HomeMy WebLinkAboutSAW-2023-02022 Permit Verification_20231207DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, WILMINGTON DISTRICT
ASHEVILLE FIELD OFFICE
151 PATTON AVENUE ROOM 208
ASHEVILLE NORTH CAROLINA 28801
December 7, 2023
CESAW-RG-A
Jonathan Pearson
Slick Rock Mountain Property Owners, Inc.
649-725 Lake Road
Brevard, NC 28712
Dear Mr. Pearson:
This letter is in response to the Pre-Construction Notification (PCN) you submitted to
the Wilmington District, Asheville Field Office on October 16, 2023, for a Department of
the Army Nationwide permit (NWP) verification. This project has been assigned the file
number SAW-2023-02022 and is known as Upstream Slope Repairs at Slick Rock
Mountain Dam. This file number should be referenced in all correspondence concerning
this project.
A review of the information provided indicates that the proposed work would include
the repair of a failed 250-foot (0.06 acre) section of the upstream slope of the Slick Rock
Mountain Dam by excavating a bench-cut and placing riprap. The project area for this
determination includes a 0.16 acre(s) area which is illustrated on the enclosed site
plans/maps. The project/review area is located near 649-725 Lake Road, at Latitude
35.162100 and Longitude -82.704400; in Brevard, Transylvania County, North Carolina.
Note, per email communication with the North Carolina Wildlife Resources
Commission (NCWRC) dated November 15, 2023, the trout moratorium has been
waived for this project.
We have determined that the proposed work is authorized by NWP 3 pursuant to
authorities under Section 404 of the Clean Water Act (33 U.S.C. § 1344). The proposed
work must be accomplished in strict accordance with the general permit conditions, any
regional conditions, the application materials, and the enclosed plans. If the extent of
the project area and/or nature of the authorized impacts to waters are modified, a
revised PCN must be submitted to this office for written approval before work is initiated.
Any violation of permit conditions or deviation from your submitted plans may subject
the permittee to enforcement action.
This verification is valid until March 14, 2026, unless prior to this date the subject
NWP(s) is suspended, revoked, or is modified such that the activity no longer complies
with the terms and conditions of this NWP. If you commence or are under contract to
commence this activity before the date that the relevant NWP is modified or revoked,
you will have 12 months from the date of the modification or revocation of the NWP to
complete the activity under the present terms and conditions of this NWP.
Activities subject to Section 404 (as indicated above) may also require an individual
Section 401 Water Quality Certification. You should contact the NC Division of Water
Resources (telephone 919-807-6300) to determine Section 401 requirements.
This NWP verification does not preclude the necessity to obtain any other Federal,
State, or local permits, licenses, and/or certifications, which may be required.
If you have any questions related to this verification or have issues accessing
documents referenced in this letter, please contact Shannon Healy, Regulatory
Specialist of the Asheville Field Office at 828-271-7980 ext. 4233, by mail at the above
address, or by email at shannon.healy@usace.army.mil. Please take a moment to
complete our customer satisfaction survey located at
https://regulatory.ops.usace.army.mil/customer-service-survey/.
Sincerely,
Shannon Healy
Regulatory Specialist
Enclosures
Cc (w/enclosures)
Terry E. Allen, PE, T.E. Allen Engineering, PC (via email)
Joey Winston, NCDWR (via email)
Andrea Leslie, NCWRC (via email)
General Conditions (33 CFR PART 320-330):
1. The time limit for completing the work authorized ends on March 14, 2026.
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good faith
transfer to a third party in compliance with General Condition 4 below. Should you wish
to cease to maintain the authorized activity or should you desire to abandon it without a
good faith transfer, you must obtain a modification of this permit from this office, which
may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this
office of what you have found. We will initiate the Federal and state coordination
required to determine if the remains warrant a recovery effort of if the site is eligible for
listing in the National Register of Historic Places.
4. If you sell the property associated with this permit you must obtain the signature
of the new owner on the transfer form attached to this letter and forward a copy to this
office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you
must comply with the conditions specified in the certification as special conditions to this
permit. For your convenience, a copy of the certification is attached if it contains such
conditions.
6. You must allow a representative from this office to inspect the authorized activity
at any time deemed necessary to ensure that it is being or has been accomplished in
accordance with the terms and conditions of your permit.
Commencement Notification Form
Action ID Number: SAW-2023-02022 County: Transylvania
Permittee: Slick Rock Mountain Property Owners, Inc., Jonathan Pearson
Project Name: Upstream Slope Repairs at Slick Rock Mountain Dam
Date Verification Issued: 12/7/2023
Project Manager: Shannon Healy
Upon commencement of the activity authorized by this permit, sign this certification and
return it to the following address:
US ARMY CORPS OF ENGINEERS
Wilmington District
Attn: Shannon Healy
Asheville Field Office
151 Patton Avenue Room 208
Asheville, North Carolina 28801
or
shannon.healy@usace.army.mil
828-271-7980 ext. 4233
Please note that your permitted activity is subject to a compliance inspection by a U. S.
