HomeMy WebLinkAboutTroutWS Form Dallas E Fork 011624State of North Carolina
Department of Environmental Quality
Division of Water Resources
15A NCAC 02H .0506(b)(4) Water Quality Certification,
Notification of Work in Trout Watersheds
FORM: TroutWS 11-2017
Water Resources
Environmental Quality
Notification of Work in Trout Watersheds Form
A. Applicant Information
1. Processing
1a. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 4245
1b. Has the NWP or GP number been verified by the Corps? Yes No
1c. Does the project meet all the Conditions of the applicable Water Quality
Certification Yes No
Please note that your project may be subject to the Sediment and Erosion Control Program and/or Trout Buffers
implemented by the Division of Energy, Mineral, and Land Resources. Find more info at:
https://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control
2. Project Information
2a. Name of project: East Fork Pigeon River Stabilization
2b. County: Haywood
2c. Nearest municipality / town: Cruso
3. Owner Information
3a. Name(s) on Recorded Deed: John D. Dallas, Laura Dallas
3b. Responsible Party (for LLC if
applicable):
3c. Street address: 238 Stebbins Ter. SE
3d. City, state, zip: Pt. Charlotte, FL 33952
3e. Telephone no.: 941-380-7075
3f. Email address: Jdmm4u@gmail.com
4. Agent/Consultant Information (if applicable)
4a. Name: Andrew Bick, PE
4b. Business name
(if applicable): Headwaters Engineering, PC
4c. Telephone no.: 828-606-0306
4d. Email address: andrew@headwaters-eng.com
B. Project Information
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): 8662-34-9579
1b. Site coordinates (in decimal degrees): Latitude: 35.405934 Longitude: - 82.813083
(DD.DDDDDD) (-DD.DDDDDD)
2. Project Description
2a. Explain the purpose of the proposed project (continue on back):
The purpose of the project is to stabilize localized sections of the left descending bank that were damaged during Tropical Storm
Fred.
2b. Describe the overall project in detail, including the type of equipment to be used:
The bank will be sloped at roughly 2.5:1 using a track mounted excavator operating from the top of bank. The sloped bank
will be seeded, mulched and covered with coir matting, and will be live-staked during the following dormant season with
native shrubs. The total bank length to be stabilized will not exceed 99 linear feet. Work will be scheduled outside of the
trout moratorium (April 15 to October 15).
C. Stream Impacts: Please list all proposed impacts to the stream
1a. Stream Name: East Fork Pigeon River.
1b.
Type of impact
Average stream
width (linear feet)
Impact length
(linear feet)
Bank Stabilization - Sloping and Revegetating 63 99
Bank Stabilization - Sloping and Riprap/Armoring
Bank Stabilization - Gabion Baskets / Retaining Wall
Culvert Installation Culvert Diameter: ______________
Temporary Impacts for required dewatering activities
Other (describe): ____________________________________________
1c. Comments:
Andrew Bick
Owner/Agent's Printed Name
Owner/Agent's Signature
(Agent's signature is valid only if an authorization letter from the owner is
provided.)
1/16/24
Date