HomeMy WebLinkAboutNC0003298_Compliance Evaluation Inspection_20231130DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 1311 F847A2
ROr COOPER
ELIZABETH S. BISER
RICHARD E. ROGERS, JR.
NORTH CAROLINA
Director
Environmental Quality
December 06, 2023
Stephen Greer, PhD
International Paper Company
865 John L Riegel Rd
Riegelwood, NC 28456
SUBJECT: Compliance Inspection Report
Riegelwood Mill
NPDES WW Permit No. NC0003298
Columbus County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Riegelwood Mill on
11/30/2023. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NC0003298. The findings and comments
noted during this inspection are provided in the enclosed copy of the inspection report entitled
"Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required. If you should have any questions, please do not hesitate to contact Bryan
Lievre with the Water Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215
or via email at bryan.lievre@deq.nc.gov.
Sincerely,
C
DocuSigned by:�"W►n (� 5ol�,� j ,ry,-6,
8554BOF62D ED464...
Morelia Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
Attachment
Cc: Wallace Coverdale (via email WaIlace. Coverdale@ipaper.com)
Upload to Laserfiche
Nwth Carolina Otpao—t orEnvlronmenlal Qa Ilty I [AMsion J Watee Rew—s
Wilmington Reglanalow-I 12ICaMIna1Dr1ve Eetenslan I W.Wng10 North Ca 11l a25495
91619b ]215
DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 B11 F847A2
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 1 3 I NC0003298 I11 121 23/11/30 I17 18 n 19 L G j 201
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 CA ---------------------- Reserved -------------------
67
I 71 I I 72 L n, � 73 LLI74 71 I I I I I I I80
70 Iu ty LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
08:30AM 23/11/30
19/11/01
Riegelwood Mill
865 John L Reigel Rd
Exit Time/Date
Permit Expiration Date
Riegelwood NC 28456
12:15PM 23/11/30
23/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Patricia Coleman Soles/ORC/910-362-4729/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Stephen Greer,865 John L Riegel Rd Riegelwood NC 28456//910-362-3476/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispos Facility Site Review Compliance Schedules
Effluent/Receiving Wate 0 Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
Bryan Lievre $ "zt DWR/WIRO WQ/910-796-7215/ 12/6/2023
31BDD428
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
DocuSigned by. morella.sanchez-king@deq.nc.gov 12/6/2023
L-8 5gg OF62DED464... V
EPA Form 3560-3 (Rev 9-94� F'reVious editions are obsolete.
Page#
DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 1311 F847A2
NPDES yr/mo/day Inspection Type (Cont.)
31 NC0003298 I11 12I 23/11 /30 117 18 ICI
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
A routine compliance inspection of the Riegelwood Mill Wastewater Treatment Plant (WWTP) was
performed on November 30, 2023. The purpose of the inspection was to verify that the facility is
operating in compliance with the conditions and limitations specified within Permit NC0003298.
Facility staff present during the inspection were Wallace Coverdale, Patricia Soles (ORC) and Colleen
Cohn. Stephen Greer, PhD, Halima Moses and Charlie Knox were also present during discussions
prior to and after the inspection of structures.
The facility is currently permitted to receive up to 50 million gallons per day (mgd) of wastewater and
has an average daily flow of 28.5 mgd since 2018. Water supply for the facility is derived from an
intake on the Cape Fear River, approximately 0.6 miles west of Outfall 001. The WWTP is a Grade 4
biological plant that has the following components:
- Dual mechanical barscreens (1 at each clarifier with bypass lines to the other clarifier)
- Two (2) primary clarifiers, each with dual sludge pumps
o Clarifier #1 is has an earthen bottom and sides and has a capacity of —9.3 MG and
typically receives flow from domestic wastewater system, storm water from the lumber
yard and other facility operations
o Clarifier #2 has a concrete bottom and sides and has a capacity of —2.3 MG and typically
receives flow from the bleach plants and stormwater from the Holtrachem site
- Nutrient addition facilities, with injection of aqueous ammonia (<20%) at up to two locations along
the clarifier effluent channel prior to the lagoon system
- 173 acres of aerated lagoons with re -circulation and —72 surface aerators (aka aerated
stabilization basin system or ASB)
o A spillway channel leading to the aerated stabilization basin (ASB) system
o New Bay
o Theodoraris (aka "Theo") Pond, —42 acres with primary aeration
o South Lagoon, —45 acres with some aeration and internal baffle wall
o North Lagoon, —32.5 acres with effluent to Outfall 001
- Six (6) sludge holding lagoons
o Ponds A, B and C which typically receive WAS from Clarifier #'s 1 & 2
o Ponds 1, 2 and 3 which typically receive secondary sludge from the ASB
- Sludge dewatering presses
- Oxygen injection facilities
- Flow measurement and equipment
Outfall 001 discharges wastewater associated with all industrial operations, landfill leachate,
stormwater, and sanitary sewer wastewater. Outfall 001 consists of a Parshall Flume and discharges
wastewater to the Cape Fear River. The facility also has two internal Outfalls. Internal Outfall 004
receives flow from Bleach Plants 1 and 2 and Internal Outfall 005 receives flow from Bleach Plant 3.