Army Corps of Engineers representative. Failure to comply with any terms or conditions
of this authorization may result in the Corps suspending, modifying or revoking the
authorization and/or issuing a Class I administrative penalty, or initiating other
appropriate legal action.
Construction Start Date: ______________________
__________________________________ ______________________
Signature of Permittee Date
Compliance Certification Form
Action ID Number: SAW-2023-02022 County: Transylvania
Permittee: Slick Rock Mountain Property Owners, Inc., Jonathan Pearson
Project Name: Upstream Slope Repairs at Slick Rock Mountain Dam
Date Verification Issued: 12/7/2023
Project Manager: Shannon Healy
Upon completion of the activity authorized by this permit and any mitigation required by
the permit, sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
Wilmington District
Attn: Shannon Healy
Asheville Field Office
151 Patton Avenue Room 208
Asheville, North Carolina 28801
or
shannon.healy@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S.
Army Corps of Engineers representative. Failure to comply with any terms or conditions
of this authorization may result in the Corps suspending, modifying or revoking the
authorization and/or issuing a Class I administrative penalty, or initiating other
appropriate legal action.
I hereby certify that the work, and mitigation (if applicable), authorized by the above
referenced permit has been completed in accordance with the terms and conditions of
the said permit including any general or specific conditions.
Date Authorized Work Started: ___________ Completed: ___________
Describe any deviations from permit (attach drawing(s) depicting the deviations):
______________________________________________________________________
______________________________________________________________________
*Note: The description of any deviations on this form does not constitute approval by the Corps.
__________________________________ ______________________
Signature of Permittee Date
REPAIRS TO SLICK ROCK MOUNTAIN DAM
C Copyright 2023 TERRY E
ALLEN ENGINEERING, PC.
All Rights Reserved Worldwide.
UP
S
T
R
E
A
M
S
L
O
P
E
R
E
P
A
I
R
S
a
t
SL
I
C
K
R
O
C
K
M
O
U
N
T
A
I
N
D
A
M
Sl
i
c
k
R
o
c
k
M
o
u
n
t
a
i
n
P
r
o
p
e
r
t
y
O
w
n
e
r
s
,
I
n
c
64
9
-
7
2
5
L
a
k
e
R
o
a
d
B
r
e
v
a
r
d
,
T
r
a
n
s
y
l
v
a
n
i
a
C
o
u
n
t
y
,
N
C
St
a
t
e
I
D
#
T
R
A
N
S
-
0
3
0
³
C Copyright 2023 TERRY E
ALLEN ENGINEERING, PC.
All Rights Reserved Worldwide.
UP
S
T
R
E
A
M
S
L
O
P
E
R
E
P
A
I
R
S
a
t
SL
I
C
K
R
O
C
K
M
O
U
N
T
A
I
N
D
A
M
Sl
i
c
k
R
o
c
k
M
o
u
n
t
a
i
n
P
r
o
p
e
r
t
y
O
w
n
e
r
s
,
I
n
c
64
9
-
7
2
5
L
a
k
e
R
o
a
d
B
r
e
v
a
r
d
,
T
r
a
n
s
y
l
v
a
n
i
a
C
o
u
n
t
y
,
N
C
St
a
t
e
I
D
#
T
R
A
N
S
-
0
3
0
C Copyright 2023 TERRY E
ALLEN ENGINEERING, PC.
All Rights Reserved Worldwide.
UP
S
T
R
E
A
M
S
L
O
P
E
R
E
P
A
I
R
S
a
t
SL
I
C
K
R
O
C
K
M
O
U
N
T
A
I
N
D
A
M
Sl
i
c
k
R
o
c
k
M
o
u
n
t
a
i
n
P
r
o
p
e
r
t
y
O
w
n
e
r
s
,
I
n
c
64
9
-
7
2
5
L
a
k
e
R
o
a
d
B
r
e
v
a
r
d
,
T
r
a
n
s
y
l
v
a
n
i
a
C
o
u
n
t
y
,
N
C
St
a
t
e
I
D
#
T
R
A
N
S
-
0
3
0
UPSTREAM SLOPE REPAIRS at
SLICK ROCK MOUNTAIN DAM
Slick Rock Mountain Property Owners, Inc
649-725 Lake Road
Brevard, Transylvania County, NC
State ID # TRANS - 030
C
C
o
p
y
r
i
g
h
t
2
0
2
3
T
.
E
.
AL
L
E
N
E
N
G
I
N
E
E
R
I
N
G
P
C
.
Al
l
R
i
g
h
t
s
R
e
s
e
r
v
e
d
Wo
r
l
d
w
i
d
e
.