Loading...
HomeMy WebLinkAboutErosion control walk through 12.18.23.pdfC204110-U2519BA/BB Erosion & Sediment Control walk through 12/18/2023. Locally installed rain gauge read 4.75" within 24 hours of rain event that took place on the 17' of December 2023. Y17 off Barefoot Rd. washout through silt fence with sediment runoff to private driveway .5CY sediment loss Site 6 BA by King Pond approximately 4-5CY loss Site 6 BA by King Pond approximately 5CY loss Site 5 BA maintenance Site 4 BA sediment loss approx. 3CY Site 4 BA approximate sediment loss 2CY Site 4 BA sediment loss approx. 6 CY Tier basin Lt-L- STA 395+00 maintenance and repairs Tier basin STA 395+00 Lt-L- maintenance and repairs Site 3 BA unknown amount of sediment loss, stream flow has washed most of it down stream, visible amount 1-2 CY, silt fence needs repairs. Site 3 BA unknown amount of sediment loss, stream flow has washed most of it down stream, visible amount 1-2 CY, silt fence needs repairs. Site 3 BA upstream side of 54" culvert pipe, sediment recovery and maintenance EA i, 3jIs ,f � � — ,r �+ ( ' ems.. ?'• i %�5-- �N�. '{ �" � � . 1• ' y STA 490+00 Rt-L- 48"/54" culvert, headwall area STA 490+00 Lt-L- sediment loss approx. 2-3 CY filled with sediment Sediment loss onto roadway from ditch washout Sediment loss through bore point to ditch Strickland point Strickland Bdge Rd by water point, Bdge Rd by water point, maintenance maintenance Site 1 BB Y17RPC sediment through upstream side of culvert Site 3 BB Y17RPB upstream side of culvert pipe sediment fence failure with sediment loss by headwall Site 1 BB Y17RPC sediment through silt fence, maintenance Site 3 BB Y17RPB downstream side of culvert pipe sediment fence failure with sediment loss Y14 Rt Ditch line failure on several locations with slope failures as close as 8-9FT from EP Site 2 BA unknown sediment loss qty Y14 Rt Ditch line failure on several locations with slope failures as close as 8-91FT from EP