Loading...
HomeMy WebLinkAboutNCC233758_ESC Approval Submitted_20240103 1 ro N UNT HENDER5O �!S HENDERSON COUNTY GOVERNMENT SITE DEVELOPMENT DEPARTMENT SOIL ERSOSION AND SEDIMENT CONTROL DIVISION Natalie J. Berry P.E. Deb Johnston, PE Director Assistant Engineer December 18, 2023 LETTER OF APPROVAL WITH CONDITIONS Campen, LLC Attn: Jim Campen 6037 Asheville Higheay Hendersonville,NC 28791 Project Name: Campen, LLC Site Dev. Project ID: SESC 2023-12-02 Acres Approved: 7.54 PIN: 9651-56-1074 County: Henderson City: NA Address: US Highway 25 (35.3948, -82.5047) River Basin: French Broad River Basin Submitted By: Tyson Goforth, PE Date Revd by HC: October 12, 2023 Plan Type: New Revisions Received by HC: December 11, 2023 Dear Mr. Campen, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3)years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553 Letter of Approval with Conditions Campen,LLC December 18,2023 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, pt:AA,ASALOAr-v Assistant Engineer Henderson County Site Development Enclosures: Certificate of Approval NCG01 Fact Sheet ec: Tyson Griswold, PE, Quible &Associates, P.C. Stan Aiken PE, DEQ—Asheville 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553 Letter of Approval with Conditions Campen,LLC December 18,2023 Page 3 of 3 CONDITIONS • THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN TITLED "CAMPEN PROPERTY"AND DATED DECEMBER 11, 2023, IS REFERENCED HERE AND INCORPORTED INTO THIS LETTER OF APPROVAL. • OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER AND FOLLOW THE INSPECTION REQUIREMENTS OF NPDES AND SELF INSPECTION AS DESCRIBED ON SHEET 8 OF THE APPROVED DRAWING WHICH IS INCORPORATED INTO THIS LETTER OF APPROVAL. • FOLLOW ALL STATE AND FEDERAL RULES. • PROVIDE A COPY OF THE HENDERSON COUNTY FLOODWAY FILL PERMIT. • PRE-CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE. CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE. Financial Responsible Ownership Signature: Print Name and Title: Date: 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553