Loading...
HomeMy WebLinkAbout310181_Compliance Evaluation Inspection_20231219_: .:_ Dtvas�ouof Wafetr I2�sources _ aerlity Numbed : 3 l \ Dam on of Sorl aid Water ,c serration = _ 0 Other:agency =` Type of Visit: &Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: E= County: Farm Name: 1� e�Y►w Tina. ���,� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Region: Facility Contact: jt.�� v%—u !�� �., Title: Phone: �l I �c'i t, p 3 Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: 7`L S Longitude: _� -� Design �C r n-Pr1Desgu xUm Curaremf� _design Current twine' Capacnty Popes Wet I oultry Capae�ty Pop Cattle Capacity _. Wean to Finish Layer Wean to Feeder 3 �j � Non -Layer Feeder to Finish Farrow to Wean n. - ' . F De�rgn Cnrirent Farrow to Feeder `Dry Poultry. , .`Capacity Eo Farrow to Finish c Giltse . . Boars I_ ioyy 3� Offer s Layers Non -Layers Pullets Turkeys Turkey Pouets Other Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non-Dai Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No E 1�1A ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑.NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No �NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes WNo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facility Number: 3 1 - 1 Date of Inspection: I I- 1 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No E2 A ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ZNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ZrN0 ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes EKO ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes EX ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ETNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E2�4 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ©'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? Yes ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable YesE-fT'o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes EQKgo ❑ NA ❑ NE ❑ Yes To ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes �To ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes YNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the ropriate box below. ❑ Yes ❑ No ❑ Waste Application ❑ Weekly Freeboard aste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ®'No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes dNo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: -3 Date of Inspection: y 2 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Ea o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No YNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes F]] No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes J No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ar!�Al NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [� ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes WNo o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments (refer to question -# ): Explain any YES answers and/oraiay;additionaFxocomniendati or any other comments ` Use drawings of facility'to better explain situations�(useadditionai pages -as necessary). J r !i Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 '-e W Phone: 11 b ?,k3 J �flo Date: 511212020