Loading...
HomeMy WebLinkAboutNCC205305_Annual Fee NOD Letter (2023 Fee)_20240116 a ROY COOPER Govemor ELIZABEIH S.BISER �. Srecretruy WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Intern"Director EnWonmenta(Qual ty 1/16/2024 City of Greensboro Attn:Jason Geary Post Office Box 3136 Greensboro, NC 27402-3136 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC205305-2023 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 12/1/2023 and was due on 1/1/2024.The annual fee applies to the following construction site: NCC-GUILF-2021-Contract 2018-051A, Davie Street Streetscape Improvements 200 N.to 339 S. Davie Street, Greensboro, NC Guilford County Certificate of Coverage No. NCC205305 NC Reference No. NCG01-2020-5305 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact me at toby.vinson@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Interim Director Division of Energy, Mineral,and Land Resources D_E Q� Nrnlh Cara7ina Deparlmenl of Cnvroament:J Qwlily Drvisirr ul Cnrryy.Mineral urwl Lancf Frsorrccs Sl2 Nur R,Salisbury Slrrel I Iol2 Mail Se s,ceCmter Rork iyh.Nurlh Caroline Tiboo I612