Loading...
HomeMy WebLinkAboutNCC193187_NOT Closeout Documents_20240108 E ,; JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT 1°iauwa4l I ti�d;1 SEDIMENTATION INSPECTION REPORT 309 E.MARKET STREET,SMITHFIELD,N C 27577-TELEPHONE(919)209-8333 Inspection Information Date: 6/20/2023 Type of Inspection Construction Stage Date of Inspection: 6/20/2023 ❑ Initial Inspection ❑ Pre-Construction ❑ Routine Site Inspection ❑ Initial Grading Inspection by: Shannon Stanley El On-SiteMeeting ElInfrastructure • ❑ Progress Inspection ❑ Temp Site Stabilization Others Present: Click or tap here to enter ❑X Final Inspection ❑ Vertical text. Photos• ❑ Yes E No El Plat Inspection ® Final Site Stabilization • ❑ Spot Check Inspection Weather and Site Conditions: ❑ Complaint Inspection Click or tap here to enter text. Development/Owner Information Project Name: McGees Crossing Project Number: 19-139-P Project Location: Whittington Rd This Report Sent To: Stewart Poulson Email: Click or tap here to enter text. ❑ File Copy Land Owner of Record: Person Financially Responsible for Land Disturbing Activity: ❑ Same as owner All homes sold Click or tap here to enter text. 6. Comments/Notes: The Johnston County erosion control permit for project above is closed.