Loading...
HomeMy WebLinkAboutNCC230261_NOT Closeout Documents_20240105 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Johnston Project: Eva Ennis Walking Trail-Phase 2 River basin: Neuse Person financially responsible:Town of Smithfield-Stephen Wensman,Planning Project#: JOHNS-2023-023 Director Address: PO Box 761,Smithfield,NC 27577 1. Project Location: Martin Luther King Jr Drive, Smithfield Pictures: No 2. Weather and soil conditions: sunny,dry,workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: November 13,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Tyler Hufnal Others present: Date of inspection: November 08,2023 Time arriving on site: 11:40 AM Time leaving site: 12:05 PM CC: