Loading...
HomeMy WebLinkAboutNCC240054_ESC Approval Submitted_20240112 TTown of• 1 n e e NORTH CAROLINA December 29, 2023 LETTER OF APPROVAL —EROSION CONTROL PLANS Suriano Homes, Inc. ATTN: Lorelle Bell 201 W. Isle of Palms Ave. Myrtle Beach, SC 29577 RE: Project Name: Barnette Property Farmhouse Cluster Disturbed Acres Approved: +/-9.30 acres Project ID: SUB-443542 County: Mecklenburg City: Huntersville Address: 14544 Beatties Ford Road River Basin: Catawba River Basin Stream Classification: WS-IV Submitted By: Suriano Homes Date Accepted for Review: Nov 28, 2022 Plan Type: Residential, Farmhouse Cluster Subdivision Dear Lorelle Bell, Suriano Homes, Inc., This office has reviewed the subject preliminary plan including the erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval as Noted. Please note that as this plan was stamped outside of the review system County Fire approval is not included. Please consult with County Fire to ensure the approved package is compliant with County Fire. The Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the applicable annual Letter of Approval Lorelle Bell, Suriano Homes, Inc. December 29, 2023 Page 2 of 3 permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details maybe accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. No work shall begin on site prior to the pre-construction meeting. To schedule a pre- construction meeting please email a copy of the Recorded PCO19 if applicable and your NCG01 Certificate of Coverage (COC) from NCDEQ to aloftin@huntersville.org.After documents are reviewed,the meeting will be coordinated. Please refer to the attached Fact Sheet for additional information. Letter of Approval Lorelle Bell, Suriano Homes, Inc. December 29, 2023 Page 3 of 3 The Financially Responsible Owner (FRO) is responsible for ensuring this project meets all federal, state, and local town codes, ordinances, and standards. Approved and stamped plans are accessible through the "Approved Package" section in EPM for print. Please always keep one set of stamped plans onsite. Your cooperation is appreciated. Sincerely, Eian Fowler, PE Engineering Project Manager Enclosures: e-NOI Tips for Applicants NPDES NCG01 Fact Sheet Huntersville Sediment and Erosion Control Ordinance cc: Town of Huntersville Planning Department-Lauren Speight Town of Huntersville Engineering-Eian Fowler,PE Town of Huntersville Construction Engineer-Kevin Garton Town of Huntersville Erosion Control Coordinator-Anne Loftin Town of Huntersville Executive Assistant Engineering-Jane Pethel Town of Huntersville Land Development Inspector-Cecil Talbot Town of Huntersville Bond Administrator-Kim Behrenbrinker North Carolina Department of Transportation-Kimberly Boik Mecklenburg County GIS-Angela Johnson Developer Company-Suriano Homes File Path: M:\PLANNING\Subdivisions\_Farmhouse Clusters\Barnette Farmhouse Cluster(14700 Beatties Ford Rd)\FC Plan(SUB-443542)\Approved Package#SUB-443542