The system also has separate flow meters for Outfalls 004 and 005 upgradient of their respective
sampling locations.
The facility has not had any violations since prior to the last inspection which was performed on
12/10/2021. The staff were very knowledgeable of the facility operations and the facility seemed to
be well maintained. Records were reviewed and found to be detailed, well organized and complete.
The facility is compliant with the terms and conditions of the permit. Please review the comment
sections of the inspection report for more details.
Page#
DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 1311 F847A2
Permit: NC0003298 Owner - Facility: Riegelwood Mill
Inspection Date: 11/30/2023 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
0
❑
❑
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The current permit was issued 9/23/2019 and expired 7/31/2023. A permit renewal
application was submitted by the permittee in February 2023. Special Conditions
includes chronic toxicity sampling, effluent and fish tissue dioxin monitoring plans and
adherence to Cluster Rule BMPs for monitorina and spill prevention and control.
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
❑
❑
■
❑
■
❑
❑
❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
Page# 3
DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 1311 F847A2
Permit: NC0003298 Owner - Facility: Riegelwood Mill
Inspection Date: 11/30/2023 Inspection Type: Compliance Evaluation
Record Keeping
Yes No NA NE
Comment: On-line DMRs were viewed prior to the inspection and hard copies of DMRs for 6/23 —
9/23, random chain of custody forms, an ORC visitation log, calibration logs
for field
instruments, and a report entitled Cluster Rule Best Management Practices, dated July
2022 were viewed during the inspection.
Laboratory
Yes
No
NA
NE
Are field parameters performed by certified personnel or laboratory?
0
❑
❑
❑
Are all other pa ra mete rs(exclud ing field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
■
❑
❑
❑
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
0
❑
❑
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
0
❑
❑
❑
Comment: International Paper — Riegelwood Mill maintains certification #140 for BOD, DO, PH
TSS and temperature. The system uses a Hach 40D for DO and a Yokagawa PH72
portable PH meter. The system has also installed and is utilizing a Real -Time Tech
monitoring system in the clarifier discharge canal to assist in understanding system
characteristics prior to entering the lagoons. The system utilizes outside lab for other
analyses such as ETS for chronic toxicity, ALS Environmental for dioxins, Envirochem
for other compounds. The incubator for BOD analysis was 20.3°C the day of inspection
and calibrants for field instruments were within their respective hold -times.
Bar Screens
Yes
No
NA
NE
Type of bar screen
a.Manual
❑
b.Mechanical
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment: Prior to each bar screen, the facility has ISCO composite samplers and flow meters (for
internal use). The facility contains dual mechanical bar screens and both appear to be
operating effectively. Debris recovered from the bar screens is sent to the on -site
landfill for disposal.
Primary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑
Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑
Are weirs level? ❑ ❑ ❑
Page# 4
DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 1311 F847A2
Permit: NC0003298 Owner - Facility: Riegelwood Mill
Inspection Date: 11/30/2023 Inspection Type: Compliance Evaluation
Primary Clarifier
Yes
No
NA
NE
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the sludge blanket level acceptable?
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
❑
❑
❑
Comment: The facility has two primary clarifiers — one receiving the effluent from the three internal
bleach plants (Clarifier #2) and the other receiving effluent from other facility
operations (Clarifier #1). The primary clarifiers remove wood fibers and debris which is
returned to the mill to be pressed, dried and used for fuel or directed to sludge basins
where the sludge is dewatered and placed in the on -site landfill. Clarifier loading rates
and blanket levels are monitored by measuring amperage used by each units rake
motor amperage, with higher values indicating a higher/heavier blanket level.
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/1)
V0M. ill r•7ill rim ill I:I
Ext. Air
Surface
❑
❑
❑
■
■
❑
❑
❑
❑
❑
■
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
Comment: After primary clarification wastewater from the mill process areas is treated in the
173-acre aerated stabilization basin (ASB) system. Wastewater travels from the
Primary clarifiers to the ASB system via a canal to the "New Bay." Seventy two (72)
floating surface aerators are positioned within the 42-acre "New Bay" to provide mixing
and treatment of process wastewaters before flow is directed to the intermediate "Theo
Pond" area. Within the "Theo Pond" and "New Bay" areas of accumulated solids can
be more easily dredged for disposal. Wastewater then flows to the 42-acre "South
Lagoon" which contains five (5) surface aerators and a floating baffle curtain to
prevent short circuiting before reaching the 32.5-acre "North Lagoon". Effluent is
discharged from a gate and weir feature from the "North Lagoon" into the Cape Fear
River. The ASB system has a detention time of approximately 9 days. DO levels within
the New Bay, South Lagoon and North Lagoon were 2.6 mg/L, 3.1 mg/L and 1.8 mg/L,
respectively.
