Siler City, Chatham County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. 3 The original Supplemental and new fees are going out today. I sent in a different email about the $505 check if you missed it, just mail it back to me at the address below. Thanks Jennifer Edwards Senior Civil Designer BREC , PA 1520 Meadowview Drive Wilkesboro, NC 28697 336.844.4088 (p) By receiving and accepting this electronic correspondence and using its contents the receiving parties understand that the electronic media may contain intermediate design information and may not necessarily be intended for construction. We agreeto hold BREC, PA, and Blue Ridge Geomatics, PA harmless for any defects in this data. We agree that it shall be our responsibility to reconcile this electronic data with the paper plans and that only the paper plans shall be regarded as legal documents for this job. We agree not to further distribute this electronic information to any other entities. We shall also not use this information for any other design project other than the one intended. On Thu, Oct 12, 2023 at 11:42 AM svc_post_construction_stormwater <postconstruction@deq.nc.gov> wrote: Hi Justin, On your application, the total impervious surface area is listed as 23,502 sf (approx.. 0.54 ac). Please see the attached file with how to calculate density for further information. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov 4 From: Justin Church <justin@brec.biz> Sent: Thursday, October 12, 2023 11:26 AM To: svc_post_construction_stormwater <postconstruction@deq.nc.gov> Cc: Jennifer Edwards <jennifer@brec.biz> Subject: \[External\] Re: Chatham Vet Services New Bldg.; Siler City, Chatham County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Can you please clarify how our %impervious is calculated incorrectly? The 1.65 acre site contains 0.63 acres of impervious = 38%. Thanks. /jc ------------------------------------------------------------------ Justin Church, PE Principal Engineer BREC, P.A. 1520 Meadowview Drive Wilkesboro, NC 28697 (o) 336.844.4088 (c) 828.773.6543 http://brec.biz 5 On Thu, Oct 12, 2023 at 11:16 AM svc_post_construction_stormwater <postconstruction@deq.nc.gov> wrote: Good Morning, We received your application for a new post-construction stormwater permit on 10/11/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 11/11/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section 12.14(e)(2)):  Please be aware that, effective October 3, 2023, our permit application fee structure is as follows:  New Permit or Major Modification for a project with one (1) or fewer SCMs = $1,000  New Permit or Major Modification for a project with two (2) SCMs = $1,250  New Permit or Major Modification for a project with three (3) SCMs = $1,750  New Permit or Major Modification for a project with four (4) or more SCMs = $2,250  Minor Modification = $250  Renewal = $750  Transfer = $750  Renewal & Transfer Combination = $1,500  General Permit = $700  Per the submittal items, this project will require an application fee of $1000 as this application is for a New Project with 1 SCM. Please provide a new application fee check in this amount so that we may process your application. We will void and return the provided application fee check to the permittee (unless a different return address is indicated by close of business tomorrow).  2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application):  Section IV, 8 – The percent impervious area for the project area does not appear to be calculated correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1).  1x hard copy of the complete, original Supplement-EZ Form (This item is required per Sections V & VI, 3 of the Application). This form can be found on our website at the following address: https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: The copy we received did not bear an original signature. 6 NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deq.gov or at (919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov 7 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 8