Loading...
HomeMy WebLinkAbout20150950 Ver 1_Riparian Buffer Authorization_20150911Dr,,State 2 of North Carolina , �" 0 1 5 0 9 5 ODepartment of Environment and Natural Resources D on hrW of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10 -2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1a. Name of project: Sister's Cove - Phase V - Community Dock Access Path 1 b. County: Iredell 1c. Nearest municipality: Mooresville 1 d. Subdivision name: Sister's Cove 1e. Is the project located in any of North Carolina's ❑ Yes ® No twenty coastal counties. If yes, answer If below. 1f. Is the project located within a NC Division of Coastal ❑ Yes ® No Management Area of Environmental Concern (AEC)? 2. Owner Information 2a. Name on Recorded Deed: 2b. Deed Book and Page No. 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 2d. Responsible Party 4f. (for Corporations): 2e. Street address: 2f. City, state, zip: 2g. Telephone no.: 2h. Fax no.: 2i. Email address: Sister's Cove Of LKN, LLC 2297/193 63/11 Nest Homes, LLC PO Box 3965 Mooresville, NC 28117 704 - 433 -9947 n/a mwetter @nesthomes.com 3. Applicant Information (if different from owner) 3a. Applicant is: ® Agent ❑ Other, specify: 3b. Name: Michael Wetter 3c. Business name Nest Homes, LLC 4e. (if applicable): 4f. 3d. Street address: PO Box 3965 3e. City, state, zip: Mooresville, NC 28117 3f. Telephone no.: 704 - 433 -9947 3g. Fax no.: n/a 3h. Email address: mwetter @nesthomes.com 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name (if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: /nom (tz)- /VU/ tNR tn. 1 1015 A FORM: BA 10 -2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 4648489059000 1 b. Site coordinates (in decimal degrees): Latitude: Longitude: - 35.626116832203465 80.86809754371643 1c. Property size: .263 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Lake Norman 2b. Water Quality Classification of nearest receiving water: CA 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: New homes are being built on site and a new community dock is going to be constructed. We need to install a ADA access to the dock. 3b. Attach an 8 '/ x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3e. Explain the purpose of the proposed project: To install ADA access to the proposed community dock 3f. Describe the overall project in detail, including the type of equipment to be used: A 5 ft. wide concrete path or wooden boardwalk with 1/4 gaps shall be constructed down the edge of lot #24, along the lake to the proposed dock. This work shall be performed with a track unit skid steer and wheelbarrows. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ❑ Yes ® No ❑ Unknown Corps or State been requested or obtained for this property/ Comments: project (including all prior phases) in the past? 4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company: Name (if known): Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been, requested or obtained for this ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? 5b. If yes, explain and detail according to "help file" instructions. Shoreline stabilization permits have been obtained 6. Future Project Plans 6a. Is this a phased project? ( ❑ Yes ® No 6b. If yes, explain. FORM: BA 10 -2013 Page 2 of 4 a C. Proposed Impacts Inventory 1. Buffer Impacts 1a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ® Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ mitigation) required? (sq ft) (sq ft) or Temporary (T) B1 ® P ❑ T ADA access path allowable ❑ Yes ® No 780 100 B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization I 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. We have chosen the most direct path for the ada access 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. silt fence will be installed along wall during excavation for sidewalk and all work that can be completed by hand will be done to minimize the use of equipment within the buffer zones. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer I ❑ Yes ® No mitigation? 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a I ❑ Yes ❑ No mitigation bank or NC EEP proposed? 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10 -2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. If due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form. F. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal /state /local) funds or the use of ❑ Yes ® No public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B.0200)? 2b. Is this an after - the -fact permit application? I ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): FORM: BA 10 -2013 Page 4 of 4 " J. Michael Wetter Jr. ~- "`�'I� _9/3/15 Applicant/Agenfs Signature Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter from the applicant is provided) Date Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent For government transportation projects sent by First Class Mail via the US Postal Service: by delivery service (UPS, FedEx, etc.): NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 For all other projects sent by First Class A4ail For all other projects sent by delivery service via the US Postal Service (UPS, FedEx, etc.): Karen Higgins OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM: BA 10 -2013 Page 4 of 4 M. v WIRM I = 113W mvra 0 :N AREA EASEPiE1riT = 3,488 acres EA BUFFER = 1.680 am 3 acres total s64A.4N -6115 �R 451 ��� o tl � •1a.s;' Tf, p�yt• .Jy� ,rya ' �OJ. •� pd Y I / / cq� V.1-9r, is CO CA woo f 0 uo9 � •57'1if _ t l.� 0# b P A ss+a, 01 . 17,243.45 sq. R. ,; \ � Nm m►rrmn- o I®1 0.396 ace "+ ; 5$J46196Y FIN: 4W-4"336 + /� IP•6B8,Q9a•08 DUKE DIERGY CO2POPAI ON LANE NORM$ r r� r r r ; rte_ l r�i �.2s• !r f lie M881 ' MNIMUM 9UILDING SM*= LM �Q EIR - EXM77NG IRON AEBAR HP - ENiSTIMG CRON PIPE Cc - ONMOL OWNER CAB - OOMM ON AREA SUFFER / CSF - COmBNON serm IASEMEIIr % 081. • OWERMEAD 86lMX LINE i NTS - ITT TO SCAII r' TP -TELM ONEPEDESUL SE - Ur X 717 STGW EASB18Mr SP - SEPTIC PUMP ENl i vQr PO%WFOLE OWE ENERGY CORPORAMN Contour j t.tGMT POLE UYa NORIaw WELL 30,261 i • COMPUTED POINT LAKE NORMAN OWNER /DEVELOPER -'� S1SI- DOVE OF IKN, LLC P. 0. Boot 3965 MOORESIALLE. NC 28117 -3965 tat a WIQat11e Arc* CSE CA$ J REVIWON OF , ult 7 7,751• � R 0.167 acre 5,751" So. ft (1.i2A aae NODE SISTERS COVE -- PHASE V 6s aq ft. ,r' t.a 8 5,9�J, 6.116 aoe 7.76).98 so• R • O•oa ane 2,1105,91 90• ft. - 0,061 acre r' ILat9 7AM.32 M ft. -0.181 acre 1,631.95 SQ. a. - 0.031 oar 0,093.86 $Q. ft. - U" acm AS RECOROEO IN P.B. 61. PG. 123 �LOt 10 6,787.61 sq. ft. - 0.156 acre 2,315.67 sw R -O.OS3 ace 4,852.54 mq. R. - 0.111 ace OYVJIO6011 TOWN" RMELL OOIMY arwtu rl•ro am URS DiT = 2.585 am A ENT = 3.488 acres ER =1.680 acres total A 4 5' R l� tl 310.95 Q • ��• . a 0 Pqi 2 N Y V 17,243.45 0.396 acre j ODi: 4648-49&9136 " 'da' O Is ® r , E910" 76{ ODUE BOW4V CQWOIUTMN Goner �� � unr.am•e�u , Ode / 2 ACcess To Dolt - DUKE 00" OOIPORATION ; LANE MOW" F5 ENT 0---. I np=aft .33 50