Carpenter,Kristi
From:Wyrick, Scott D
Sent:Wednesday, September 16, 2015 7:07 PM
To:Euliss, Amy
Cc:Wanucha, Dave; Panek, Lindsey F; Suggs, Phillip H
Subject:Re: sediment U2579B permit site 10
Pipe is clean, water is clean and controlled. We will skim the silt in the Creek tomorrow.
Sent from my iPad
On Sep 16, 2015, at 3:54 PM, Euliss, Amy <aeuliss@ncdot.gov> wrote:
We’ve lost some sediment at permit site 10. The sediment is mostly fine materials but would probably
add up to over a 5 gallon bucket. He contractor installed the permitted pipe system, and it had
sediment get into it. I’m not sure when the sediment got into the pipe. It was probably cumulative over
time. There are several drop inlets leading to the pipe. Since the material is so fine, it might have gone
through the inlet protection. We’re working with the contractor to remove the sediment from the
pipe. We’ve also diked the pipe outlet, and installed a couple checks made of coir wattles in the
channel, and we’ll remove any material that accumulates in the channel. The material is very fine, with
a soupy consistency, so removal will be difficult. Today, we began pumping water from the pipe into a
basin to keep the fine sediments out of the stream. We hope to be able to remove what’s in the
channel once the water level drops. Let me know if you have any questions.
Amy Euliss
NCDOT Division 9 Environmental Officer
375 Silas Creek Parkway
Winston Salem, NC 27127
336-747-7802 (work)
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.