Chemical Feed
Yes No NA NE
Page# 5
DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 1311 F847A2
Permit: NC0003298
Inspection Date: 11/30/2023
Owner - Facility: Riegelwood Mill
Inspection Type: Compliance Evaluation
Chemical Feed
Yes
No
NA
NE
Is containment adequate?
0
❑
❑
❑
Is storage adequate?
■
❑
❑
❑
Are backup pumps available?
0
❑
❑
❑
Is the site free of excessive leaking?
0
❑
❑
❑
Comment: The addition of sulfuric acid, 20% ammonia solution, defoamer, bacterial cultures and
oxygen can used as needed within the treatment process. NH3 and supplemental
bacteria can be added prior to entry into New Bay. Oxygen and defoamer can be
infected into the effluent, as needed.
Compliance Schedules
Yes No
NA
NE
Is there a compliance schedule for this facility?
0 ❑
❑
❑
Is the facility compliant with the permit and conditions for the review period?
0 ❑
❑
❑
Comment:
Lagoons
Yes
No
NA
NE
Type of lagoons?
Aerated
# Number of lagoons in operation at time of visit?
4
Are lagoons operated in?
Series
# Is a re -circulation line present?
❑
0
❑
❑
Is lagoon free of excessive floating materials?
0
❑
❑
❑
# Are baffles between ponds or effluent baffles adjustable?
0
❑
❑
❑
Are dike slopes clear of woody vegetation?
0
❑
❑
❑
Are weeds controlled around the edge of the lagoon?
0
❑
❑
❑
Are dikes free of seepage?
0
❑
❑
❑
Are dikes free of erosion?
0
❑
❑
❑
Are dikes free of burrowing animals?
0
❑
❑
❑
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
❑
❑
❑
locations?
# If excessive algae is present, has barley straw been used to help control the growth?
❑
❑
0
❑
Is the lagoon surface free of weeds?
0
❑
❑
❑
Is the lagoon free of short circuiting?
0
❑
❑
❑
Page# 6
DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 1311 F847A2
Permit: NC0003298 Owner - Facility: Riegelwood Mill
Inspection Date: 11/30/2023 Inspection Type: Compliance Evaluation
Lagoons
Yes No NA NE
Comment: As mentioned above, the aerated stabilization basin (ASB) currently use 4 lagoons with
—72 floating surface aerators. There is a diversion curtain wall located in the South
Lagoon to prevent short circuiting within the basin. Accumulated material on the
bottom of the lagoons is removed as needed, typically on an annual basis. A windshield
survey of the berms for the aeration basins was performed. The northeast side of the
North Lagoon has the highest berm height. The system has taken steps to cut back
vegetation in this area, the sides appeared to be maintained and no visible seepage
was observed. The facility has also set up their own dam safety department that
regularly inspects lagoon sidewalls. The system also has six (6) sludge earthen wall
sludge lagoons (Ponds A, B, C, 1, 2 & 3).
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment: The ultrasonic effluent flow meter is calibrated at least
last calibration performed on 10/2/2023.
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
MOM kr•7k rim kI:I
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
m staff. with the
Yes No NA NE
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑
representative)?
Comment: The composite sampler at Outfall 001 was inspected and the sample tubing was found
to be clean with no kinks at the storage chamber had a dedicated thermometer which
indicated a temperature of 1 °C.
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0❑
Comment: Effluent is discharged to the Cape Fear River which is classified Class C:Swamp
waters
in the area. The facility infects oxygen at Outfall 001 to increase DO levels above 5.0
mg/L, as needed, depending on the downstream monitoring location.
Page# 7
DocuSign Envelope ID: D9885AE8-2FDC-48A8-B58D-EE1 1311 F847A2
Permit: NC0003298 Owner - Facility: Riegelwood Mill
Inspection Date: 11/30/2023 Inspection Type: Compliance Evaluation
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, ■ ❑ ❑ ❑
and sampling location)?
Comment: The downstream monitoring site is overseen by the Lower Cape Fear River Monitoring
Coalition which monitors 36 locations along the river.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: System staff monitor each process throughout the system to enable early detection
and prevention of downgradient problems.
Page# 8